Data Report
Phases /
Contributed by ISK
Date: Fri, 5 Mar 1999 14:45:05 +0200 (EET)
1999 FEB. 5 1 7
FEB. 1 KHL EI PG 00 36 35.3 30 1
FEB. 1 KHL EI SG 00 36 41.8 2
FEB. 1 TOKTEI P 5 1 14.2 3
FEB. 1 VANTI PG 8 30 42.0 45 4
FEB. 1 IZI EI PN 10 7 25.1 25 7
FEB. 1 DST EI PG 10 13 51.1 30 8
FEB. 1 DST EI SG 10 13 53.1 9
FEB. 1 GAZ EI PG 10 22 04.7 40 10
FEB. 1 GAZ EI SG 10 22 16.6 11
FEB. 01 EZC EI P 12 04 30.1 12
FEB. 1 TOKTEI P 12 4 35.0 13
FEB. 1 IZI I PG 12 24 20.3 35 14
FEB. 1 YLV I PG 12 24 21.7 40 15
FEB. 1 IZI EI SG 12 24 24.5 16
FEB. 1 YLV I SG 12 24 25.7 17
FEB. 1 DST EI PG 12 24 32.0 35 18
FEB. 1 BNT EI PN 12 24 34.0 25 19
FEB. 1 EDC I PN 12 24 34.0 30 20
FEB. 1 DST EI SG 12 24 45.0 21
FEB. 1 BNT EI SG 12 24 48.0 22
FEB. 1 MYA I PG 13 54 22.8 30 24
FEB. 1 MYA EI SG 13 54 29.5 25
FEB. 01 HTY EI PG 13 57 02.5 30 26
FEB. 01 HTY EI SG 13 57 04.8 27
FEB. 1 ELL EI PN 14 18 38.0 70 28
FEB. 1 YER EI PG 15 6 7.0 35 29
FEB. 1 YER EI SG 15 6 15.0 30
FEB. 1 ELL EI PN 18 25 38.0 70 31
FEB. 01 LFK EI PN 18 25 39.9 32
FEB. 1 BCK EI PN 18 25 40.0 33
FEB. 1 MYA I PG 19 7 23.4 45 34
FEB. 1 MYA EI SG 19 7 27.6 35
FEB. 1 YER E PN 20 23 57.0 60 36
FEB. 01 EZC EI P 22 30 31.8 37
FEB. 1 SVS I P 22 30 42.9 38
FEB. 1 TOKTEI P 22 30 44.8 39
FEB. 1 IZI EI P 22 31 13.3 40
FEB. 1 YLV EI P 22 31 13.5 41
FEB. 2 TOKTEI PG 2 33 41.8 30 42
FEB. 2 TOKTEI SG 2 33 50.8 43
FEB. 2 DST EI PG 06 00 19.7 35 44
FEB. 2 DST EI SG 06 00 24.7 45
FEB. 2 IZI EI PG 6 0 29.1 35 46
FEB. 2 YLV EI PG 6 0 32.0 35 47
FEB. 2 BNT EI PG 6 0 35.0 25 49
FEB. 2 EDC EI PG 6 0 35.2 25 48
FEB. 2 IZI EI SG 6 0 39.6 50
FEB. 2 YLV EI SG 6 0 46.0 51
FEB. 2 BNT EI SG 6 0 50.0 52
FEB. 2 VANTI PG 8 40 9.0 53
FEB. 2 VANTI SG 8 40 12.0 54
FEB. 2 MYA EI PN 8 57 37.6 40 55
FEB. 02 HRT EI PG 12 59 37.5 25 56
FEB. 2 YLV EI PN 12 59 43.0 30 57
FEB. 2 IZI EI PN 12 59 43.5 35 58
FEB. 02 HRT EI SG 12 59 46.5 59
FEB. 2 KHL EI PG 14 22 12.6 35 60
FEB. 2 KHL EI SG 14 22 25.6 61
FEB. 2 EDC I PG 16 24 26.2 100 63
FEB. 2 BNT I PG 16 24 26.4 80 64
FEB. 2 EDC EI SG 16 24 33.7 65
FEB. 2 BNT I SG 16 24 34.4 66
FEB. 2 ISK EI PG 16 24 36.5 60 67
FEB. 2 YLV I PN 16 24 41.0 90 68
FEB. 2 EZN I PN 16 24 41.7 80 69
FEB. 2 IZI I PN 16 24 42.4 120 70
FEB. 02 HRT EI PN 16 24 42.6 85 71
FEB. 2 ISK EI SG 16 24 51.5 72
FEB. 2 IZM EI PN 16 24 57.4 90 73
FEB. 2 EDC I PG 16 38 37.0 55 74
FEB. 2 BNT I PG 16 38 37.4 30 75
FEB. 2 EDC EI SG 16 38 44.2 76
FEB. 2 BNT I SG 16 38 44.4 77
FEB. 2 ISK EI PG 16 38 47.5 35 78
FEB. 2 YLV EI PN 16 38 50.8 55 79
FEB. 2 EZN EI PN 16 38 51.7 45 80
FEB. 2 IZI EI PN 16 38 53.4 75 81
FEB. 02 HRT EI PN 16 38 54.4 55 82
FEB. 2 ISK EI SG 16 39 2.5 83
FEB. 2 EDC I PG 17 0 39.2 100 84
FEB. 2 BNT I PG 17 00 40.0 80 85
FEB. 2 EZN I PG 17 0 42.7 86
FEB. 2 EDC EI SG 17 0 45.7 87
FEB. 2 BNT I SG 17 00 47.5 88
FEB. 2 EZN EI SG 17 0 53.7 89
FEB. 2 YLV I PN 17 0 57.5 90
FEB. 2 IZI I PN 17 0 57.9 135 91
FEB. 2 IZM EI PN 17 0 58.4 100 92
FEB. 2 ISK E PN 17 0 58.5 60 93
FEB. 02 HRT EI PN 17 01 02.9 90 94
FEB. 2 KHL EI PN 17 01 9.6 70 95
FEB. 02 MDU E PN 17 1 17.4 100 96
FEB. 2 IZM EI PN 20 31 18.4 45 97
FEB. 2 EZN EI PN 20 31 22.0 98
FEB. 3 DIY EI PN 01 33 32.4 110 99
FEB. 3 BINTEI P 01 33 32.8 100
FEB. 03 EZC EI P 1 33 34.3 101
FEB. 3 MYA EI P 1 33 37.2 102
FEB. 3 SVS EI P 1 33 38.2 103
FEB. 03 KVT E P 1 33 38.5 104
FEB. 3 GAZ EI P 01 33 41.7 105
FEB. 03 BNN EI P 1 33 42.0 106
FEB. 03 MDU E P 1 33 47.0 107
FEB. 03 LFK EI P 1 33 52.7 108
FEB. 3 MYA EI P 6 47 38.1 109
FEB. 3 GAZ EI P 06 47 40.6 110
FEB. 3 TOKTEI P 6 47 49.2 111
FEB. 03 LFK E P 6 47 52.0 112
FEB. 03 MDU EI P 6 48 10.1 113
FEB. 3 KHL E P 06 48 13.2 114
FEB. 3 IZI EI P 6 48 17.6 115
FEB. 3 YLV EI P 6 48 18.2 116
FEB. 3 DST E P 06 48 19.2 117
FEB. 3 EDC EI P 6 48 21.7 118
FEB. 3 IZM EI P 06 48 23.7 119
FEB. 3 EDC I PG 6 57 4.7 30 120
FEB. 3 BNT EI PG 6 57 5.0 20 121
FEB. 3 EDC EI SG 6 57 11.7 122
FEB. 3 YLV EI PN 6 57 16.2 35 123
FEB. 3 IZI EI PN 6 57 19.6 40 124
FEB. 3 GAZ EI PG 09 52 22.6 40 125
FEB. 3 GAZ EI SG 09 52 27.6 126
FEB. 03 EZC EI PG 10 42 43.6 35 127
FEB. 03 EZC EI SG 10 42 57.1 128
FEB. 3 IZI I PG 11 46 33.8 30 129
FEB. 3 IZI EI SG 11 46 41.5 130
FEB. 3 EZN EI PG 12 36 35.8 40 131
FEB. 3 EZN E SG 12 36 46.8 132
FEB. 3 EDC EI PN 12 36 52.7 45 133
FEB. 3 BNT EI PN 12 36 54.0 45 134
FEB. 3 IZI E PN 12 37 8.0 70 135
FEB. 3 EZN I PG 12 41 9.8 80 136
FEB. 3 EZN I SG 12 41 16.8 137
FEB. 3 EDC EI PN 12 41 22.7 138
FEB. 3 BNT EI PN 12 41 24.0 70 139
FEB. 3 IZM E PN 12 41 32.0 60 140
FEB. 3 IZI EI PN 12 41 40.5 100 141
FEB. 3 YLV E PN 12 41 41.0 80 142
FEB. 03 HRT EI PG 14 59 37.5 20 143
FEB. 3 YLV EI PG 14 59 41.0 35 144
FEB. 3 IZI EI PG 14 59 44.5 35 145
FEB. 03 HRT EI SG 14 59 46.5 146
FEB. 3 IZI EI SG 14 59 57.5 147
FEB. 03 EZC I PG 16 08 04.4 70 148
FEB. 03 EZC EI SG 16 08 07.9 149
FEB. 3 SVS EI PN 16 8 37.2B 80 150
FEB. 3 TOKTE PN 16 8 41.0 70 151
FEB. 3 ELL EI P 16 10 19.0 152
FEB. 3 IZM E P 16 10 20.0 153
FEB. 03 EZC EI PG 16 24 18.9 30 154
FEB. 03 EZC EI SG 16 24 20.4 155
FEB. 03 EZC EI PG 19 06 40.9 25 156
FEB. 03 EZC EI SG 19 06 43.9 157
FEB. 3 YER EI PG 19 30 12.9 50 158
FEB. 3 ELL EI PN 19 30 14.0 159
FEB. 3 BCK E PN 19 30 31.8 160
FEB. 3 IZM EI PN 19 30 35.9 60 161
FEB. 04 EZC EI PG 01 39 37.1 30 162
FEB. 04 EZC EI SG 01 39 47.1 163
FEB. 4 DST EI PG 03 50 59.7 40 164
FEB. 4 DST EI SG 03 51 1.7 165
FEB. 4 EDC E PG 3 51 11.0 25 166
FEB. 4 IZI EI PN 3 51 11.2 35 167
FEB. 4 YER I PG 3 55 38.7 30 169
FEB. 4 YER I SG 3 55 44.7 170
FEB. 4 IZM EI PG 07 32 47.1 40 171
FEB. 4 YER EI PG 7 32 52.6 37 172
FEB. 4 IZM EI SG 07 32 56.6 173
FEB. 4 YER EI SG 7 33 4.1 174
FEB. 4 IZM EI PG 07 41 30.6 30 175
FEB. 4 IZM EI SG 07 41 41.6 176
FEB. 4 IZI EI PG 8 12 1.1 30 177
FEB. 4 IZI EI SG 8 12 11.6 178
FEB. 4 GAZ EI PG 08 14 13.7 35 179
FEB. 4 GAZ EI SG 08 14 27.7 180
FEB. 4 IZI EI PG 9 23 25.6 30 181
FEB. 4 IZI EI SG 9 23 36.6 182
FEB. 4 IZI EI PG 9 35 59.1 30 183
FEB. 4 IZI EI SG 9 36 9.6 184
FEB. 4 IZI I PG 9 40 7.2 45 185
FEB. 4 YLV EI PG 9 40 13.0 25 186
FEB. 4 IZI EI SG 9 40 18.1 187
FEB. 4 EDC EI PN 9 40 21.2 188
FEB. 4 BNT EI PN 9 40 22.0 30 189
FEB. 04 HRT EI PG 09 48 45.9 20 190
FEB. 04 HRT EI SG 09 48 48.3 191
FEB. 04 HRT EI PG 10 36 25.9 20 192
FEB. 04 HRT EI SG 10 36 26.7 193
FEB. 04 HRT EI PG 10 56 18.3 20 194
FEB. 04 HRT EI SG 10 56 19.3 195
FEB. 04 EZC EI PG 12 40 34.9 20 196
FEB. 04 EZC EI SG 12 40 36.9 197
FEB. 04 HTY EI PG 13 33 34.5 35 198
FEB. 04 HTY EI SG 13 33 36.8 199
FEB. 4 EDC EI PN 14 15 51.7 200
FEB. 04 HTY EI PG 14 35 37.8 25 201
FEB. 04 HTY EI SG 14 35 40.8 202
FEB. 4 IZM EI PG 14 45 25.5 35 203
FEB. 4 EDC EI PN 14 45 29.2 204
FEB. 4 BNT EI PN 14 45 31.0 25 205
FEB. 4 EZN EI PN 14 45 32.0 206
FEB. 4 IZM EI SG 14 45 39.5 207
FEB. 4 IZI E PN 14 45 40.5 50 208
FEB. 04 EZC EI P 19 38 12.8 209
FEB. 4 GAZ EI P 19 38 20.3 210
FEB. 4 TOKTI P 19 38 28.1 211
FEB. 04 BNN EI P 19 38 29.8 212
FEB. 04 KVT EI P 19 38 32.0 213
FEB. 04 MDU I P 19 38 52.9 214
FEB. 04 ISP EI P 19 38 53.0 215
FEB. 4 ELL EI P 19 38 54.0 216
FEB. 04 HRT EI P 19 38 59.3 217
FEB. 4 IZI EI P 19 39 1.3 218
FEB. 4 BNT EI P 19 39 04.4 219
FEB. 4 IZM I P 19 39 8.9 220
FEB. 4 VANTEI P 20 11 28.0 221
FEB. 4 BINTEI P 20 11 48.4 222
FEB. 4 GAZ E P 20 12 21.4B 223
FEB. 4 YER E PN 21 50 46.0 224
FEB. 4 ELL EI P 21 50 57.0 225
FEB. 4 YER I PG 22 13 5.8 35 226
FEB. 4 YER I SG 22 13 9.8 227
FEB. 4 EDC EI PG 23 32 8.2 25 228
FEB. 4 EDC EI SG 23 32 21.7 229
FEB. 5 IZM EI PG 5 14 45.7 40 230
FEB. 5 IZM EI SG 5 14 50.2 231
FEB. 5 IZI EI PG 11 4 30.0 35 232
FEB. 5 IZI EI SG 11 4 40.5 233
FEB. 5 YER EI PG 12 27 53.0 30 234
FEB. 5 YER EI SG 12 28 6.0 235
FEB. 5 IZI EI PG 12 54 27.5 35 236
FEB. 5 IZI EI SG 12 54 38.5 237
FEB. 05 ISP EI PG 14 02 3.0 238
FEB. 5 KHL EI PG 14 02 5.9 120 239
FEB. 5 BCK I PN 14 2 10.0 120 240
FEB. 05 ISP EI SG 14 02 14.0 241
FEB. 5 KHL EI SG 14 02 19.9 242
FEB. 5 DST EI PN 14 02 23.4 110 243
FEB. 05 MDU EI PN 14 2 24.0 120 244
FEB. 5 IZI I PN 14 2 25.5 150 245
FEB. 5 YER E PN 14 2 30.0 100 247
FEB. 05 HRT EI PN 14 02 30.0 70 246
FEB. 5 IZM EI PN 14 02 33.0 130 248
FEB. 5 EDC EI PN 14 2 35.7 90 249
FEB. 5 BNT EI PN 14 02 36.0 110 250
FEB. 5 ISK E PN 14 2 36.0 90 251
FEB. 5 KHL EI PG 14 26 58.9 65 252
FEB. 5 KHL EI SG 14 27 12.9 253
FEB. 5 IZI E PN 14 27 18.5 75 254
FEB. 05 MDU E PN 14 27 19.0 255
FEB. 5 IZM E PN 14 27 27.0 100 256
FEB. 5 TOKTEI P 14 48 41.5 257
FEB. 5 SVS EI P 14 48 43.0 258
FEB. 5 IZI EI P 14 49 0.0 259
FEB. 5 IZI EI PG 15 9 37.9 30 260
FEB. 5 IZI EI SG 15 9 48.9 261
FEB. 5 BINTEI PG 17 30 12.9 45 262
FEB. 5 BINTI SG 17 30 19.9 263
FEB. 05 ISP EI PG 23 22 48.3 264
FEB. 5 KHL EI PG 23 22 51.8 75 265
FEB. 5 BCK EI PN 23 22 55.5 70 266
FEB. 05 ISP EI SG 23 22 59.1 267
FEB. 5 KHL EI SG 23 23 5.3 268
FEB. 5 ELL EI PN 23 23 9.0 269
FEB. 5 DST EI PN 23 23 10.3 60 270
FEB. 5 IZI EI PN 23 23 10.8 100 271
FEB. 05 MDU E PN 23 23 12.0 272
FEB. 5 BNT E PN 23 23 22.0 273
FEB. 06 ISP EI PG 03 36 29.7 274
FEB. 6 KHL EI PG 03 36 33.0 150 275
FEB. 6 BCK I PN 3 36 36.5 130 276
FEB. 06 ISP EI SG 03 36 41.0 277
FEB. 6 ELL EI PN 3 36 50.0 160 278
FEB. 6 IZI I PN 3 36 52.2 279
FEB. 06 MDU I PN 3 36 53.2 100 280
FEB. 6 YLV E PN 3 36 55.0 281
FEB. 6 YER EI PN 3 36 55.7 100 282
FEB. 06 HRT EI PN 03 36 57.7 85 283
FEB. 6 IZM EI PN 03 37 0.7 100 284
FEB. 6 BNT E PN 03 37 02.0 100 285
FEB. 6 EDC EI PN 3 37 3.0 90 286
FEB. 6 GAZ EI PG 07 04 22.5 110 287
FEB. 6 GAZ E SG 07 04 28.4 288
FEB. 6 MYA EI PN 7 4 46.6 50 289
FEB. 6 IZI EI PG 7 14 32.1 30 290
FEB. 6 IZI EI SG 7 14 42.6 291
FEB. 6 IZI I PG 8 6 22.2 45 292
FEB. 6 IZI EI SG 8 6 32.6 293
FEB. 6 SVS EI PG 8 47 15.6 50 294
FEB. 6 SVS EI SG 8 47 20.7 295
FEB. 6 IZM EI PG 09 45 5.6 35 296
FEB. 6 EDC EI PN 9 45 14.7 30 297
FEB. 6 IZM EI SG 09 45 15.6 298
FEB. 6 BNT EI PN 9 45 16.0 299
FEB. 6 IZI EI PN 9 45 23.0 55 300
FEB. 06 HRT EI PG 10 46 56.5 25 301
FEB. 6 IZM EI PG 10 46 58.5 35 302
FEB. 06 HRT EI SG 10 47 02.5 303
FEB. 6 GAZ EI PG 11 27 01.7 45 304
FEB. 6 GAZ EI SG 11 27 15.7 305
FEB. 06 MDU I PN 12 22 13.5 75 306
FEB. 6 BZK I PN 12 22 20.0 60 307
FEB. 06 BYBTI PN 12 22 21.0 65 308
FEB. 06 HRT E PN 12 22 29.0 70 309
FEB. 6 IZI EI PN 12 22 32.0 100 310
FEB. 6 KVT EI PN 12 22 33.0 90 311
FEB. 6 TOKTE PN 12 22 38.0 110 312
FEB. 6 BNN EI PG 15 41 51.0 60 313
FEB. 6 BNN EI SG 15 41 53.0 314
FEB. 6 SVS E PN 15 42 10.3 70 315
FEB. 6 TOKTEI PN 15 42 13.4 55 316
FEB. 6 SVS EI SG 15 42 27.1 317
FEB. 6 EDC I PG 16 33 13.0 35 318
FEB. 6 BNT I PG 16 33 13.4 35 319
FEB. 6 EDC EI SG 16 33 20.2 320
FEB. 6 BNT I SG 16 33 21.4 321
FEB. 06 HRT EI PN 16 33 27.0 33 322
FEB. 6 IZI EI PN 16 33 27.4 50 323
FEB. 6 GAZ EI P 22 06 49.4 325
FEB. 6 DIY E P 22 06 49.6 326
FEB. 6 VANTEI P 22 6 51.0 327
FEB. 6 TOKTE P 22 6 53.0 329
FEB. 6 YLV E P 22 6 53.0 328
FEB. 6 BINTEI P 22 06 53.3 330
FEB. 06 KVT EI P 22 6 58.0 331
FEB. 6 IZI EI P 22 6 58.3 332
FEB. 6 SVS EI P 22 06 59.2 333
FEB. 6 BZK EI P 22 7 0.0 334
FEB. 6 BCK EI P 22 7 1.5 335
FEB. 6 ELL EI P 22 7 2.0 336
FEB. 06 LFK E P 22 7 3.0 337
FEB. 6 YER E P 22 7 5.0 338
FEB. 06 HRT EI P 22 07 06.8 339
FEB. 6 BNT E P 22 07 08.3 340
FEB. 6 KHL I P 22 07 9.4 341
FEB. 7 YLV I PG 0 32 26.8 30 342
FEB. 7 ISK EI PG 0 32 29.8 25 343
FEB. 07 HRT EI PG 00 32 30.0 35 344
FEB. 7 IZI I PG 0 32 31.5 40 345
FEB. 7 YLV EI SG 0 32 31.8 346
FEB. 7 ISK EI SG 0 32 34.8 347
FEB. 07 HRT EI SG 00 32 35.3 348
FEB. 7 IZI EI SG 0 32 37.3 349
FEB. 7 EDC EI PN 0 32 42.7 30 350
FEB. 7 YER EI PN 6 49 37.6 90 351
FEB. 7 ELL EI PN 6 49 47.0 130 352
FEB. 7 BCK EI PN 6 49 58.0 353
FEB. 7 KHL EI PN 06 49 58.8 80 354
FEB. 07 ISP EI PG 08 31 4.8 355
FEB. 7 BCK I PG 8 31 10.3 60 356
FEB. 7 BCK EI SG 8 31 21.3 357
FEB. 7 ELL EI PN 8 31 23.0 60 358
FEB. 7 DST E PN 8 31 28.1 359
FEB. 7 IZI E PN 8 31 34.0 360
FEB. 7 EDC EI PG 11 5 37.7 25 361
FEB. 7 BNT EI PG 11 5 38.0 20 362
FEB. 07 HRT EI PG 11 05 44.0 30 363
FEB. 7 IZI EI PG 11 5 44.1 40 364
FEB. 7 BNT EI SG 11 5 46.0 365
FEB. 7 EDC EI SG 11 5 46.7 366
FEB. 07 HRT EI SG 11 05 57.0 367
FEB. 7 IZI EI SG 11 5 57.1 368
FEB. 7 KHL EI PG 11 06 55.0 35 369
FEB. 7 KHL EI SG 11 06 58 370
FEB. 7 BINTEI P 12 01 19.0 371
FEB. 7 DIY EI P 12 1 21.4 372
FEB. 7 GAZ EI P 12 01 38.2 373
FEB. 07 HTY E P 12 02 08.0B 374
FEB. 7 BNN EI P 12 2 12.4 375
FEB. 7 TOKTEI P 12 2 23.0 376
FEB. 7 IZI EI PG 16 34 27.0 40 377
FEB. 7 IZI EI SG 16 34 40.0 378
FEB. 7 EZN I PN 22 29 16.6 379
FEB. 7 MFT EI PN 22 29 33.8 380
FEB. 7 EDC EI PN 22 29 36.2 240 381
FEB. 7 BNT EI PN 22 29 38.9 382
FEB. 7 DST EI PN 22 29 42.8 383
FEB. 7 ISK E PN 22 29 52.0 200 384
FEB. 7 KHL EI PN 22 29 53.5 200 385
FEB. 7 IZI I PN 22 29 53.8 260 386
FEB. 7 YLV EI PN 22 29 53.8 387
FEB. 07 HRT EI PN 22 29 54.8 260 388
FEB. 7 ELL EI P 22 30 5.0 389
FEB. 7 BCK EI P 22 30 6.8 390
FEB. 7 TOKTEI P 22 30 10.8 391
FEB. 07 MDU E P 22 30 13.0 392
FEB. 7 EZN EI PN 23 38 55.6 90 394
FEB. 7 EDC E PN 23 39 10.0 395
Date: Thu, 11 Mar 1999 11:10:19 +0200 (EET)
1999 FEB. 6 8 1
FEB. 8 EZC EI PG 01 21 24.8 25 1
FEB. 8 EZC EI SG 01 21 30.5 2
FEB. 8 LFK EI PN 1 39 27.5 95 3
FEB. 8 LFK EI SG 1 39 50.0 4
FEB. 8 YER E PN 1 40 6.0B 80 5
FEB. 8 YER I PG 4 28 29.7 35 6
FEB. 8 YER I SG 4 28 32.2 7
FEB. 8 MDU EI PG 5 28 38.5 0 8
FEB. 8 HRT EI PG 05 28 40.2 45 9
FEB. 8 IZI I PG 5 28 41.2 85 10
FEB. 8 YLV EI PG 5 28 42.0 40 11
FEB. 8 ISK EI PG 5 28 49.0 30 12
FEB. 8 HRT EI SG 05 28 49.7 13
FEB. 8 IZI EI SG 5 28 54.2 14
FEB. 8 YLV EI SG 5 28 54.5 15
FEB. 8 DST EI PN 5 28 58.0 55 16
FEB. 8 KHL EI PG 07 45 18.5 35 17
FEB. 8 DST E PN 7 45 22.0 0 18
FEB. 8 YER EI PN 7 45 22.6 40 19
FEB. 8 KHL EI SG 07 45 32.7 20
FEB. 8 IZI E PN 7 45 34.0 55 21
FEB. 8 YER EI SG 7 45 40.6 22
FEB. 8 ISK EI PG 8 14 38.6 30 23
FEB. 8 ISK EI SG 8 14 44.6 24
FEB. 8 LFK EI PN 9 16 28.2 60 25
FEB. 8 HTY EI PN 09 16 36.1 85 26
FEB. 8 IKL EI PN 9 16 39.1 70 27
FEB. 8 VANTI PG 11 20 41.5 80 28
FEB. 8 VANTI SG 11 20 47.5 29
FEB. 8 AGRTEI PN 11 20 52.0 40 30
FEB. 8 AGRTEI SG 11 21 7.0 31
FEB. 8 BINTE PN 11 21 15.0 90 32
FEB. 8 KHL EI PG 14 57 43.0 25 33
FEB. 8 YER EI PN 14 57 48.3 40 34
FEB. 8 KHL EI SG 14 57 56.0 35
FEB. 8 MDU I PG 15 8 43.3 35 36
FEB. 8 HRT EI PG 15 08 43.8 35 37
FEB. 8 YLV EI PG 15 08 48.0 25 39
FEB. 8 IZI EI PG 15 08 48.0 35 38
FEB. 8 MDU I SG 15 8 51.3 40
FEB. 8 HRT EI SG 15 08 53.8 41
FEB. 8 IZI EI SG 15 08 62.5 42
FEB. 8 VANTI PG 20 22 14.4 70 43
FEB. 8 VANTI SG 20 22 21.4 44
FEB. 8 AGRTEI PN 20 22 28.8 40 45
FEB. 8 BINTI PN 20 22 44.4 45 46
FEB. 8 AGRTEI SG 20 22 45.8 47
FEB. 9 TOKTEI P 0 31 9.0 48
FEB. 9 EZC EI PG 02 46 45.7 25 49
FEB. 9 EZC EI SG 02 46 49.1 50
FEB. 9 BINTI PG 03 25 06.3 60 51
FEB. 9 EZC EI PG 03 25 06.5 45 52
FEB. 9 EZC EI SG 03 25 16.8 53
FEB. 9 BINTEI SG 03 25 19.3 54
FEB. 9 EZC EI PG 07 56 59.6 30 55
FEB. 9 EZC EI SG 07 57 09.8 56
FEB. 9 HRT EI PG 08 14 52.0 30 57
FEB. 9 YLV E PG 8 14 53.0 30 58
FEB. 9 HRT EI SG 08 14 57.2 59
FEB. 9 IZI I PG 8 14 57.7 40 60
FEB. 9 YLV EI SG 8 14 58.8 61
FEB. 9 IZI EI SG 8 15 6.2 62
FEB. 9 EDC EI PN 8 15 9.6 30 63
FEB. 09 GAZ EI PN 08 19 53.1 45 64
FEB. 09 GAZ I PG 09 28 10.9 35 65
FEB. 09 GAZ EI SG 09 28 13.9 66
FEB. 9 HRT EI PG 09 59 16.7 20 67
FEB. 9 IZI EI PG 9 59 22.7 40 68
FEB. 9 HRT E SG 09 59 24.0 69
FEB. 9 IZI EI SG 9 59 36.2 70
FEB. 9 DST EI PG 11 31 27.0 35 71
FEB. 9 DST EI SG 11 31 35.0 72
FEB. 9 EDC EI PN 11 31 35.6 30 73
FEB. 9 BNT E PN 11 31 36.0 30 74
FEB. 9 EZN E PN 11 31 41.0 0 75
FEB. 9 IZI EI PN 11 31 44.2 50 76
FEB. 9 IZM EI PN 12 38 1.2 45 77
FEB. 9 HTY EI PG 14 03 32.7 25 78
FEB. 9 HTY EI SG 14 03 35.7 79
FEB. 9 IZM EI PG 14 05 12.2 30 80
FEB. 9 DST EI PG 14 05 16.0 30 81
FEB. 9 EDC EI PN 14 5 20.6 82
FEB. 9 BNT EI PN 14 05 21.2 35 83
FEB. 9 IZM EI SG 14 05 24.2 84
FEB. 9 DST EI SG 14 05 29.0 85
FEB. 9 MDU EI PG 16 32 22.8 25 86
FEB. 9 MDU EI SG 16 32 35.3 87
FEB. 9 YLV EI P 17 39 31.3 88
FEB. 9 ELL EI P 17 39 32.5 89
FEB. 9 KHL EI P 17 39 33.3 90
FEB. 9 HRT E PG 20 41 19.0 30 91
FEB. 9 IZI EI PG 20 41 24.7 30 92
FEB. 9 IZI EI SG 20 41 38.2 93
FEB. 9 IZM EI PG 22 48 37.2 35 94
FEB. 9 IZM EI SG 22 48 44.2 95
FEB. 10 LFK E PN 2 36 21.0 96
FEB. 10 DST EI PG 2 48 41.7 120 97
FEB. 10 DST EI SG 2 48 47.7 98
FEB. 10 BNT EI PG 02 48 49.0 80 99
FEB. 10 EDC I PG 2 48 49.6 70 100
FEB. 10 IZM EI PN 02 48 57.2 80 101
FEB. 10 IZI I PN 2 48 58.2 85 102
FEB. 10 EZN I PN 2 48 58.9 75 103
FEB. 10 YLV I PN 2 48 59.2 60 104
FEB. 10 MFT EI PN 02 48 59.8 60 105
FEB. 10 BNT EI SG 02 49 02.2 106
FEB. 10 EDC EI SG 2 49 2.6 107
FEB. 10 KHL EI PN 02 49 2.8 59 108
FEB. 10 ISK EI PN 2 49 3.3 60 109
FEB. 10 HRT EI PN 02 49 03.7 60 110
FEB. 10 BNN EI PG 03 08 0.4 60 111
FEB. 10 SVS EI PG 3 8 4.2 112
FEB. 10 TOKTEI PG 3 8 09.2 60 113
FEB. 10 BNN EI SG 03 08 10.4 114
FEB. 10 SVS EI SG 3 8 16.9 115
FEB. 10 KVT E PN 03 08 21.5 45 116
FEB. 10 TOKTEI SG 3 8 23.2 117
FEB. 10 HRT EI PG 06 32 43.2 35 118
FEB. 10 IZI EI PG 6 32 51.0 20 119
FEB. 10 HRT EI SG 06 32 51.2 120
FEB. 10 TOKTEI P 9 41 11.2 121
FEB. 10 TOKTEI PN 11 12 32.2 40 122
FEB. 10 KVT EI PN 11 12 37.0 45 123
FEB. 10 IZI EI PG 11 52 38.6 25 124
FEB. 10 IZI EI SG 11 52 49.1 125
FEB. 10 YER E PN 12 1 52.0 126
FEB. 10 YER EI PN 12 2 56.0 110 127
FEB. 10 BCK E P 12 3 7.5 128
FEB. 10 YER E PN 14 5 43.0 90 129
FEB. 10 EZC E PG 14 48 10.0 130
FEB. 10 BINTEI PN 14 48 18.2 80 131
FEB. 10 BINTEI SG 14 48 35.2 132
FEB. 10 VANTE PN 14 48 43.0 133
FEB. 10 TOKTE PN 14 48 50.0 95 134
FEB. 10 KVT E PN 14 48 57.0 90 135
FEB. 10 IZI I PG 15 19 46.1 30 136
FEB. 10 IZI EI SG 15 19 50.1 137
FEB. 10 BNT EI PN 15 19 59.6 25 138
FEB. 10 AGRTEI PG 15 31 26.6 20 139
FEB. 10 AGRTEI SG 15 31 30.1 140
FEB. 11 YER I PG 0 31 35.1 30 141
FEB. 11 YER EI SG 0 31 42.1 142
FEB. 11 EZN EI PN 0 56 45.6 50 143
FEB. 11 MFT E PN 00 56 52.1 70 144
FEB. 11 ISP EI PG 01 52 15.3 145
FEB. 11 ISP EI SG 01 52 20.0 146
FEB. 11 DIY E PN 1 57 0.1 150 147
FEB. 11 BINTI PG 07 23 38.1 50 148
FEB. 11 BINTI SG 07 23 49.1 149
FEB. 11 BINTI PG 08 41 26.1 150
FEB. 11 BINTI SG 08 41 31.1 151
FEB. 11 IZM EI PG 09 55 16.1 35 152
FEB. 11 IZM EI SG 09 55 25.1 153
FEB. 11 IZM EI PG 10 01 6.1 35 154
FEB. 11 IZM EI SG 10 01 17.1 155
FEB. 11 VANTEI PN 10 16 35.1 65 156
FEB. 11 IZM EI PG 10 18 38.1 25 157
FEB. 11 IZM EI SG 10 18 49.1 158
FEB. 11 IZM E PG 11 19 59.1 25 159
FEB. 11 IZM E PG 13 50 2.1 25 160
FEB. 11 IZM EI SG 13 50 15.1 161
FEB. 11 BNN EI PG 14 08 34.3 40 162
FEB. 11 BNN EI SG 14 08 36.8 163
FEB. 11 SVS EI PN 14 8 53.8 164
FEB. 11 TOKTE PN 14 8 55.0 50 165
FEB. 11 SVS EI SG 14 8 70.9 166
FEB. 11 VANTI P 14 13 38.1 167
FEB. 11 BINTEI P 14 14 03.0 168
FEB. 11 EZC EI P 14 14 07.5 169
FEB. 11 GAZ EI P 14 14 26.3 170
FEB. 11 TOKTEI P 14 14 27.1 171
FEB. 11 KVT EI P 14 14 35.0 172
FEB. 11 HTY EI PG 14 25 45.2 45 173
FEB. 11 HTY EI SG 14 25 47.0 174
FEB. 11 EZC EI PG 20 57 21.5 45 175
FEB. 11 EZC EI SG 20 57 27.5 176
FEB. 11 EZC EI PG 21 01 09.3 30 177
FEB. 11 EZC EI SG 21 01 14.5 178
FEB. 11 EZC EI PG 21 22 49.2 25 179
FEB. 11 EZC EI SG 21 22 54.2 180
FEB. 11 HTY EI PG 22 13 29.6 40 181
FEB. 11 GAZ EI PG 22 13 32.8 45 182
FEB. 11 HTY EI SG 22 13 44.0 183
FEB. 11 GAZ EI SG 22 13 47.1 184
FEB. 12 YER I PG 0 25 56.0 30 185
FEB. 12 YER I SG 0 26 1.0 186
FEB. 12 IZI EI PG 8 13 52.3 25 187
FEB. 12 IZI EI SG 8 14 3.0 188
FEB. 12 EDC EI PN 8 14 5.6 189
FEB. 12 GAZ E PN 09 39 08.0 45 190
FEB. 12 IZM EI PG 10 41 44.5 30 191
FEB. 12 EDC EI PN 10 41 52.6 192
FEB. 12 IZM EI SG 10 41 55.0 193
FEB. 12 YER I PG 13 41 12.0 40 194
FEB. 12 YER EI SG 13 41 20.5 195
FEB. 12 IZM EI PG 14 38 48.5 45 196
FEB. 12 YER EI PN 14 39 6.0 45 197
FEB. 12 YER EI SG 14 39 22.0 198
FEB. 12 GAZ I PN 14 43 41.8 145 199
FEB. 12 IKL EI PN 14 43 45.5 120 200
FEB. 12 BNN EI PN 14 43 50.5 95 201
FEB. 12 LFK E PN 14 43 54.0 202
FEB. 12 GAZ EI SG 14 43 57.9 203
FEB. 12 TOKTEI PN 14 44 11.0 204
FEB. 12 IZM EI PG 15 04 5.0 35 205
FEB. 12 IZM EI SG 15 04 8.0 206
FEB. 12 HTY I PG 15 43 36.0 120 207
FEB. 12 HTY EI SG 15 43 49.0 208
FEB. 12 KVT EI P 17 56 36.0 209
FEB. 12 TOKTEI P 17 56 37.0 210
FEB. 12 MDU EI P 17 56 51.0 211
FEB. 12 BNT EI P 17 56 58.9 212
FEB. 12 LFK E P 17 57 4.0 213
FEB. 12 LFK EI PG 20 11 59.2 28 214
FEB. 12 LFK EI PN 21 40 22.7 75 215
FEB. 12 BINTI PG 22 57 56.9 55 216
FEB. 12 EZC EI PG 22 58 05.4 55 217
FEB. 12 EZC EI SG 22 58 17.4 218
FEB. 13 EZC EI PG 01 39 53.9 40 219
FEB. 13 EZC EI SG 01 40 03.7 220
FEB. 13 IZM EI PG 02 17 9.9 30 221
FEB. 13 IZM EI SG 02 17 14.9 222
FEB. 13 IZM EI PG 04 28 48.9 35 223
FEB. 13 IZM EI SG 04 28 58.9 224
FEB. 13 BINTI PG 09 54 16.9 35 225
FEB. 13 BINTI SG 09 54 24.9 35 226
FEB. 13 VANTI PG 11 49 20.9 45 227
FEB. 13 VANTI SG 11 49 25.9 228
FEB. 13 HTY EI PG 12 02 45.7 50 229
FEB. 13 HTY EI SG 12 02 49.4 230
FEB. 13 GAZ EI PG 12 16 02.9 40 231
FEB. 13 GAZ EI SG 12 16 12.5 232
FEB. 13 VANTE P 12 52 54.9 233
FEB. 13 IZM EI PG 16 29 31.6 130 234
FEB. 13 EZN I PN 16 29 37.7 120 235
FEB. 13 IZM EI SG 16 29 44.6 236
FEB. 13 YER EI PN 16 29 47.6 120 237
FEB. 13 DST EI PN 16 29 50.7 120 238
FEB. 13 BNT I PN 16 29 51.1 100 239
FEB. 13 EDC EI PN 16 29 51.6 110 240
FEB. 13 MFT EI PN 16 29 54.6 110 241
FEB. 13 KHL EI PN 16 29 57.0 60 242
FEB. 13 IZI EI PN 16 30 4.6 160 243
FEB. 13 YLV E PN 16 30 5.0 120 244
FEB. 13 ELL EI PN 16 30 7.0 245
FEB. 13 YER I PG 19 28 6.0 45 246
FEB. 13 IZM EI PN 19 28 6.6 70 247
FEB. 13 YER EI SG 19 28 16.5 248
FEB. 13 YER E PN 20 2 24.0 45 249
FEB. 13 HRT EI PG 20 40 14.9 35 250
FEB. 13 YLV EI PG 20 40 18.0 30 251
FEB. 13 HRT EI SG 20 40 18.9 252
FEB. 13 IZI I PG 20 40 19.0 40 253
FEB. 13 YLV EI SG 20 40 25.0 254
FEB. 13 IZI EI SG 20 40 27.0 255
FEB. 13 MDU EI PN 20 40 29.4 40 256
FEB. 13 IZI EI PN 20 56 55.5 35 257
FEB. 13 MDU I PN 21 56 48.9 60 258
FEB. 13 BYBTI PN 21 56 49.4 35 259
FEB. 13 KVT E PN 21 57 2.0 55 260
FEB. 13 IZI E PN 21 57 8.0 262
FEB. 13 MDU E SG 21 57 8.9 261
FEB. 13 YER I PG 23 44 20.0 35 263
FEB. 13 YER I SG 23 44 21.5 264
FEB. 13 IZM EI PG 23 46 12.6 65 265
FEB. 13 YER EI PG 23 46 15.0 45 266
FEB. 13 IZM EI SG 23 46 22.6 267
FEB. 13 YER EI SG 23 46 26.5 268
FEB. 13 DST E PN 23 46 35.5 50 269
FEB. 14 IZM EI PG 04 07 50.4 35 270
FEB. 14 IZM EI SG 04 07 59.4 271
FEB. 14 ELL EI PN 6 11 9.5 45 272
FEB. 14 IKL I PG 10 58 9.2 75 273
FEB. 14 IKL EI SG 10 58 18.2 274
FEB. 14 LFK E PN 10 58 25.0 275
FEB. 14 HTY EI PN 10 58 28.1 55 276
FEB. 14 HTY EI SG 10 58 51.1 277
FEB. 14 EZC EI P 11 34 19.8 278
FEB. 14 KVT EI P 11 34 24.5 279
FEB. 14 TOKTEI P 11 34 26.1 280
FEB. 14 MDU E P 11 34 40.3 281
FEB. 14 BCK EI P 11 34 52.3 282
FEB. 14 LFK EI P 11 34 53.7 283
FEB. 14 ELL EI P 11 34 57.0 284
FEB. 14 IZM EI P 11 48 12.2 285
FEB. 14 ELL EI P 11 48 32.5 286
FEB. 14 IZI EI P 11 48 36.7 287
FEB. 14 BCK EI P 11 48 49.3 288
FEB. 14 DST EI PG 11 56 5.2 35 289
FEB. 14 EDC EI PG 11 56 8.1 30 290
FEB. 14 IZM EI PG 11 56 8.2 28 291
FEB. 14 BNT EI PG 11 56 08.7 30 292
FEB. 14 DST EI SG 11 56 18.2 293
FEB. 14 IZI E PN 11 56 20.0 45 294
FEB. 14 BNT EI SG 11 56 23.2 296
FEB. 14 IZM EI SG 11 56 23.2 295
FEB. 14 MDU I PN 13 49 38.8 80 297
FEB. 14 BYBTI PN 13 49 39.3 55 298
FEB. 14 BZK EI PN 13 49 41.0 299
FEB. 14 KVT E PN 13 49 50.0 300
FEB. 14 IZI E PN 13 49 58.0 85 301
FEB. 14 MDU EI SG 13 50 1.0 302
FEB. 14 BYBTEI SG 13 50 1.0 303
FEB. 14 MDU EI PN 13 56 59.8 45 304
FEB. 14 GAZ EI PN 16 17 13.9 95 305
FEB. 14 EZC EI PN 16 17 19.3 65 306
FEB. 14 BINTEI PN 16 17 20.0 307
FEB. 14 TOKTE PN 16 17 29.0 100 308
FEB. 14 GAZ EI SG 16 17 33.9 309
FEB. 14 EZC EI PN 16 41 04.5 65 310
FEB. 14 EZC EI SG 16 41 20.5 311
FEB. 14 DIY EI PN 16 59 40.4 312
FEB. 14 GAZ I PN 16 59 41.6 150 313
FEB. 14 EZC EI PN 16 59 48.8 100 314
FEB. 14 SVS EI PN 16 59 54.0 315
FEB. 14 BNN EI PN 16 59 54.2 316
FEB. 14 DIY EI SG 16 59 60.2 317
FEB. 14 SVS EI SG 16 59 83.5 318
FEB. 14 TOKTEI PN 17 0 1.0 135 319
FEB. 14 YER E PG 20 9 58.0 65 320
FEB. 14 YER EI SG 20 10 2.9 321
FEB. 14 IZM E PN 20 10 17.0 65 322
FEB. 14 ELL EI PN 20 10 23.5 323
FEB. 14 IZM E SG 20 10 35.0 65 324
FEB. 14 YER EI PG 20 11 30.9 45 325
FEB. 14 YER EI SG 20 11 35.9 326
FEB. 14 IZM EI PG 20 11 49.0 40 327
FEB. 14 IZM EI SG 20 12 8.0 328
FEB. 14 YER EI PG 20 18 25.4 55 329
FEB. 14 YER EI SG 20 18 31.0 330
FEB. 14 IZM EI PN 20 18 43.9 65 331
FEB. 14 ELL EI PN 20 18 50.5 332
FEB. 14 IZM EI SG 20 19 1.9 333
FEB. 14 IZM EI PG 23 08 27.9 35 334
FEB. 14 YER EI PG 23 8 31.8 40 335
FEB. 14 IZM EI SG 23 08 37.9 336
FEB. 14 YER EI SG 23 8 43.8 337
FEB. 14 BCK EI PG 23 34 18.9 40 338
FEB. 14 ELL EI PN 23 34 25.5 40 339
FEB. 14 BCK E SG 23 34 30.9 340
Date: Tue, 23 Mar 1999 15:24:49 +0200 (EET)
1999 FEB. 7 15 2
FEB. 15 YER EI PG 2 5 1.8 45 1
FEB. 15 YER EI SG 2 5 7.3 2
FEB. 15 IZM EI PN 2 5 21.3 55 3
FEB. 15 IZI EI PG 4 20 39.8 40 4
FEB. 15 YLV EI PG 4 20 43.0 25 5
FEB. 15 IZI EI SG 4 20 43.3 6
FEB. 15 DST EI PG 4 20 46.0 40 7
FEB. 15 YLV EI SG 4 20 49.8 8
FEB. 15 DST EI SG 4 20 57.8 9
FEB. 15 TOK I PG 5 41 24.7 45 10
FEB. 15 TOK I SG 5 41 29.2 11
FEB. 15 KVT EI PG 05 41 31.5 35 12
FEB. 15 KVT EI SG 05 41 42.0 13
FEB. 15 MUD E P 5 57 7.0 14
FEB. 15 BNT EI P 05 57 22.8 15
FEB. 15 MUD I PN 7 6 46.2 65 16
FEB. 15 ELL EI PN 7 27 34.0 150 17
FEB. 15 YER E PN 7 27 40.0 110 18
FEB. 15 BCK EI PN 7 27 46.5 19
FEB. 15 ISP E PN 7 27 50.0 20
FEB. 15 IZM E PN 7 28 2.0 21
FEB. 15 IZM EI PG 8 10 20.0 75 22
FEB. 15 KHL EI PG 8 10 25.1 35 23
FEB. 15 DST EI PN 8 10 28.0 65 24
FEB. 15 YER EI PN 8 10 28.0 55 25
FEB. 15 IZM EI SG 8 10 29.8 26
FEB. 15 EDC EI PN 8 10 39.0 50 28
FEB. 15 BNT EI PN 8 10 39.0 60 27
FEB. 15 KHL EI SG 8 10 39.1 29
FEB. 15 IZI EI PN 8 10 42.0 90 30
FEB. 15 YLV E PN 8 10 45.0 55 31
FEB. 15 MUD E PN 8 10 55.0 32
FEB. 15 DST EI PG 9 35 33.7 30 33
FEB. 15 IZI E PG 9 35 49.0 34
FEB. 15 BNT EI PG 09 35 51.2 35
FEB. 15 YLV EI PG 9 35 51.7 30 36
FEB. 15 YLV EI SG 9 36 6.7 37
FEB. 15 KVT EI PN 10 06 29.0 45 38
FEB. 15 GAZ I PG 10 35 14.3 35 39
FEB. 15 GAZ EI SG 10 35 16.3 40
FEB. 15 IZI EI PG 10 46 47.2 30 41
FEB. 15 IZI EI SG 10 47 1.2 42
FEB. 15 YER EI PG 10 55 14.7 35 43
FEB. 15 IZM EI PN 10 55 15.7 45 44
FEB. 15 YER EI SG 10 55 25.2 45
FEB. 15 IZI I PG 12 12 41.7 30 46
FEB. 15 IZI EI SG 12 12 46.2 47
FEB. 15 ISP EI PG 13 11 33.5 48
FEB. 15 KHL EI PG 13 11 35.3 65 49
FEB. 15 BCK EI PG 13 11 39.0 60 50
FEB. 15 ISP EI SG 13 11 40.3 51
FEB. 15 KHL EI SG 13 11 44.3 52
FEB. 15 ELL EI PN 13 11 50.0 70 53
FEB. 15 BCK EI SG 13 11 50.3 54
FEB. 15 YER E PN 13 11 55.0 60 55
FEB. 15 IZM EI PN 13 11 63.0 65 56
FEB. 15 IZI EI PN 13 12 4.7 90 57
FEB. 15 MUD E PN 13 12 9.0 58
FEB. 15 MUD I PG 16 24 55.6 35 59
FEB. 15 IZI EI PG 16 25 1.3 40 60
FEB. 15 YLV EI PG 16 25 1.6 30 61
FEB. 15 MUD I SG 16 25 4.1 62
FEB. 15 YLV EI SG 16 25 14.6 63
FEB. 15 IZI EI SG 16 25 14.7 64
FEB. 15 YER EI PN 17 30 23.6 45 65
FEB. 15 LFK EI PN 19 16 32.1 48 66
FEB. 15 IZM E PG 20 46 3.6 30 67
FEB. 15 IZM EI SG 20 46 18.6 68
FEB. 15 MUD I PN 23 57 17.1 69
FEB. 16 IZM EI PG 1 44 44.1 40 70
FEB. 16 IZM EI SG 1 44 55.6 71
FEB. 16 VAN EI PN 2 28 53.5 70 72
FEB. 16 IZM EI PG 2 42 46.6 30 73
FEB. 16 IZM EI SG 2 43 0.6 74
FEB. 16 VAN E PN 2 45 55.5 75
FEB. 16 YER I PG 3 9 44.1 76
FEB. 16 IZM EI PN 3 10 8.6 40 77
FEB. 16 BNT I PG 3 12 22.6 35 78
FEB. 16 VAN I PG 6 11 40.5 79
FEB. 16 VAN I SG 6 11 45.5 80
FEB. 16 DST EI PG 7 27 22.5 34 81
FEB. 16 MUD I PN 8 41 28.5 90 82
FEB. 16 BOY I PN 8 41 29.0 60 83
FEB. 16 BZK EI PN 8 41 29.0 70 84
FEB. 16 KVT EI PN 08 41 40.0 75 85
FEB. 16 TOK E PN 8 41 45.0 100 86
FEB. 16 HRT EI PN 08 41 45.0 60 87
FEB. 16 IZI EI PN 8 41 47.5 90 88
FEB. 16 YLV E PN 8 41 48.0 89
FEB. 16 SVS E PN 8 41 51.0 90
FEB. 16 BOY EI PN 9 27 6.3 30 91
FEB. 16 IZI EI PN 9 55 52.0 25 92
FEB. 16 KHL EI PG 10 09 4.0 45 93
FEB. 16 ISP EI PN 10 09 7.7 94
FEB. 16 YER EI PN 10 9 9.0 95
FEB. 16 BCK EI PN 10 9 10.1 40 96
FEB. 16 KHL EI SG 10 09 14.0 97
FEB. 16 IZM E PN 10 09 20.0 40 98
FEB. 16 IZM EI PG 11 34 1.5 30 99
FEB. 16 BNT EI PN 11 34 9.5 45 100
FEB. 16 IZM EI SG 11 34 13.5 101
FEB. 16 IZI E PN 11 34 21.0 102
FEB. 16 BNT EI SG 11 34 27.0 103
FEB. 16 IZM EI PG 11 54 39.3 35 104
FEB. 16 IZM EI SG 11 54 44.0 105
FEB. 16 IZI I PG 15 21 56.1 50 106
FEB. 16 IZI EI SG 15 22 0.0 107
FEB. 16 IZM EI PN 15 38 24.5 75 108
FEB. 16 EDC EI PN 15 38 37.4 70 109
FEB. 16 BNT EI PN 15 38 38.4 80 110
FEB. 16 DST EI PN 15 38 41.4 75 111
FEB. 16 YER E PN 15 38 45.0 112
FEB. 16 YLV E PN 15 38 53.0 113
FEB. 16 ELL EI PN 17 2 4.5 70 114
FEB. 16 YER E PN 17 2 16.0 115
FEB. 16 ISP EI PG 18 21 7.0 116
FEB. 16 ISP EI SG 18 21 11.5 117
FEB. 16 GAZ I PG 19 53 44.5 30 118
FEB. 16 GAZ EI SG 19 53 48.6 119
FEB. 16 BOY I SG 22 52 35.1 120
FEB. 17 IZM EI PG 0 06 4.0 95 121
FEB. 17 IZM EI SG 0 06 15.9 122
FEB. 17 EDC EI PN 0 6 23.0 65 123
FEB. 17 BNT I PN 0 6 23.4 80 125
FEB. 17 DST EI PN 0 06 23.4 85 124
FEB. 17 YER E PN 0 6 24.0 60 126
FEB. 17 IZI E PN 0 6 36.0 90 127
FEB. 17 YLV E PN 0 6 37.0 128
FEB. 17 DYB E PG 0 48 13.0 80 129
FEB. 17 DYB E SG 0 48 25.6 130
FEB. 17 HTY EI PG 00 58 40.2 25 131
FEB. 17 HTY EI SG 00 58 45.4 132
FEB. 17 HRT EI PG 01 49 33.8 20 133
FEB. 17 HRT EI SG 01 49 39.8 134
FEB. 17 EZN EI PN 03 03 56.7 65 135
FEB. 17 DST EI PG 03 38 53.4 40 136
FEB. 17 DST EI SG 03 38 58.4 137
FEB. 17 IZI EI PN 3 39 11.3 30 138
FEB. 17 BNT EI PN 4 50 22.4 60 139
FEB. 17 IZI E PN 4 50 29.0 80 140
FEB. 17 MUD I PN 8 25 34.3 100 141
FEB. 17 BZK EI PN 8 25 38 142
FEB. 17 ARI EI PG 08 48 45.8 40 143
FEB. 17 ARI EI SG 08 48 58.8 144
FEB. 17 BOY I PN 9 25 35.3 65 145
FEB. 17 HRT EI PN 09 25 51.3 75 146
FEB. 17 IZI EI PN 9 25 53.8 100 147
FEB. 17 YLV E PN 9 25 54.0 100 149
FEB. 17 TOK E PN 9 25 54.0 120 148
FEB. 17 BNN EI PN 09 25 59.2 80 150
FEB. 17 GAZ EI PG 10 00 49.8 40 151
FEB. 17 GAZ EI SG 10 01 00.4 152
FEB. 17 IZI E PN 10 39 47.0 50 153
FEB. 17 BZK EI PN 10 49 3.0 154
FEB. 17 IZM EI PG 11 04 49.7 28 155
FEB. 17 IZM EI SG 11 04 57.2 156
FEB. 17 BOY I PG 11 48 53.7 40 157
FEB. 17 BOY I SG 11 48 59.7 158
FEB. 17 GAZ EI PG 13 23 26.0 35 159
FEB. 17 GAZ EI SG 13 23 39.1 160
FEB. 17 HRT EI PG 13 30 2.0 30 161
FEB. 17 YLV EI PG 13 30 6.2 30 162
FEB. 17 IZI I PG 13 30 8.2 163
FEB. 17 YLV E SG 13 30 18.0 164
FEB. 17 IZI EI SG 13 30 19.2 165
FEB. 17 ERZ EI PG 13 36 23.3 30 166
FEB. 17 ERZ EI SG 13 36 38.3 167
FEB. 17 IZI EI PG 13 41 33.2 25 168
FEB. 17 IZI EI SG 13 41 45.2 169
FEB. 17 IZI EI PG 14 0 15.2 25 170
FEB. 17 YLV EI PG 14 0 18.0 30 171
FEB. 17 IZI EI SG 14 0 19.2 172
FEB. 17 KCT EI PG 14 0 24.0 173
FEB. 17 YLV EI SG 14 0 27.0 174
FEB. 17 EDC EI PG 14 47 37.9 20 175
FEB. 17 EDC EI SG 14 47 44.9 176
FEB. 17 YLV E PG 14 47 48.0 30 177
FEB. 17 IZI EI PN 14 47 49.7 30 178
FEB. 17 YLV E SG 14 48 1.0 179
FEB. 17 HTY EI PG 15 20 58.7 50 180
FEB. 17 HTY EI SG 15 21 01.2 181
FEB. 17 DST EI PG 20 40 11.1 40 182
FEB. 17 DST EI SG 20 40 17.1 183
FEB. 17 IZI EI PG 20 40 24.2 45 184
FEB. 17 KHL EI PG 20 40 26.0 20 185
FEB. 17 YLV EI PG 20 40 27.2 40 186
FEB. 17 BNT EI PG 20 40 29.0 30 188
FEB. 17 EDC EI PG 20 40 29.0 187
FEB. 17 DST EI PG 20 44 57.1 30 189
FEB. 17 DST EI SG 20 44 58.6 190
FEB. 17 IZI EI PN 20 45 13.2 35 191
FEB. 17 YLV EI PN 20 45 16.2 35 192
FEB. 17 YLV EI PG 20 55 8.1 33 193
FEB. 17 IZI EI PN 22 9 9.7 25 194
FEB. 17 BOY I PG 22 52 27.6 25 195
FEB. 17 DST EI PG 22 54 55.6 35 196
FEB. 17 DST EI SG 22 55 1.1 197
FEB. 17 IZI EI PG 22 55 6.0 40 198
FEB. 17 YLV EI PG 22 55 8.0 199
FEB. 17 IZI EI SG 22 55 17.2 200
FEB. 17 YLV EI SG 22 55 22.6 201
FEB. 17 DST EI PG 23 14 5.1 75 202
FEB. 17 DST EI SG 23 14 10.1 203
FEB. 17 IZI EI PG 23 14 16.1 80 204
FEB. 17 YLV EI PG 23 14 19.0 50 205
FEB. 17 EDC EI PG 23 14 21.9 50 206
FEB. 17 BNT I PG 23 14 22.1 45 207
FEB. 17 HRT EI PN 23 14 24.0 45 208
FEB. 17 KHL EI PN 23 14 25.1 45 209
FEB. 17 ISK EI PN 23 14 26.6 35 210
FEB. 17 IZI EI SG 23 14 27.0 211
FEB. 17 IZM EI PN 23 14 32.0 60 213
FEB. 17 YLV EI SG 23 14 33.0 212
FEB. 17 MUD EI PN 23 14 33.1 70 214
FEB. 17 BNT EI SG 23 14 37.1 215
FEB. 17 IZI EI PG 23 36 49.1A 35 216
FEB. 17 YLV EI PG 23 36 53.1 30 217
FEB. 17 IZI EI SG 23 37 1.6 218
FEB. 17 YLV EI SG 23 37 7.6 219
FEB. 17 IZI EI PG 23 38 46.1A 30 220
FEB. 17 YLV EI PG 23 38 50.1 30 221
FEB. 17 IZI EI SG 23 38 58.6 222
FEB. 17 YLV EI SG 23 39 3.1 223
FEB. 17 DST EI PG 23 55 44.1 50 224
FEB. 17 DST EI SG 23 55 49.1 225
FEB. 17 IZI EI PG 23 55 53.0 55 226
FEB. 17 YLV EI PG 23 55 57.1 35 227
FEB. 17 BNT EI PG 23 55 58.1 228
FEB. 17 EDC EI PN 23 55 58.9 229
FEB. 17 HRT EI PN 23 56 00.5 40 230
FEB. 17 KHL EI PN 23 56 4.1 32 231
FEB. 17 IZI EI SG 23 56 4.6 232
FEB. 17 YLV EI SG 23 56 10.1 233
FEB. 17 MUD E PN 23 56 11.0 234
FEB. 18 DST EI PG 00 50 42.1 35 235
FEB. 18 DST EI SG 00 50 47.1 236
FEB. 18 IZI EI PG 0 50 51.1 35 237
FEB. 18 IZI EI SG 0 51 3.1 238
FEB. 18 SVS I PG 1 36 44.2 50 239
FEB. 18 SVS EI SG 1 36 52.0 240
FEB. 18 TOK EI PN 1 36 53.6 70 241
FEB. 18 ERZ EI PN 01 36 58.1 55 242
FEB. 18 TOK EI SG 1 37 9.0 243
FEB. 18 MUD I PN 2 12 31.6 50 244
FEB. 18 IZM E PN 3 04 5.1 75 245
FEB. 18 MUD EI PN 7 10 4.5 45 246
FEB. 18 DST EI PG 07 51 15.0 25 247
FEB. 18 IZI EI PG 7 51 31.5 35 248
FEB. 18 IZI EI SG 7 51 44.5 249
FEB. 18 HTY EI PG 10 45 37.2 45 250
FEB. 18 HTY EI SG 10 45 46.5 251
FEB. 18 IZI I PG 11 57 19.8 30 252
FEB. 18 IZI EI SG 11 57 23.5 253
FEB. 18 YLV I PG 17 40 59.4 25 254
FEB. 18 YLV EI SG 17 41 5.9 255
FEB. 18 ARI EI PG 21 16 55.5 35 256
FEB. 18 ARI EI SG 21 17 04.0 257
FEB. 18 BNG I PG 22 00 00.9 90 258
FEB. 18 BNG EI SG 22 00 13.9 259
FEB. 18 DYB EI PG 22 1 4.0 55 260
FEB. 18 ERZ EI PN 22 01 09.4 65 261
FEB. 18 DYB EI SG 22 1 15.5 262
FEB. 18 ERZ EI SG 22 01 27.2 263
FEB. 18 BNN EI PN 22 01 43.0B 264
FEB. 18 LFK EI PN 23 4 21.0 49 265
FEB. 18 DST EI PG 23 21 20.8 30 266
FEB. 18 DST EI SG 23 21 24.8 267
FEB. 19 IZM EI P 1 3 10.8 268
FEB. 19 GAZ I PG 01 37 22.7 55 269
FEB. 19 GAZ EI SG 01 37 26.7 270
FEB. 19 GAZ EI PG 02 33 17.2 35 271
FEB. 19 GAZ EI SG 02 33 22.2 272
FEB. 19 IZM EI PG 4 40 43.8 43 273
FEB. 19 IZM EI SG 4 40 49.3 274
FEB. 19 BNN EI PG 09 23 58.6 55 275
FEB. 19 BNN EI SG 09 24 0.3 276
FEB. 19 ELL EI P 10 30 0.5 277
FEB. 19 IZM EI PG 10 35 58.5 23 278
FEB. 19 IZM EI SG 10 36 8.7 279
FEB. 19 BNG I PG 11 26 01.7 50 280
FEB. 19 BNG EI SG 11 26 17.7 281
FEB. 19 BNG I PG 11 30 42.7 40 282
FEB. 19 ISP EI PG 12 29 39.0 283
FEB. 19 KHL EI PG 12 29 40.8 70 284
FEB. 19 BCK EI PN 12 29 44.0 80 285
FEB. 19 ISP EI SG 12 29 48.3 286
FEB. 19 DST EI PN 12 29 56.7 70 287
FEB. 19 IZI EI PN 12 29 59.1 70 288
FEB. 19 MUD I PN 12 30 1.6 85 289
FEB. 19 IZM EI PN 12 30 6.0 290
FEB. 19 EDC EI PN 12 30 9.9 291
FEB. 19 KHL EI PG 13 25 38.8 35 292
FEB. 19 KHL EI SG 13 25 52.8 293
FEB. 19 IZM EI PG 17 18 2.1 30 294
FEB. 19 IZM EI SG 17 18 10.6 295
FEB. 19 IZM EI PG 17 45 27.6 30 296
FEB. 19 IZM EI SG 17 45 31.6 297
FEB. 19 ARI EI PN 18 00 36.1 120 298
FEB. 19 ARI EI SG 18 00 58.1 299
FEB. 19 BNG EI PN 18 01 04.1 300
FEB. 19 ERZ E PN 18 01 21.0 301
FEB. 19 GAZ EI PN 18 01 49.7B 302
FEB. 19 IZM EI PG 19 24 18.5 25 303
FEB. 19 IZM EI SG 19 24 26.5 304
FEB. 19 YER I PG 19 38 49.5 35 305
FEB. 19 YER I SG 19 38 52.0 306
FEB. 19 BNG I PG 22 42 06.5 307
FEB. 19 DST EI PG 23 01 51.0 25 308
FEB. 19 DST EI SG 23 01 53.5 309
FEB. 20 EDC EI PG 0 32 39.6 20 310
FEB. 20 EDC EI SG 0 32 45.9 311
FEB. 20 BNT I PG 2 43 12.5 40 312
FEB. 20 EDC I PG 2 43 13.4 55 313
FEB. 20 BNT I SG 2 43 17.5 314
FEB. 20 EDC EI SG 2 43 18.4 315
FEB. 20 DST EI PG 02 43 19.5 60 316
FEB. 20 CTT EI PG 02 43 27.5 30 317
FEB. 20 IZI EI PG 2 43 27.9 45 318
FEB. 20 DST EI SG 02 43 28.5 319
FEB. 20 EZN EI PN 02 43 33.7 45 320
FEB. 20 IZM EI PN 02 43 40.5 55 321
FEB. 20 IZI EI SG 2 43 41.9 322
FEB. 20 CTT EI SG 02 43 42.0 323
FEB. 20 BNT I PG 5 14 56.4 45 324
FEB. 20 EDC I PG 5 14 57.4 60 325
FEB. 20 CTT I PG 05 15 01.5 55 326
FEB. 20 BNT I SG 5 15 4.4 327
FEB. 20 EDC EI SG 5 15 4.9 328
FEB. 20 EZN I PN 05 15 11.4 60 329
FEB. 20 CTT I SG 05 15 12.5 330
FEB. 20 DST EI PN 5 15 13.0 60 331
FEB. 20 IZI EI PN 5 15 14.0 50 332
FEB. 20 IZM E PN 05 15 27.0 55 333
FEB. 20 HTY EI PN 05 30 25.1 75 334
FEB. 20 YER EI P 8 55 12.9 335
FEB. 20 IZM EI P 8 55 16.4 336
FEB. 20 IZI I PG 10 10 20.3 25 337
FEB. 20 IZI EI SG 10 10 25.3 338
FEB. 20 EDC E PN 10 10 33.0 339
FEB. 20 HRT EI PG 10 15 16.8 25 340
FEB. 20 YLV EI PG 10 15 19.0 341
FEB. 20 IZI EI PG 10 15 23.0 35 342
FEB. 20 HRT EI SG 10 15 25.0 343
FEB. 20 IZI EI SG 10 15 35.3 344
FEB. 20 IZM E PN 10 28 57.4 75 345
FEB. 20 BOY I PG 11 28 46.3 30 346
FEB. 20 BOY I SG 11 28 48.3 347
FEB. 20 EDC I PG 11 53 43.7 30 348
FEB. 20 EDC EI SG 11 53 49.9 349
FEB. 20 DST EI PG 11 53 50.4 30 350
FEB. 20 IZI EI PG 11 53 58.0 35 351
FEB. 20 DST EI SG 11 53 59.4 352
FEB. 20 IZI EI SG 11 54 12.8 353
FEB. 20 ERZ EI PN 13 09 58.8 45 354
FEB. 20 YER E PN 14 27 36.0 355
FEB. 20 ELL EI PN 14 27 50.5 356
FEB. 20 YER EI PG 18 27 3.8 37 357
FEB. 20 YER EI SG 18 27 13.3 358
FEB. 20 IZM EI PN 18 27 17.3 50 359
FEB. 20 IZM EI PG 18 57 39.3 35 360
FEB. 20 IZM EI SG 18 57 49.3 361
FEB. 20 ERZ EI PG 19 38 04.7 45 362
FEB. 20 ERZ EI SG 19 38 09.2 363
FEB. 20 YER EI P 20 3 50.9 364
FEB. 20 ELL EI P 20 4 4.5 365
FEB. 20 EDC EI PG 23 38 12.4 30 366
FEB. 20 EDC EI SG 23 38 17.9 367
FEB. 21 IZM EI P 00 14 37.2 368
FEB. 21 EZN EI P 00 14 38.0 369
FEB. 21 ELL EI P 0 15 8.5 370
FEB. 21 YER I PG 2 4 0.3 43 371
FEB. 21 YER I SG 2 4 6.1 372
FEB. 21 ELL EI PN 2 4 17.5 40 373
FEB. 21 IZM E PN 2 04 25.1 374
FEB. 21 ELL E SG 2 4 35.0 375
FEB. 21 ARI EI PN 3 18 53.4 75 376
FEB. 21 ARI EI SG 3 19 08.9 377
FEB. 21 BNG I PN 3 19 09.1 100 378
FEB. 21 VAN EI PN 3 19 11.0 379
FEB. 21 ERZ E PN 3 19 13.0 105 380
FEB. 21 IZM EI PG 3 23 51.1 25 381
FEB. 21 IZM EI SG 3 23 53.1 382
FEB. 21 YER I PG 5 14 15.6 30 383
FEB. 21 YER I SG 5 14 17.6 384
FEB. 21 ERZ EI PG 05 19 17.6 25 385
FEB. 21 ERZ EI SG 05 19 24.4 386
FEB. 21 ERZ EI PN 09 40 40.0 50 387
FEB. 21 IZI I PG 10 43 28.0 30 388
FEB. 21 IZI EI SG 10 43 30.0 389
FEB. 21 EDC EI PN 10 43 43.4 25 390
FEB. 21 GAZ EI PG 10 56 29.5 40 391
FEB. 21 GAZ EI SG 10 56 37.9 392
FEB. 21 IZM EI PG 10 59 33.0 25 393
FEB. 21 IZM EI SG 10 59 46.0 394
FEB. 21 IZM EI PG 11 12 46.0 30 395
FEB. 21 IZM EI SG 11 13 1.0 396
FEB. 21 LFK EI PN 12 6 49.6 50 397
FEB. 21 IZM EI PG 13 16 49.0 35 398
FEB. 21 EDC EI PN 13 16 57.4 399
FEB. 21 IZM EI SG 13 17 2.0 400
FEB. 21 IZM EI PG 13 47 15.0 40 401
FEB. 21 EDC EI PN 13 47 21.9 402
FEB. 21 IZM EI SG 13 47 27.0 403
FEB. 21 DST EI PG 15 16 58.5 50 404
FEB. 21 DST EI SG 15 17 3.0 405
FEB. 21 EDC EI PN 15 17 14.4 30 406
FEB. 21 IZI EI PN 15 17 15.5 45 407
FEB. 21 IZM EI PN 15 17 19.0 35 408
FEB. 21 IZM EI PG 16 16 1.0 55 409
FEB. 21 YER EI PG 16 16 2.5 40 410
FEB. 21 YER EI SG 16 16 17.0 411
FEB. 21 YER EI PG 16 40 9.5 75 412
FEB. 21 ELL EI PN 16 40 23.5 80 413
FEB. 21 YER EI SG 16 40 23.5 414
FEB. 21 IZM EI PN 16 40 26.0 80 415
FEB. 21 BZK EI P 17 16 53.0 416
FEB. 21 GAZ EI PN 17 46 45.4 65 417
FEB. 21 ELL EI PN 17 48 17.5 210 418
FEB. 21 BCK EI PN 17 48 17.5 190 419
FEB. 21 ISP EI PN 17 48 21.1 420
FEB. 21 KHL EI PN 17 48 32.0 125 421
FEB. 21 YER EI PN 17 48 35.5 180 422
FEB. 21 IKL EI PN 17 48 35.9 110 423
FEB. 21 IZM EI PN 17 48 51.0 170 424
FEB. 21 MUD EI PN 17 48 56.9 165 425
FEB. 21 IZI EI PN 17 48 57.0 150 426
FEB. 21 HTY EI PN 17 49 02.0 125 428
FEB. 21 HRT EI PN 17 49 02.0 100 427
FEB. 21 BNT EI PN 17 49 4.4 429
FEB. 21 EDC EI PN 17 49 4.4 110 430
FEB. 21 EZN EI PN 17 49 10.7 120 431
FEB. 21 GAZ EI PN 17 49 13.2 432
FEB. 21 KVT EI P 18 16 35.0 433
FEB. 21 SVS EI P 18 16 36.0 434
FEB. 21 TOK I P 18 16 39.4 435
FEB. 21 BOY E P 18 16 48.0 436
FEB. 21 GAZ EI P 18 16 56.7 437
FEB. 21 MUD EI P 18 17 28.9B 438
FEB. 21 HRT EI P 18 17 39.0 439
FEB. 21 IZI EI P 18 17 45.9 440
FEB. 21 DST I P 18 17 57.0 441
FEB. 21 EDC EI P 18 17 59.4 442
FEB. 21 ELL EI P 18 18 3.5 443
FEB. 21 IZM I P 18 18 15.0 444
FEB. 21 EZN EI P 18 18 16.8 445
FEB. 21 ELL EI PN 18 28 5.5 40 446
FEB. 21 EZN EI PG 19 39 03.0 40 447
FEB. 21 ISP EI PG 21 13 55.3 448
FEB. 21 KHL EI PG 21 13 56.4 58 449
FEB. 21 ISP EI SG 21 14 1.8 450
FEB. 21 BCK I PG 21 14 2.0 60 451
FEB. 21 KHL EI SG 21 14 3.6 452
FEB. 21 BCK EI SG 21 14 14.0 453
FEB. 21 ELL EI PN 21 14 14.5 60 454
FEB. 21 YER E PN 21 14 19.0 60 455
FEB. 21 IZM EI PN 21 14 26.0 55 456
Date: Tue, 23 Mar 1999 14:38:22 +0200 (EET)
1999 FEB. 8 22 2
FEB. 22 EZN I P 1 19 59.0 1
FEB. 22 IZM EI PG 4 54 37.6 25 2
FEB. 22 IZM EI SG 4 54 51.1 3
FEB. 22 YER EI P 4 55 8.1 4
FEB. 22 IZM EI P 4 55 17.1 5
FEB. 22 IZM EI PG 6 5 39.1 40 6
FEB. 22 DST EI PN 6 5 43.6 38 7
FEB. 22 EDC EI PN 6 5 44.0 35 8
FEB. 22 IZM EI SG 6 5 51.1 9
FEB. 22 EDC EI SG 6 6 2.0 10
FEB. 22 MFT EI PG 6 55 4.6 20 11
FEB. 22 MFT EI SG 6 55 11.7 12
FEB. 22 EDC EI PG 6 55 14.1 25 13
FEB. 22 KCT EI PG 6 55 21.5 14
FEB. 22 EDC EI SG 6 55 25.1 15
FEB. 22 KCT EI SG 6 55 38.0 16
FEB. 22 TOK EI PN 9 22 53.0 45 17
FEB. 22 KVT EI PN 9 22 55.0 40 18
FEB. 22 KVT EI SG 9 23 13.0 19
FEB. 22 IZM EI PG 9 26 10.9 40 20
FEB. 22 IZM EI SG 9 26 13.9 21
FEB. 22 LFK EI PG 10 50 34.7 20 22
FEB. 22 LFK EI SG 10 50 39.7 23
FEB. 22 HRT EI PG 11 43 45.1 30 24
FEB. 22 HRT EI SG 11 43 49.6 25
FEB. 22 IZI I PG 11 43 50.2 40 26
FEB. 22 MUD EI PN 11 43 57.2 45 27
FEB. 22 IZI EI SG 11 43 58.2 28
FEB. 22 IZI I PG 11 53 13.7 25 29
FEB. 22 IZI EI SG 11 53 17.7 30
FEB. 22 YER EI PN 12 36 56.6 105 31
FEB. 22 IZM EI PG 13 52 43.6 30 32
FEB. 22 IZM EI SG 13 52 53.6 33
FEB. 22 TOK EI P 14 00 22.4 34
FEB. 22 KVT E P 14 00 24.0 35
FEB. 22 GAZ EI P 14 00 26.7 36
FEB. 22 ELL EI P 14 00 56.0B 37
FEB. 22 DST EI PG 19 31 52.3 50 38
FEB. 22 DST EI SG 19 31 57.3 39
FEB. 22 IZI EI PG 19 32 0.6 60 40
FEB. 22 EDC EI PN 19 32 7.6 35 41
FEB. 22 BNT EI PN 19 32 8.6 40 42
FEB. 22 HRT EI PN 19 32 10.1 35 43
FEB. 22 IZI EI SG 19 32 12.6 44
FEB. 22 DST EI PG 19 57 42.3 35 45
FEB. 22 DST EI SG 19 57 46.3 46
FEB. 22 IZI EI PN 19 57 57.6 35 47
FEB. 22 EDC E PN 19 57 59.0 48
FEB. 22 EDC EI SG 19 58 13.0 49
FEB. 22 LFK EI PN 21 6 54.0 280 50
FEB. 22 IKL EI PN 21 7 8.0 160 51
FEB. 22 LFK E SG 21 7 12.0 52
FEB. 22 HTY EI PN 21 7 25.5 160 53
FEB. 22 ELL EI PN 21 7 26.0 230 54
FEB. 22 BCK EI PN 21 7 29.6B170 55
FEB. 22 ISP EI PN 21 7 35.0 56
FEB. 22 YER EI PN 21 7 44.0 190 57
FEB. 22 GAZ EI PN 21 7 44.3 215 58
FEB. 22 KHL I PN 21 7 46.0 150 59
FEB. 22 BNN EI PN 21 7 52.6 60
FEB. 22 IZM EI PN 21 8 3.5 120 61
FEB. 22 MUD EI PN 21 8 8.0 62
FEB. 22 IZI E PN 21 8 11.0 190 63
FEB. 22 TOK EI PN 21 8 13.0 64
FEB. 22 KHL I PG 22 35 21.0 25 65
FEB. 22 KHL I SG 22 35 26.0 66
FEB. 22 LFK EI PN 23 20 43.5 60 67
FEB. 22 LFK EI SG 23 21 3.5 68
FEB. 22 IZM EI PG 23 54 50.9 25 69
FEB. 22 DST I PG 23 54 55.8 70
FEB. 22 IZM EI SG 23 55 1.9 71
FEB. 22 EZN E PN 23 55 2.0 72
FEB. 22 EDC E PN 23 55 2.0 30 73
FEB. 22 DST EI SG 23 55 09.5 74
FEB. 23 IZM EI PG 5 4 22.4 25 75
FEB. 23 EZN EI PN 5 4 24.5 30 76
FEB. 23 DST EI PN 5 4 25.8 45 77
FEB. 23 EDC EI PN 5 4 29.1 78
FEB. 23 IZM EI SG 5 4 34.4 79
FEB. 23 LFK EI PN 07 44 24.9 90 80
FEB. 23 IKL EI PN 7 44 36.4 70 81
FEB. 23 HTY EI PN 07 44 39.6 85 82
FEB. 23 LFK EI SG 07 44 53.9 83
FEB. 23 KHL I PG 7 52 14.5 25 84
FEB. 23 KHL I SG 7 52 24.5 85
FEB. 23 HTY EI PG 09 00 37.1 45 86
FEB. 23 HTY EI SG 09 00 41.6 87
FEB. 23 GAZ EI PG 10 08 49.6 35 88
FEB. 23 GAZ EI SG 10 09 00.3 89
FEB. 23 IZM EI PG 11 40 17.2 35 90
FEB. 23 IZM EI SG 11 40 29.5 91
FEB. 23 HTY EI PG 14 30 41.6 30 92
FEB. 23 HTY EI SG 14 30 44.2 93
FEB. 23 BNG E PN 14 55 08.9 65 94
FEB. 23 GAZ EI PN 14 55 10.8 95 95
FEB. 23 ELL I PG 18 40 46.0 140 96
FEB. 23 BCK I PG 18 40 48.0 110 97
FEB. 23 ELL I SG 18 40 53.0 98
FEB. 23 ISP EI PN 18 40 55.5 99
FEB. 23 BCK EI SG 18 40 57.0 100
FEB. 23 KHL I PN 18 41 7.0 90 101
FEB. 23 YER EI PN 18 41 9.1 90 102
FEB. 23 ISP EI SG 18 41 09.8 103
FEB. 23 IKL EI PN 18 41 19.6 60 104
FEB. 23 IZM EI PN 18 41 26.6 60 105
FEB. 23 DST EI PG 19 11 4.6 50 106
FEB. 23 KHL EI PG 19 11 09.0 25 107
FEB. 23 IZI EI PN 19 11 13.5 30 108
FEB. 23 DST EI SG 19 11 13.6 109
FEB. 23 KHL EI SG 19 11 22.0 110
FEB. 23 ERZ EI P 19 16 33.6 111
FEB. 23 GAZ EI P 19 16 42.0 112
FEB. 23 IZM EI PG 22 36 30.8 25 113
FEB. 23 IZM EI SG 22 36 45.3 114
FEB. 23 BNG I PG 22 42 47.5 50 115
FEB. 23 BNG I SG 22 42 56.5 116
FEB. 24 IZM EI PG 04 38 43.4 30 117
FEB. 24 IZM EI SG 04 38 52.4 118
FEB. 24 BCK I PG 5 39 48.5 40 119
FEB. 24 BCK I SG 5 39 59.5 120
FEB. 24 ELL I PG 7 4 13.0 100 121
FEB. 24 BCK I PG 7 4 13.6 70 122
FEB. 24 BCK EI SG 7 4 20.6 123
FEB. 24 ELL EI SG 7 4 22.0 124
FEB. 24 KHL I PN 7 4 32.5 60 125
FEB. 24 YER EI PN 7 4 35.8 60 126
FEB. 24 IKL EI PN 7 4 46.7 65 127
FEB. 24 IZI EI PN 7 4 58.7 128
FEB. 24 ERZ EI PG 08 42 35.7 55 129
FEB. 24 ERZ EI SG 08 42 44.2 130
FEB. 24 HTY I PG 13 58 32.5 55 131
FEB. 24 HTY EI SG 13 58 35.3 132
FEB. 24 GAZ I PG 14 41 32.2 35 133
FEB. 24 GAZ EI SG 14 41 35.2 134
FEB. 24 IZM EI PG 15 37 8.2 60 135
FEB. 24 IZM EI SG 15 37 15.2 136
FEB. 24 YER EI PG 15 37 18.2 40 137
FEB. 24 YER EI SG 15 37 32.2 138
FEB. 24 IZM EI PN 16 10 4.2 170 139
FEB. 24 YER EI PN 16 10 8.7 140
FEB. 24 EZN E PN 16 10 10.0 141
FEB. 24 EDC E PN 16 10 21.0 142
FEB. 24 KHL EI PN 16 10 27.0 143
FEB. 24 ELL EI PN 16 10 27.0 144
FEB. 24 BNT EI PN 16 10 28.0 145
FEB. 24 BCK E PN 16 10 35.3 146
FEB. 24 CTT EI PN 16 10 39.2 147
FEB. 24 IZI EI PN 16 10 42.2 148
FEB. 24 MUD E PN 16 10 57.0 149
FEB. 24 LFK E P 16 11 05.0 150
FEB. 24 GAZ EI PG 18 37 45.1 25 151
FEB. 24 GAZ EI SG 18 37 55.3 152
FEB. 24 DST EI PG 18 40 44.0 140 153
FEB. 24 IZI I PG 18 40 52.6 190 154
FEB. 24 KCT EI PN 18 40 53.0 155
FEB. 24 YLV EI PN 18 40 56.0 156
FEB. 24 BNT EI PN 18 40 59.0 120 157
FEB. 24 EDC I PN 18 40 59.1 110 158
FEB. 24 HRT EI PN 18 41 01.7 130 159
FEB. 24 KHL I PN 18 41 2.5 95 160
FEB. 24 ISK EI PN 18 41 04.0 161
FEB. 24 IZI EI SG 18 41 5.1 162
FEB. 24 CTT I PN 18 41 07.0 80 163
FEB. 24 MFT EI PN 18 41 09.0 95 164
FEB. 24 IZM EI PN 18 41 9.4 130 165
FEB. 24 MUD I PN 18 41 11.0 155 166
FEB. 24 ISP E PN 18 41 14.0 167
FEB. 24 YER E PN 18 41 20.0 90 168
FEB. 24 ELL EI PN 18 41 26.0 169
FEB. 24 DST EI PG 18 51 17.0 45 170
FEB. 24 DST EI SG 18 51 22.0 171
FEB. 24 IZI EI PG 18 51 26.0 50 172
FEB. 24 BNT EI PG 18 51 32.0 30 173
FEB. 24 EDC EI PG 18 51 32.6 35 174
FEB. 24 HRT EI PN 18 51 34.2 35 175
FEB. 24 IZI EI SG 18 51 39.0 176
FEB. 24 BNT EI SG 18 51 47.0 177
FEB. 24 DST EI PG 18 54 6.0 40 178
FEB. 24 DST EI SG 18 54 12.0 179
FEB. 24 IZI EI PG 18 54 14.5 55 180
FEB. 24 EDC EI PN 18 54 21.1 35 181
FEB. 24 BNT EI PN 18 54 22.0 35 182
FEB. 24 IZI EI SG 18 54 27.5 183
FEB. 24 DST EI PG 19 15 55.0 30 184
FEB. 24 DST EI SG 19 16 1.0 185
FEB. 24 IZI EI PG 19 16 5.5 30 186
FEB. 24 EDC E PN 19 16 12.0 25 187
FEB. 24 IZI EI SG 19 16 17.0 188
FEB. 24 IZI EI PG 20 12 23.8 30 189
FEB. 24 IZI EI SG 20 12 37.8 190
FEB. 24 YER E PN 22 48 15.0 70 191
FEB. 24 IZM EI PN 22 48 20.7 80 192
FEB. 24 ERZ I PG 23 19 55.2 45 193
FEB. 24 ERZ EI SG 23 19 57.2 194
FEB. 25 MFT EI PG 01 30 47.6 120 195
FEB. 25 EDC I PG 1 30 54.4 115 196
FEB. 25 BNT I PG 01 30 55.5 140 197
FEB. 25 CTT EI PG 01 31 00.0 90 198
FEB. 25 EDC EI SG 1 31 2.1 199
FEB. 25 BNT I SG 01 31 02.5 200
FEB. 25 ISK I PN 1 31 07.0 201
FEB. 25 CTT EI SG 01 31 10.5 202
FEB. 25 DST EI PN 1 31 11.5 110 203
FEB. 25 IZI I PN 1 31 12.5 160 204
FEB. 25 HRT EI PN 1 31 13.3 125 205
FEB. 25 IZM EI PN 1 31 24.5 120 206
FEB. 25 MUD EI PN 1 31 31.0 130 207
FEB. 25 KHL I PN 1 31 32.0 75 208
FEB. 25 KHL I PG 2 14 4.4 30 209
FEB. 25 KHL EI SG 2 14 12.4 210
FEB. 25 DST EI PG 2 36 4.5 75 211
FEB. 25 DST EI SG 2 36 11.5 212
FEB. 25 KHL I PG 2 36 15.4 40 213
FEB. 25 IZI I PN 2 36 16.8 80 214
FEB. 25 EDC EI PN 2 36 21.6 45 215
FEB. 25 BNT EI PN 2 36 22.5 50 216
FEB. 25 HRT EI PN 2 36 24.5 45 217
FEB. 25 IZM EI PN 2 36 25.5 60 218
FEB. 25 KHL I SG 2 36 28.4 219
FEB. 25 CTT EI PN 2 36 30.0 30 220
FEB. 25 MUD EI PN 2 36 32.4 65 221
FEB. 25 BNG EI PG 4 38 31.2 40 222
FEB. 25 ERZ EI PG 4 38 39.6 40 223
FEB. 25 ERZ EI SG 4 38 52.5 224
FEB. 25 ELL EI PG 8 1 2.8 55 225
FEB. 25 BCK EI PG 8 1 4.2 50 226
FEB. 25 ELL EI SG 8 1 10.0 227
FEB. 25 BCK EI SG 8 1 13.2 228
FEB. 25 YER EI PN 8 1 25.5 45 229
FEB. 25 IZM EI PN 9 28 30.0 230
FEB. 25 IZI EI PN 9 28 34.0 40 231
FEB. 25 KVT EI PN 9 49 47.0 45 232
FEB. 25 TOK EI PN 9 49 50.0 233
FEB. 25 KVT EI SG 9 50 06.0 234
FEB. 25 GAZ EI PG 10 16 29.9 40 235
FEB. 25 GAZ EI SG 10 16 42.2 236
FEB. 25 DST EI PG 13 57 53.2 70 237
FEB. 25 DST EI SG 13 57 58.7 238
FEB. 25 IZI I PG 13 58 4.2 110 239
FEB. 25 KHL I PG 13 58 4.4 55 240
FEB. 25 BNT EI PN 13 58 08.9 65 241
FEB. 25 EDC EI PN 13 58 9.6 55 242
FEB. 25 HRT EI PN 13 58 12.1 45 243
FEB. 25 IZM EI PN 13 58 13.2 80 244
FEB. 25 KHL I SG 13 58 17.4 245
FEB. 25 MUD EI PN 13 58 19.7 85 246
FEB. 25 YER E PN 13 58 21.0 70 247
FEB. 25 GAZ EI PG 14 50 26.9 35 248
FEB. 25 GAZ EI SG 14 50 29.4 249
FEB. 25 BNN EI PG 15 00 20.2 50 250
FEB. 25 BNN EI SG 15 00 24.3 251
FEB. 25 SVS EI PN 15 0 33.1 75 252
FEB. 25 TOK EI PN 15 0 37.7 55 253
FEB. 25 SVS EI SG 15 0 48.3 75 254
FEB. 25 ISP EI PG 15 15 2.0 255
FEB. 25 ISP EI SG 15 15 6.7 256
FEB. 25 IZM EI PG 15 15 49.6 55 257
FEB. 25 IZM EI SG 15 15 57.6 258
FEB. 25 DST E PN 15 16 7.0 40 259
FEB. 25 EDC EI PN 15 16 7.6 40 260
FEB. 25 BNT EI PN 15 16 9.0 261
FEB. 25 MFT E PN 15 16 12.0 262
FEB. 25 IZI E PN 15 16 21.0 80 263
FEB. 25 BCK I PG 15 46 57.5 35 264
FEB. 25 BCK I SG 15 47 3.5 265
FEB. 25 DST I PG 17 29 16.0 266
FEB. 25 DST I SG 17 29 22.0 267
FEB. 25 KHL E PG 17 29 27.0 268
FEB. 25 IZI EI PN 17 29 28.0 40 269
FEB. 25 KHL EI SG 17 29 40.0 270
FEB. 25 EZN I PG 18 31 42.2 45 271
FEB. 25 IZM EI PG 18 31 43.9 50 272
FEB. 25 EZN EI SG 18 31 55.2 273
FEB. 25 IZM EI SG 18 31 56.4 274
FEB. 25 EDC EI PN 18 31 57.3 50 275
FEB. 25 DST EI PN 18 31 59.0 276
FEB. 25 IZM EI PG 18 35 9.4 30 277
FEB. 25 IZM EI SG 18 35 18.4 278
FEB. 25 LEF I PG 18 41 59.9 65 279
FEB. 25 LEF I SG 18 42 10.9 280
FEB. 25 IKL EI PN 18 42 17.9 100 281
FEB. 25 ELL EI PN 18 42 28.0 160 282
FEB. 25 BCK EI PN 18 42 33.8B130 283
FEB. 25 HTY EI PN 18 42 37.7 115 284
FEB. 25 ISP EI PN 18 42 39.0 285
FEB. 25 YER EI PN 18 42 45.4 140 286
FEB. 25 KHL I PN 18 42 49.1 100 287
FEB. 25 GAZ EI PN 18 42 56.4 160 288
FEB. 25 IZM EI PN 18 43 5.9 130 289
FEB. 25 GAZ EI P 19 07 17.6 290
FEB. 25 HRT EI P 19 07 31.3 291
FEB. 25 IZI EI P 19 7 37.3 292
FEB. 25 BNT EI P 19 07 44.7 293
FEB. 25 ELL EI P 19 7 51.0 294
FEB. 25 HRT EI PG 19 16 17.8 40 295
FEB. 25 HRT EI SG 19 16 20.8 296
FEB. 25 IZI I PG 19 16 23.5 70 297
FEB. 25 IZI EI SG 19 16 30.8 298
FEB. 25 CTT I PN 19 16 36.0 30 299
FEB. 25 BNT EI PN 19 16 42.5 35 300
FEB. 25 EDC EI PN 19 16 43.0 35 301
FEB. 25 YER I PG 19 33 50.6 40 302
FEB. 25 YER I SG 19 33 52.8 303
FEB. 25 BCK I PG 19 38 11.8 60 304
FEB. 25 BCK I SG 19 38 16.8 305
FEB. 25 ELL EI PN 19 38 27.0 70 306
FEB. 25 IZM E PG 19 45 25.3 30 307
FEB. 25 DST EI PN 19 45 31.0 308
FEB. 25 IZM EI SG 19 45 34.3 309
FEB. 25 EDC EI PN 19 45 36.1 310
FEB. 25 BNT E PN 19 45 37.0 311
FEB. 25 IZI EI PN 19 45 44.0 55 312
FEB. 25 VAN EI PN 23 12 59.0 45 313
FEB. 25 DST I PG 23 16 2.0 314
FEB. 25 IZI I PN 23 16 8.9 35 315
FEB. 25 DST EI SG 23 16 9.0 316
FEB. 25 EDC E PN 23 16 15.0 317
FEB. 25 BNT E PN 23 16 15.2 318
FEB. 25 EZN I PG 23 29 31.4 25 319
FEB. 25 EZN I SG 23 29 34.4 320
FEB. 25 DST EI PG 23 54 38.6 45 321
FEB. 25 DST EI SG 23 54 45.1 322
FEB. 25 IZI EI PG 23 54 47.6 50 323
FEB. 25 EDC EI PN 23 54 54.1 324
FEB. 25 BNT EI PN 23 54 54.2 40 325
FEB. 25 IZI EI SG 23 54 59.6 326
FEB. 26 ISP EI PG 01 20 24.1 327
FEB. 26 BCK EI PG 1 20 28.2 30 328
FEB. 26 KHL I PG 1 20 28.4 30 329
FEB. 26 KHL I SG 1 20 37.4 330
FEB. 26 BCK EI SG 1 20 38.2 331
FEB. 26 DST I PG 3 06 03.0 30 332
FEB. 26 DST I SG 3 06 08.0 333
FEB. 26 IZI EI PG 3 6 11.3 35 334
FEB. 26 BNT E PN 3 06 19.0 30 335
FEB. 26 EDC E PN 3 06 20.0 336
FEB. 26 IZI EI SG 3 6 23.3 337
FEB. 26 CTT EI PG 7 27 18.8 40 338
FEB. 26 ISK EI PN 7 27 26.2 25 339
FEB. 26 MFT EI PN 7 27 27.6 340
FEB. 26 EDC I PN 7 27 32.2 30 341
FEB. 26 BNT EI PN 7 27 32.5 30 342
FEB. 26 HRT EI PN 7 27 35.6 45 343
FEB. 26 IZI EI PN 7 27 38.1 45 344
FEB. 26 BNT EI SG 7 27 49.5 345
FEB. 26 EDC I PG 7 47 48.1 40 346
FEB. 26 BNT EI PG 7 47 49.0 45 347
FEB. 26 CTT EI PG 7 48 03.3 40 348
FEB. 26 DST EI PG 7 48 3.6 40 349
FEB. 26 IZI EI PN 7 48 8.6 50 350
FEB. 26 EZN EI PN 7 48 09.8 35 351
FEB. 26 HRT E PN 7 48 12.0 35 352
FEB. 26 CTT EI SG 7 48 16.3 353
FEB. 26 DST EI SG 7 48 16.6 354
FEB. 26 IZI EI PG 9 40 27.5 35 355
FEB. 26 IZI EI SG 9 40 38.5 356
FEB. 26 YER EI PN 10 21 50.5 100 357
FEB. 26 ELL EI PN 10 22 01.0 358
FEB. 26 IZM EI PN 10 22 7.4 80 359
FEB. 26 KHL E PN 10 22 14.0 360
FEB. 26 YER EI PN 10 28 53.5 35 361
FEB. 26 YER I PG 10 44 4.8 35 362
FEB. 26 YER EI SG 10 44 7.5 363
FEB. 26 YER EI PN 11 1 24.4 55 364
FEB. 26 GAZ EI PG 12 15 35.5 30 365
FEB. 26 GAZ EI SG 12 15 40.9 366
FEB. 26 YER EI PN 12 17 55.9 45 367
FEB. 26 IZM EI PG 12 29 40.3 30 368
FEB. 26 EDC E PN 12 29 45.0 369
FEB. 26 BNT E PN 12 29 46.0 370
FEB. 26 EZN EI PN 12 29 46.5 30 371
FEB. 26 IZM EI SG 12 29 54.3 372
FEB. 26 IZI EI PN 12 29 55.2 45 373
FEB. 26 VAN I PG 12 33 2.4 90 374
FEB. 26 ARI EI PN 12 33 10.8 45 375
FEB. 26 VAN I SG 12 33 12.4 376
FEB. 26 IZM EI PN 13 15 40.3 190 377
FEB. 26 EZN EI PN 13 15 55.5 378
FEB. 26 YER E PN 13 16 6.0B 379
FEB. 26 ELL E P 13 16 25.0 380
FEB. 26 IZI EI P 13 16 25.2 381
FEB. 26 ELL E PN 13 35 57.0 382
FEB. 26 YER EI PN 13 36 0.0 120 383
FEB. 26 KHL E PN 13 36 17.0 384
FEB. 26 IZM E PN 13 36 20.0 385
FEB. 26 IKL EI PN 13 36 31.2 85 386
FEB. 26 ISP EI PG 13 56 59.1 387
FEB. 26 BCK I PG 13 57 3.9 100 388
FEB. 26 ISP EI SG 13 57 6.2 389
FEB. 26 KHL I PN 13 57 11.0 90 390
FEB. 26 BCK I SG 13 57 15.9 391
FEB. 26 ELL EI PN 13 57 19.0 130 392
FEB. 26 DST EI PN 13 57 29.2 75 393
FEB. 26 MUD EI PN 13 57 29.7 110 394
FEB. 26 YER E PN 13 57 30.0 100 395
FEB. 26 IZI I PN 13 57 31.8 120 396
FEB. 26 HRT EI PN 13 57 36.5 75 397
FEB. 26 IZM EI PN 13 57 37.3 95 398
FEB. 26 IKL EI PN 13 57 39.2 90 399
FEB. 26 ISK E PN 13 57 42.0 400
FEB. 26 EDC EI PN 13 57 42.1 401
FEB. 26 LFK E PN 13 57 47.0 402
FEB. 26 YLV EI PG 14 19 31.0 403
FEB. 26 IZI I PG 14 19 31.2 50 404
FEB. 26 IZI EI SG 14 19 35.2 405
FEB. 26 HRT EI PG 14 19 36.3 35 406
FEB. 26 HRT EI SG 14 19 43.3 407
FEB. 26 CTT EI PG 14 19 43.8 35 408
FEB. 26 DST EI PN 14 19 44.2 40 409
FEB. 26 EDC EI PN 14 19 45.6 30 410
FEB. 26 BNT EI PN 14 19 46.0 411
FEB. 26 IZM EI PG 14 36 0.2 30 412
FEB. 26 IZM EI SG 14 36 11.2 413
FEB. 26 IZM EI PG 15 06 44.7 35 414
FEB. 26 EZN E PN 15 06 51.0 415
FEB. 26 IZM EI SG 15 06 58.2 416
FEB. 26 IZM EI PG 21 43 6.7 35 417
FEB. 26 EDC EI PN 21 43 07.5 418
FEB. 26 BNT E PN 21 43 08.0 30 419
FEB. 26 EZN E PN 21 43 12.0 25 420
FEB. 26 IZI EI PN 21 43 18.7 55 421
FEB. 26 IZM EI SG 21 43 21.7 422
FEB. 27 VAN I PN 0 25 31.6 70 423
FEB. 27 IZI EI PN 1 23 32.5 30 424
FEB. 27 EZN I PN 3 0 42.4 80 425
FEB. 27 IZM EI PN 3 0 45.4 110 426
FEB. 27 BNT E PN 3 1 00.0 427
FEB. 27 EDC E PN 3 1 00.0 428
FEB. 27 EZN EI SG 3 1 14.4 429
FEB. 27 IZI E PN 3 1 15.0 120 430
FEB. 27 EZN EI PN 3 11 56.4 35 431
FEB. 27 IZM EI PN 3 11 58.4 65 432
FEB. 27 VAN I PG 4 21 9.4 85 433
FEB. 27 VAN EI SG 4 21 14.4 434
FEB. 27 ARI EI PG 5 21 06.0 55 435
FEB. 27 ARI EI SG 5 21 13.3 436
FEB. 27 BNG EI PN 5 21 30.4 55 437
FEB. 27 IZI EI PG 6 59 47.2 30 438
FEB. 27 IZI EI SG 6 59 58.2 439
FEB. 27 ERZ EI PG 07 37 09.7 20 440
FEB. 27 ERZ EI SG 07 37 13.8 441
FEB. 27 GAZ EI PG 08 52 32.3 45 442
FEB. 27 GAZ EI SG 08 52 42.8 443
FEB. 27 IZI I PG 9 38 6.1 40 444
FEB. 27 IZI EI SG 9 38 17.1 445
FEB. 27 GAZ EI PG 09 46 20.3 45 446
FEB. 27 GAZ EI SG 09 46 22.7 447
FEB. 27 DST EI PG 10 13 36.0 75 448
FEB. 27 DST EI SG 10 13 43.0 449
FEB. 27 IZI I PG 10 13 44.7 90 450
FEB. 27 EDC EI PN 10 13 52.1 50 451
FEB. 27 BNT I PN 10 13 53.0 452
FEB. 27 HRT EI PN 10 13 53.3 50 453
FEB. 27 KHL I PN 10 13 53.9 35 454
FEB. 27 IZI EI SG 10 13 56.5 455
FEB. 27 CTT EI PN 10 13 58.0 45 456
FEB. 27 MUD E PN 10 14 1.0 457
FEB. 27 IZM E PN 10 14 2.0 458
FEB. 27 EZN EI PN 10 14 6.8 60 459
FEB. 27 HRT EI PG 10 15 12.5 25 460
FEB. 27 HRT EI SG 10 15 18.5 461
FEB. 27 IZM EI PG 10 32 36.0 30 462
FEB. 27 EZN EI PN 10 32 43.8 35 463
FEB. 27 IZM EI SG 10 32 47.0 464
FEB. 27 BNT EI PN 10 32 49.0 30 465
FEB. 27 EDC EI PN 10 32 49.6 466
FEB. 27 MUD EI PN 10 44 30.0 50 467
FEB. 27 MUD EI SG 10 44 52.5 468
FEB. 27 DST EI PG 11 40 47.0 45 469
FEB. 27 DST EI SG 11 40 53.0 470
FEB. 27 IZI EI PG 11 40 55.4 60 471
FEB. 27 BNT EI PN 11 41 03.0 35 472
FEB. 27 EDC EI PN 11 41 3.1 35 473
FEB. 27 IZI EI SG 11 41 9.4 474
FEB. 27 IZM EI PG 12 00 30.4 40 475
FEB. 27 IZM EI SG 12 00 40.9 476
FEB. 27 IZM EI PN 12 06 19.9 30 477
FEB. 27 EZN EI PN 12 06 25.9 35 478
FEB. 27 BCK EI PG 12 19 58.2 45 479
FEB. 27 BCK E SG 12 20 8.2 480
FEB. 27 HTY EI PG 12 33 32.4 45 481
FEB. 27 HTY EI SG 12 33 36.9 482
FEB. 27 KVT EI PG 12 48 21.0 35 483
FEB. 27 TOK EI PG 12 48 25.5 40 484
FEB. 27 BOY I PG 12 48 25.9 35 485
FEB. 27 KVT EI SG 12 48 30.5 486
FEB. 27 TOK EI SG 12 48 38.5 487
FEB. 27 BOY I SG 12 48 39.4 488
FEB. 27 VAN I PG 13 58 38.9 80 489
FEB. 27 VAN I SG 13 58 51.9 490
FEB. 27 EZN EI PN 14 08 51.0 30 491
FEB. 27 DST EI PG 14 14 45.3 40 492
FEB. 27 DST EI SG 14 14 51.8 493
FEB. 27 IZI EI PG 14 14 54.8 40 494
FEB. 27 BNT EI PN 14 15 02.5 30 495
FEB. 27 IZI EI SG 14 15 8.8 496
FEB. 27 BNT EI SG 14 15 18.5 497
FEB. 27 GAZ I PG 14 39 06.3 35 498
FEB. 27 GAZ EI SG 14 39 08.4 499
FEB. 27 IZI I PG 14 57 39.8 75 500
FEB. 27 IZI EI SG 14 57 44.3 501
FEB. 27 DST EI PN 14 57 52.8 35 502
FEB. 27 BNT EI PN 14 57 59.5 30 503
FEB. 27 EDC EI PN 14 57 59.6 35 504
FEB. 27 MUD E PN 14 58 3.0 505
FEB. 27 HRT EI PG 14 59 15.1 35 506
FEB. 27 MUD EI PN 14 59 19.2 30 507
FEB. 27 IZI EI PN 14 59 20.3 45 508
FEB. 27 HRT EI SG 14 59 24.3 509
FEB. 27 MUD EI SG 14 59 31.2 510
FEB. 27 IZM EI PG 15 25 20.7 30 511
FEB. 27 IZM EI SG 15 25 28.7 512
FEB. 27 ISK EI PG 16 2 41.3 15 513
FEB. 27 ISK EI SG 16 2 43.8 514
FEB. 27 GAZ EI PG 18 28 34.5 35 515
FEB. 27 GAZ EI SG 18 28 39.3 516
FEB. 27 EZN I PG 19 06 39.7 30 517
FEB. 27 MFT EI PN 19 06 47.5 35 518
FEB. 27 EZN I SG 19 06 48.7 519
FEB. 27 EDC EI PN 19 6 53.6 40 520
FEB. 27 BNT E PN 19 6 54.0 45 521
FEB. 27 YER I PN 19 10 55.5 170 522
FEB. 27 ELL I PN 19 11 06.0 270 523
FEB. 27 IZM EI PN 19 11 8.5 230 524
FEB. 27 KHL I PN 19 11 16.8 200 525
FEB. 27 BCK E PN 19 11 17.8 210 526
FEB. 27 YER EI SG 19 11 20.0 527
FEB. 27 DST EI PN 19 11 28.0 528
FEB. 27 EZN I PN 19 11 28.2 529
FEB. 27 EDC I PN 19 11 36.1 530
FEB. 27 BNT I PN 19 11 36.4 531
FEB. 27 IZI EI PN 19 11 40.5 210 532
FEB. 27 MFT EI PN 19 11 41.5 150 533
FEB. 27 LFK EI PN 19 11 42.2 220 534
FEB. 27 IKL EI PN 19 11 44.0 160 535
FEB. 27 HRT EI PN 19 11 47.5 205 536
FEB. 27 MUD EI PN 19 11 51.0 537
FEB. 27 GAZ EI PN 19 12 23.5B 538
FEB. 27 EZN I PG 20 59 48.3 35 539
FEB. 27 EZN I SG 20 59 56.8 540
FEB. 27 MFT EI PN 20 59 58.5 35 541
FEB. 27 EDC EI PN 21 0 2.1 40 542
FEB. 27 BNT EI PN 21 00 03.0 40 543
FEB. 27 EZN E PG 21 06 21.4 25 544
FEB. 27 MFT EI PN 21 06 27.4 25 545
FEB. 27 EZN E SG 21 06 28.4 546
FEB. 27 IZM EI PG 21 51 7.9 85 547
FEB. 27 EZN EI PG 21 51 16.4 50 548
FEB. 27 DST EI PN 21 51 27.4 60 549
FEB. 27 EDC EI PN 21 51 28.1 60 550
FEB. 27 BNT EI PN 21 51 28.4 60 551
FEB. 27 EZN EI SG 21 51 30.4 552
FEB. 27 MFT EI PN 21 51 31.0 55 553
FEB. 27 IZI E PN 21 51 41.0 75 554
FEB. 27 CTT E PN 21 51 41.4 40 555
FEB. 27 EZN I PG 22 29 50.4 80 556
FEB. 27 MFT EI PN 22 29 59.4 65 557
FEB. 27 EZN I SG 22 29 59.4 558
FEB. 27 BNT I PN 22 30 03.4 60 559
FEB. 27 EDC EI PN 22 30 3.6 65 560
FEB. 27 CTT E PN 22 30 13.0 40 561
FEB. 27 DST E PN 22 30 13.4 90 562
FEB. 27 IZM EI PN 22 30 15.4 75 563
FEB. 27 IZI E PN 22 30 21.0 90 564
FEB. 27 YER EI PN 23 50 52.3 100 565
FEB. 27 ELL E PN 23 51 6.0 566
FEB. 27 IZM EI PN 23 51 7.8 120 567
FEB. 27 KHL E PN 23 51 15.0 568
FEB. 27 BCK EI P 23 51 18.0 569
FEB. 27 ELL I PG 23 58 22.0 160 570
FEB. 27 YER EI PG 23 58 30.3 170 571
FEB. 27 ELL I SG 23 58 31.0 572
FEB. 27 BCK I PN 23 58 36.0 120 573
FEB. 27 KHL I PN 23 58 41.5 100 574
FEB. 27 YER EI SG 23 58 44.3 575
FEB. 27 IZM EI PN 23 58 51.3 120 576
FEB. 27 IZI E PN 23 59 10.0 577
FEB. 28 IZM EI PG 00 03 48.2 80 578
FEB. 28 IZM EI SG 00 03 55.2 579
FEB. 28 YER EI PG 0 3 58.7 35 580
FEB. 28 KHL EI PN 0 4 10.5 35 581
FEB. 28 DST EI PN 0 4 12.2 70 582
FEB. 28 YER EI SG 0 4 12.7 583
FEB. 28 EDC E PN 0 4 19.0 584
FEB. 28 IZI EI PN 0 4 26.7 75 585
FEB. 28 IZM EI PG 00 30 35.2 40 586
FEB. 28 IZM EI SG 00 30 45.2 587
FEB. 28 EZN I PG 00 47 42.0 80 588
FEB. 28 EZN I SG 00 47 50.5 589
FEB. 28 MFT EI PN 00 47 51.2 60 590
FEB. 28 BNT I PN 00 47 56.1 60 591
FEB. 28 EDC EI PN 0 47 56.1 65 592
FEB. 28 CTT E PN 00 48 6.0 45 593
FEB. 28 DST EI PN 00 48 7.2 85 594
FEB. 28 IZM EI PN 00 48 8.2 70 595
FEB. 28 IZI E PN 0 48 14.0 90 596
FEB. 28 MFT EI PG 1 30 7.1 65 597
FEB. 28 EZN I PG 1 30 12.0 40 598
FEB. 28 EDC EI PN 1 30 15.1 60 599
FEB. 28 BNT EI PN 1 30 15.5 70 600
FEB. 28 MFT EI SG 1 30 24.6 601
FEB. 28 IZI E PN 1 30 32.0 90 602
FEB. 28 BNT EI SG 1 30 39.0 603
FEB. 28 EZN I PG 02 06 03.6 50 604
FEB. 28 MFT EI PG 02 06 11.1 50 605
FEB. 28 EZN I SG 02 06 12.6 606
FEB. 28 BNT EI PN 02 06 17.1 55 607
FEB. 28 EDC EI PN 2 6 17.6 55 608
FEB. 28 CTT EI PN 02 06 25.0 55 609
FEB. 28 MFT EI SG 02 06 26.6 610
FEB. 28 DST EI PN 02 06 28.2 70 611
FEB. 28 IZM E PN 02 06 29.1 612
FEB. 28 IZI E PN 2 6 35.0 70 613
FEB. 28 EZN I PG 03 14 28.1 170 614
FEB. 28 MFT EI PN 03 14 36.2 145 615
FEB. 28 EZN EI SG 03 14 37.1 616
FEB. 28 EDC I PN 3 14 42.1 130 617
FEB. 28 BNT I PN 03 14 43.0 130 618
FEB. 28 CTT I PN 03 14 49.0 100 619
FEB. 28 DST EI PN 03 14 53.4 130 620
FEB. 28 IZM EI PN 03 14 53.5 140 621
FEB. 28 ISK EI PN 3 14 55.6 110 622
FEB. 28 IZI EI PN 3 14 59.0 150 623
FEB. 28 HRT EI PN 3 15 01.6 170 624
FEB. 28 KHL EI PN 3 15 11.2 100 625
FEB. 28 MUD EI PN 3 15 18.0 626
FEB. 28 EZN I PG 03 19 59.1 30 627
FEB. 28 MFT E PN 03 20 8.0 34 628
FEB. 28 EZN I SG 03 20 08.1 629
FEB. 28 EDC E PN 03 20 14.0 630
FEB. 28 BNT E PN 03 20 15.0 35 631
FEB. 28 EZN I PG 03 23 34.6 35 632
FEB. 28 EZN I SG 03 23 43.6 633
FEB. 28 MFT EI PN 03 23 44.0 40 634
FEB. 28 BNT E PN 03 23 49.0 45 635
FEB. 28 EDC EI PN 3 23 49.1 35 636
FEB. 28 EZN EI PG 03 37 10.6 20 637
FEB. 28 EZN EI SG 03 37 19.6 638
FEB. 28 EZN I PG 03 54 09.6 30 639
FEB. 28 MFT EI PN 03 54 18.2 35 640
FEB. 28 EZN I SG 03 54 18.6 641
FEB. 28 EDC E PN 3 54 24.0 642
FEB. 28 BNT E PN 03 54 25.0 643
FEB. 28 EZN I PG 03 55 33.5 35 644
FEB. 28 EZN I SG 03 55 42.6 645
FEB. 28 MFT EI PN 03 55 43.5 35 646
FEB. 28 EDC EI PN 3 55 48.1 40 647
FEB. 28 BNT E PN 03 55 49.0 45 648
FEB. 28 EZN I PG 04 02 56.7 45 649
FEB. 28 MFT EI PN 04 03 5.0 40 650
FEB. 28 EZN I SG 04 03 05.7 651
FEB. 28 BNT EI PN 04 03 10.0 55 652
FEB. 28 EDC EI PN 4 3 10.6 40 653
FEB. 28 DST E PN 04 03 20.0 60 654
FEB. 28 KHL EI PG 4 25 15.2 25 655
FEB. 28 KHL EI SG 4 25 23.2 656
FEB. 28 LFK EI PN 4 58 15.0 30 657
FEB. 28 LFK EI SG 4 58 25.0 658
FEB. 28 EZN I PG 07 05 20.9 170 659
FEB. 28 EZN I SG 07 05 29.9 660
FEB. 28 EDC I PN 7 5 35.6 140 661
FEB. 28 BNT I PN 07 05 36.8 130 662
FEB. 28 CTT EI PN 07 05 42.8 100 663
FEB. 28 IZM EI PN 07 5 46.5 160 664
FEB. 28 DST EI PN 07 05 46.8 150 665
FEB. 28 ISK EI PN 7 5 49.8 110 666
FEB. 28 IZI I PN 7 5 52.8 170 667
FEB. 28 HRT EI PN 07 05 55.0 185 668
FEB. 28 KHL I PN 7 6 3.9 110 669
FEB. 28 MUD EI PN 7 6 11.3 670
FEB. 28 IZM EI PG 08 57 14.3 35 671
FEB. 28 EZN E PN 8 57 20.0 672
FEB. 28 BNT E PN 8 57 22.0 673
FEB. 28 EDC EI PN 8 57 22.1 674
FEB. 28 IZM EI SG 08 57 26.8 675
FEB. 28 EZN I PG 09 10 22.0 35 676
FEB. 28 EZN I SG 09 10 41.0 677
FEB. 28 EDC EI PN 09 10 45.0 35 678
FEB. 28 BNT E PN 09 10 48.0 679
FEB. 28 IZM EI PG 09 22 33.6 40 680
FEB. 28 DST E PN 09 22 38.5 681
FEB. 28 EZN E PN 09 22 43.0 682
FEB. 28 EDC E PN 09 22 43.0 683
FEB. 28 IZM E SG 09 22 45.0 684
FEB. 28 EZN I PG 09 33 08.0 45 685
FEB. 28 MFT EI PN 09 33 16.7 55 686
FEB. 28 EZN I SG 09 33 17.0 687
FEB. 28 BNT EI PN 09 33 22.6 55 688
FEB. 28 EDC EI PN 9 33 22.6 55 689
FEB. 28 CTT EI PN 09 33 32.0 40 690
FEB. 28 IZM E PN 09 33 35.0 691
FEB. 28 IZI E PN 9 33 41.0 692
FEB. 28 GAZ EI PG 09 49 22.2 35 693
FEB. 28 GAZ EI SG 09 49 24.2 694
FEB. 28 EZN I PG 10 33 01.0 30 695
FEB. 28 MFT EI PN 10 33 9.7 30 696
FEB. 28 EZN I SG 10 33 10.0 697
FEB. 28 EDC EI PN 10 33 15.1 30 698
FEB. 28 BNT E PN 10 33 15.6 35 699
FEB. 28 IZM EI PG 12 01 39.2 25 700
FEB. 28 IZM EI SG 12 01 49.7 701
FEB. 28 IZI I PG 13 43 26.4 40 702
FEB. 28 IZI EI SG 13 43 32.0 703
FEB. 28 HRT EI PN 13 43 34.5 30 704
FEB. 28 BNT EI PN 13 43 40.0 30 705
FEB. 28 EDC EI PN 13 43 40.1 30 706
FEB. 28 IZI EI PG 14 14 9.6 35 707
FEB. 28 IZI EI SG 14 14 20.6 708
FEB. 28 HRT EI PG 14 38 55.9 20 709
FEB. 28 HRT EI SG 14 39 01.6 710
FEB. 28 HRT EI PG 14 58 03.5 25 711
FEB. 28 HRT EI SG 14 58 08.0 712
FEB. 28 IZM EI PG 15 55 7.6 30 713
FEB. 28 EZN EI PN 15 55 23.3 714
FEB. 28 IZM EI SG 15 55 32.6 715
FEB. 28 EZN I PG 16 47 19.3 30 716
FEB. 28 EZN I SG 16 47 28.3 717
FEB. 28 MUD EI PN 17 10 55.6 40 718
FEB. 28 IZM EI PG 18 09 6.5 28 719
FEB. 28 IZM EI SG 18 09 17.5 720
FEB. 28 EZN I PG 18 40 30.5 50 721
FEB. 28 EZN EI SG 18 40 33.5 722
FEB. 28 EDC EI PN 18 40 49.6 45 723
FEB. 28 BNT I PN 18 40 51.5 40 724
FEB. 28 IZM EI PN 18 40 53.5 40 725
FEB. 28 DST EI PN 18 40 56.5 45 726
FEB. 28 EZN I PG 20 45 12.1 45 727
FEB. 28 EZN I SG 20 45 20.6 728
FEB. 28 EDC EI PN 20 45 26.1 40 729
FEB. 28 BNT EI PN 20 45 27.0 45 730
FEB. 28 CTT E PN 20 45 39.0 731
FEB. 28 LFK EI PN 20 52 25.0 120 732
FEB. 28 LFK EI SG 20 52 47.0 733
FEB. 28 YER E PN 20 52 53.0B 70 734
FEB. 28 KHL E PN 20 52 55.0 735
FEB. 28 IZM EI PN 20 53 11.5 40 736
FEB. 28 GAZ EI PG 21 43 28.9 40 737
FEB. 28 GAZ EI SG 21 43 42.0 738
FEB. 28 ISK EI PG 23 27 50.6 25 739
FEB. 28 HRT EI PG 23 27 53.4 25 740
FEB. 28 IZI I PG 23 27 54.3 741
FEB. 28 ISK EI SG 23 27 55.6 742
FEB. 28 CTT E PG 23 27 56.0 25 743
FEB. 28 IZI EI SG 23 28 1.5 744
FEB. 28 BNT I PG 23 28 01.5 745
FEB. 28 EDC EI PG 23 28 1.6 30 746
FEB. 28 HRT EI SG 23 28 01.7 747
FEB. 28 DST EI PN 23 28 6.0 40 748
FEB. 28 BNT EI SG 23 28 14.5 749
FEB. 28 EDC EI SG 23 28 15.1 750