Contributed Data Report

      Data Report

      Bulletin / September 2001
      Contributed by THE

      
      
      This is a multi-part message in MIME format.
      
      ------=_NextPart_000_004A_01C2C12A.CF246010
      Content-Type: multipart/alternative;
      	boundary="----=_NextPart_001_004B_01C2C12A.CF246010"
      
      
      ------=_NextPart_001_004B_01C2C12A.CF246010
      Content-Type: text/plain;
      	charset="iso-8859-1"
      Content-Transfer-Encoding: quoted-printable
      
      Dear colleagues,=20
      
      this is our final bulletin of September 2001.=20
      Please acknowledge safe reading of the attached file.
      
      Regards
      Manolis
      
      ----------------------------------------------
      Dr. Manolis Scordilis
      Central Seismological Station
      Laboratory of Geophysics
      Aristotle University
      GR-54124 Thessaloniki
      GREECE
      ----------------------------------------------
      Tel.   +30 2310 991411
      Tel.   +30 2310 215551
      Fax.  +30 2310 991403
      E-mail: manolis@geo.auth.gr
      ------=_NextPart_001_004B_01C2C12A.CF246010
      Content-Type: text/html;
      	charset="iso-8859-1"
      Content-Transfer-Encoding: quoted-printable
      
      
      
      
      
      
      
      
      
      Dear colleagues,=20
       
      this is our final bulletin = of September 2001.=20
      Please acknowledge safe reading of the attached = file.
       
      Regards
      Manolis
       
      ----------------------------------------------
      Dr. Manolis=20 Scordilis
      Central Seismological Station
      Laboratory of=20 Geophysics
      Aristotle University
      GR-54124=20 Thessaloniki
      GREECE
      ----------------------------------------------<= BR>Tel.  =20 +30 2310 991411
      Tel.   +30 2310 215551
      Fax.  +30 = 2310=20 991403
      E-mail: manolis@geo.auth.gr
      <= /DIV> ------=_NextPart_001_004B_01C2C12A.CF246010-- ------=_NextPart_000_004A_01C2C12A.CF246010 Content-Type: application/octet-stream; name="sep01_sn.bul" Content-Transfer-Encoding: 7bit Content-Disposition: attachment; filename="sep01_sn.bul" Geophysical Laboratory, Aristotle University of Thessaloniki GR-54006, THESSALONIKI, GREECE ******************************* * SEISMOLOGICAL BULLETIN * * * * FOR THE TIME PERIOD * * * * Sep 01, 2001 - Sep 30, 2001 * ******************************* E-mail address: manolis@geo.auth.gr thenet@lemnos.geo.auth.gr ********************************************************************** 1. 1 SEP 1 2:32: 6.60 40.006N 24.753E 5Km ML=2.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 2:32:11.66 29. ESg 2:32:15.42 OUR Z EPg 2:32:19.14 75. ESg 2:32:27.98 PAIG Z EPg 2:32:22.06 92. ESg 2:32:34.50 AOS Z EPg 2:32:25.70 119. 3.7 0.3 21. ESg 2:32:41.82 ALN Z IPb 2:32:30.14 148. ESb 2:32:49.78 KNT Z EPb 2:32:38.62 203. 2.1 - 28. ESb 2:33: 3.46 SRS Z EP 2:32:30.60 2.3 - 27. ********************************************************************** 2. 1 SEP 1 5: 8:36.41 38.996N 24.169E 20Km ML=2.7 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 5: 8:40.78 32. ESg 5: 8:45.66 XOR Z EPg 5: 8:51.69 94. ESg 5: 9: 3.74 PAIG Z IPg 5: 8:54.17 112. 11.1 0.6 62. ESg 5: 9: 7.86 LOS Z EPb 5: 8:56.78 130. ESb 5: 9:12.58 OUR Z IPb 5: 8:59.22 149. ESb 5: 9:16.82 AGG Z EPb 5: 9: 0.62 159. 9.0 0.6 40. ESb 5: 9:19.94 THE Z EPb 5: 9: 7.50 209. LIT Z EP 5: 9: 4.10 200. 2.9 0.5 37. ********************************************************************** 3. 1 SEP 1 5:11:54.78 39.037N 24.135E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 5:11:58.74 27. ESg 5:12: 3.38 XOR Z EPg 5:12: 9.82 89. ESg 5:12:21.02 PAIG Z EPg 5:12:12.30 106. 2.8 - ESg 5:12:25.82 LOS Z EPg 5:12:15.98 129. ESg 5:12:31.94 OUR Z EPb 5:12:17.30 145. ********************************************************************** 4. 1 SEP 1 5:12:24.52 39.175N 24.055E 15Km ML=2.5 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 5:12:25.62 15. ESg 5:12:30.26 XOR Z EPg 5:12:37.22 77. ESg 5:12:47.74 PAIG Z EPg 5:12:39.02 90. 8.5 - 33. ESg 5:12:50.54 LOS Z IPg 5:12:44.10 122. ESg 5:12:58.66 OUR Z EPg 5:12:44.10 129. ESg 5:13: 0.54 ********************************************************************** 5. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. KNT Z EP 7:24:21.10 8.0 0.2 6. ********************************************************************** 6. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 11:21:54.00 4.3 0.1 19. LKD Z EP 11:21:58.50 5.0 0.2 23. LIT Z EP 11:22: 2.60 2.0 0.0 19. ********************************************************************** 7. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 11:35:16.40 ********************************************************************** 8. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 11:53:49.60 ********************************************************************** 9. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 12:28:26.10 KNT Z EP 12:28:26.10 ********************************************************************** 10. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 13:10:48.70 4.2 0.1 14. ********************************************************************** 11. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 14:14:52.40 11.5 0.0 30. LKD Z EP 14:15: 0.50 4.5 0.0 36. ********************************************************************** 12. 1 SEP 1 15:20: 2.66 39.541N 23.893E 10Km ML=2.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 15:20: 9.10 41. PAIG Z EPg 15:20:10.24 47. 13.0 - 27. ISg 15:20:16.60 XOR Z IPg 15:20:13.72 63. ESg 15:20:21.40 OUR Z EPg 15:20:17.14 88. LOS Z EPg 15:20:21.72 111. ESg 15:20:35.16 ********************************************************************** 13. 1 SEP 1 15:30:11.21 39.546N 23.912E 10Km ML=1.7 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 15:30:17.80 42. 5.6 0.2 13. ESg 15:30:23.96 PAIG Z IPg 15:30:18.89 47. 4.6 - 14. ESg 15:30:25.44 XOR Z EPg 15:30:22.36 65. ESg 15:30:30.56 OUR Z EPg 15:30:25.92 88. ESg 15:30:36.60 LOS Z EPg 15:30:29.56 109. ESg 15:30:43.92 ********************************************************************** 14. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 19:25:22.50 4.4 0.0 30. ********************************************************************** 15. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 22:43: 2.30 KNT Z EP 22:43: 7.20 AGG Z EP 22:43: 7.50 LIT Z EP 22:43: 8.30 LKD Z EP 22:43:19.20 ********************************************************************** 16. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. KNT Z EP 22:56:24.70 10.7 0.1 11. ********************************************************************** 17. 1 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 23:37:56.60 7.0 0.0 38. AGG Z EP 23:38: 6.80 ********************************************************************** 18. 2 SEP 1 0:12:17.23 39.197N 24.424E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 0:12:25.12 47. 31.0 - 31. ESg 0:12:31.92 LOS Z EPg 0:12:34.00 100. ESg 0:12:46.96 PAIG Z IPg 0:12:34.92 103. 7.9 - 26. ESg 0:12:48.12 XOR Z EPg 0:12:35.16 108. ESg 0:12:48.32 OUR Z EPb 0:12:38.32 132. ESb 0:12:56.00 ********************************************************************** 19. 2 SEP 1 0:53:38.73 38.533N 24.143E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 0:53:49.28 64. 16.2 0.2 27. ESg 0:53:57.52 XOR Z EPg 0:53:58.12 116. ESg 0:54:12.64 PAIG Z EPb 0:54: 3.12 149. ESb 0:54:22.36 LOS Z EPb 0:54: 5.52 166. ********************************************************************** 20. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 1:31:20.50 5.4 0.0 17. ********************************************************************** 21. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 2:18:22.40 9.8 0.0 12. ********************************************************************** 22. 2 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 2:36:33.32 LOS Z EP 2:36:35.32 AOS Z EP 2:36:38.56 OUR Z EP 2:36:41.64 PAIG Z IP 2:36:42.08 XOR Z EP 2:36:42.16 SRS Z EP 2:36:44.24 AGG Z EP 2:36:45.16 LIT Z EP 2:36:45.96 THE Z EP 2:36:46.44 KNT Z IP 2:36:47.60 GRG Z EP 2:36:49.12 LKD Z EP 2:36:53.56 IGT Z IP 2:36:56.16 ********************************************************************** 23. 2 SEP 1 6:59:23.96 38.070N 20.264E 5Km ML=4.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EPg 6:59:36.64 78. IGT Z IPb 6:59:49.85 162. AGG Z EPb 6:59:57.40 209. - - 235. ESb 7: 0:22.28 XOR Z IPn 7: 0: 7.06 292. - - 320. ESn 7: 0:39.60 LIT Z EPn 7: 0: 8.12 296. - - 195. ISn 7: 0:41.36 AOS Z EPn 7: 0:11.93 338. 13.3 0.4 148. ESn 7: 0:49.76 PAIG Z IPn 7: 0:14.50 360. 15.5 - 150. ESn 7: 0:54.52 THE Z EPn 7: 0:16.17 367. 4.7 - 99. GRG Z EPn 7: 0:16.32 369. ESn 7: 0:56.00 SOH Z EPn 7: 0:21.48 405. OUR Z EPn 7: 0:21.04 408. KNT Z EPn 7: 0:21.28 411. 11.9 0.3 187. ESn 7: 1: 5.28 SRS Z IPn 7: 0:25.50 443. 10.0 0.6 157. LOS Z IPn 7: 0:27.66 466. ALN Z EPn 7: 0:42.80 588. ********************************************************************** 24. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 7:57:57.60 6.2 0.0 26. ********************************************************************** 25. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 8: 0:10.00 10.6 0.0 35. ********************************************************************** 26. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 8:14:13.40 ********************************************************************** 27. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 10:10:32.60 0.0 0.0 71. AGG Z EP 10:10:54.00 2.4 0.5 50. ********************************************************************** 28. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 10:26:51.70 PAIG Z EP 10:26:52.30 SRS Z EP 10:26:52.50 KNT Z EP 10:26:53.60 LIT Z EP 10:26:51.60 ********************************************************************** 29. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 10:35:58.10 4.5 0.1 12. ********************************************************************** 30. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 13: 8:18.30 4.3 0.0 49. LIT Z EP 13: 8:25.60 AGG Z EP 13: 8:31.50 ********************************************************************** 31. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 15:53:28.50 ********************************************************************** 32. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 16:15:38.00 10.3 0.0 43. ********************************************************************** 33. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 19:28:47.10 SRS Z EP 19:29:12.40 ********************************************************************** 34. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 21: 1:24.50 0.0 0.0 77. AGG Z EP 21: 1:47.80 ********************************************************************** 35. 2 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 23:53: 0.50 ********************************************************************** 36. 3 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. KNT Z EP 0:27:58.50 3.0 0.0 10. ********************************************************************** 37. 3 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 1:55: 8.00 0.0 0.0 75. ********************************************************************** 38. 3 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 2:41:53.80 LKD Z EP 2:41:56.00 3.0 0.0 66. ********************************************************************** 39. 3 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 3:11:46.80 4.0 0.1 20. ********************************************************************** 40. 3 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 8:21:23.70 23.0 0.1 18. ********************************************************************** 41. 3 SEP 1 8:34:27.68 39.062N 24.335E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 8:34:33.90 41. ESg 8:34:39.58 XOR Z EPg 8:34:46.02 104. ESg 8:34:58.42 PAIG Z EPg 8:34:45.94 111. 2.0 - 19. ESg 8:35: 1.10 OUR Z EPb 8:34:51.38 144. ********************************************************************** 42. 3 SEP 1 8:41:48.83 37.292N 21.362E 10Km ML=3.1 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EPb 8:42:14.68 169. AGG Z EPb 8:42:21.48 210. 3.2 0.5 66. ISb 8:42:45.28 IGT Z EPn 8:42:28.08 264. ESn 8:42:56.88 XOR Z EPn 8:42:29.44 280. AOS Z IPn 8:42:31.68 303. ********************************************************************** 43. 3 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 8:45: 1.20 3.8 0.2 46. ********************************************************************** 44. 3 SEP 1 10: 4:16.62 40.673N 23.095E 10Km ML=1.8 ---------------------------------------------------------------------- C/D Dis. A T Dur. THE Z EPg 10: 4:18.76 12. 42.0 - 8. ESg 10: 4:20.56 2.8 - SOH Z EPg 10: 4:21.20 27. ESg 10: 4:25.32 KNT Z EPg 10: 4:25.96 57. 12.5 - 16. ESg 10: 4:32.72 SRS Z EPg 10: 4:29.12 65. 3.6 - 10. ESg 10: 4:36.24 PAIG Z IPg 10: 4:32.72 97. ISg 10: 4:44.68 ********************************************************************** 45. 3 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 13:34:23.90 24.0 0.1 25. AGG Z EP 13:34:34.20 PAIG Z EP 13:34:35.50 3.9 - 28. ********************************************************************** 46. 3 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 15:11:50.40 18.0 0.1 21. PAIG Z EP 15:12: 3.00 4.9 0.1 18. ********************************************************************** 47. 3 SEP 1 15:35:46.64 39.057N 24.251E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 15:35:52.92 34. ISg 15:35:57.42 XOR Z EPg 15:36: 2.44 98. ISg 15:36:14.82 PAIG Z EPg 15:36: 5.04 108. 2.4 - ESg 15:36:18.36 LOS Z EPg 15:36: 6.60 121. ESg 15:36:23.72 ********************************************************************** 48. 3 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 21:30:25.10 ALN Z EP 21:30:25.70 LIT Z EP 21:30:27.90 SRS Z EP 21:30:29.30 KNT Z EP 21:30:30.40 ********************************************************************** 49. 3 SEP 1 23:44:37.39 39.138N 24.144E 16Km ML=2.3 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 23:44:41.52 23. ISg 23:44:45.61 XOR Z EPg 23:44:51.52 86. ESg 23:45: 2.40 PAIG Z IPg 23:44:53.10 96. 7.1 0.3 21. ESg 23:45: 4.80 LOS Z EPg 23:44:56.64 120. ESg 23:45:10.52 OUR Z IPb 23:44:58.02 134. ISb 23:45:14.74 ********************************************************************** 50. 4 SEP 1 1: 2:47.91 39.054N 24.155E 15Km ML=3.1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 1: 2:51.92 27. - - 78. ESg 1: 2:56.76 XOR Z EPg 1: 3: 2.45 90. ESg 1: 3:13.68 PAIG Z IPg 1: 3: 5.21 105. - - 83. ISg 1: 3:16.88 LOS Z IPg 1: 3: 7.34 126. ESg 1: 3:23.08 OUR Z IPb 1: 3:10.13 143. ESb 1: 3:28.16 AGG Z EPb 1: 3:12.16 158. 21.0 - 95. ESb 1: 3:30.12 LIT Z IPb 1: 3:15.32 184. 4.5 0.3 61. ESb 1: 3:37.04 THE Z IPb 1: 3:18.13 203. 2.8 - 43. ISb 1: 3:41.69 SOH Z IPb 1: 3:18.16 208. SRS Z EPn 1: 3:21.20 234. 3.5 0.7 77. KNT Z EPn 1: 3:25.12 257. 3.8 0.6 81. ISn 1: 3:54.04 GRG Z EPn 1: 3:25.32 259. ESn 1: 3:53.92 ALN Z EPn 1: 3:25.24 261. ISn 1: 3:54.88 261. LKD Z EPn 1: 3:31.80 306. 3.6 0.8 74. ********************************************************************** 51. 4 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 1:58:30.20 10.0 0.0 55. AGG Z EP 1:58:42.60 ********************************************************************** 52. 4 SEP 1 2:56:50.34 38.643N 24.138E 5Km ML=2.9 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 2:57: 0.66 63. - - 49. ESg 2:57: 8.26 XOR Z EPg 2:57:10.14 115. ISg 2:57:23.06 AGG Z EPb 2:57:15.50 162. 10.0 0.5 52. ESb 2:57:35.50 LOS Z EPb 2:57:16.26 165. ESb 2:57:36.70 OUR Z EPb 2:57:18.82 188. ESb 2:57:42.10 LIT Z EPb 2:57:23.74 215. 3.8 - 44. ESb 2:57:49.46 THE Z EPn 2:57:25.74 243. ALN Z EPn 2:57:34.34 299. KNT Z IPn 2:57:33.54 299. 2.0 0.8 50. ESn 2:58: 7.74 ********************************************************************** 53. 4 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 8:12:21.70 ********************************************************************** 54. 4 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 14:38: 3.70 15.1 0.2 16. ********************************************************************** 55. 4 SEP 1 19:12:47.74 38.498N 23.680E 5Km ML=2.7 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 19:13: 0.42 77. 17.6 0.2 26. ESg 19:13:10.26 XOR Z EPg 19:13: 5.18 105. ESg 19:13:18.62 AGG Z EPb 19:13: 9.14 131. 4.8 0.2 28. ISb 19:13:25.94 LOS Z EPb 19:13:19.42 200. ESb 19:13:43.66 LIT Z EPb 19:13:19.66 205. 2.0 - OUR Z EPb 19:13:18.54 205. ********************************************************************** 56. 4 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 22:44:27.80 20.7 0.2 20. ********************************************************************** 57. 4 SEP 1 23: 2:52.58 39.098N 24.161E 5Km ML=2.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 23: 2:56.74 26. 34.0 0.1 27. ISg 23: 3: 1.22 XOR Z EPg 23: 3: 7.58 89. ISg 23: 3:18.26 PAIG Z EPg 23: 3: 8.46 101. 3.4 - 22. ESg 23: 3:22.62 LOS Z EPg 23: 3:12.58 122. ISg 23: 3:28.78 OUR Z IPb 23: 3:14.97 138. AGG Z EPb 23: 3:18.06 159. 2.3 - ESb 23: 3:37.82 ********************************************************************** 58. 4 SEP 1 23:30:55.09 38.691N 23.303E 8Km ML=3.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 23:31: 7.42 73. - - 52. ESg 23:31:16.40 XOR Z IPg 23:31: 7.60 76. ESg 23:31:17.28 AGG Z EPg 23:31:10.04 92. - - 73. ESg 23:31:21.16 PAIG Z EPb 23:31:17.78 141. - - 67. ESb 23:31:34.84 LIT Z EPb 23:31:21.60 171. 13.2 0.4 53. ISb 23:31:42.56 OUR Z IPb 23:31:24.46 192. LOS Z EPb 23:31:26.48 206. ESb 23:31:52.08 THE Z EPb 23:31:27.48 217. 2.6 - LKD Z IPn 23:31:30.04 231. 4.2 0.6 64. SOH Z EPn 23:31:31.28 237. GRG Z EPn 23:31:34.12 263. SRS Z EPn 23:31:35.24 270. 3.0 0.7 34. IGT Z EPn 23:31:35.84 273. KNT Z EPn 23:31:35.52 276. 4.6 0.6 57. ALN Z EPn 23:31:43.00 339. ********************************************************************** 59. 4 SEP 1 23:52:50.41 39.043N 24.325E 5Km ML=2.1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 23:52:56.84 41. 7.8 0.2 15. ESg 23:53: 3.16 XOR Z EPg 23:53: 8.08 104. ESg 23:53:20.40 PAIG Z EPg 23:53: 8.76 113. 2.3 - 17. ESg 23:53:23.40 LOS Z EPg 23:53: 9.84 118. ISg 23:53:25.08 OUR Z EPb 23:53:13.24 146. ********************************************************************** 60. 5 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 2:53:46.20 9.5 0.0 47. AGG Z EP 2:53:52.30 ********************************************************************** 61. 5 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 3: 2:28.60 14.1 0.0 63. AGG Z EP 3: 2:34.70 4.1 0.3 40. ********************************************************************** 62. 5 SEP 1 3:25:50.02 38.949N 21.353E 10Km ML=2.5 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EPg 3:25:58.38 51. - - 45. ESg 3:26: 5.90 IGT Z EPg 3:26: 5.86 96. ESg 3:26:19.18 AGG Z EPg 3:26: 7.26 102. 9.6 0.3 27. ISg 3:26:20.42 LIT Z EPb 3:26:17.58 172. 3.1 0.4 28. ESb 3:26:39.54 XOR Z EPb 3:26:19.34 182. ********************************************************************** 63. 5 SEP 1 3:34:55.26 37.328N 21.449E 10Km ML=2.8 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EPb 3:35:22.06 168. - - 80. ESb 3:35:43.38 AGG Z EPb 3:35:28.02 203. 6.2 0.3 48. ESb 3:35:52.38 IGT Z IPn 3:35:35.78 263. ESn 3:36: 6.42 XOR Z IPn 3:35:36.06 273. AOS Z EPn 3:35:39.14 295. PAIG Z EPn 3:35:45.50 348. ********************************************************************** 64. 5 SEP 1 5:43:28.42 40.547N 23.511E 10Km ML=1.9 ---------------------------------------------------------------------- C/D Dis. A T Dur. SOH Z EPg 5:43:34.02 33. ESg 5:43:38.14 OUR Z EPg 5:43:36.54 46. ESg 5:43:41.54 SRS Z EPg 5:43:38.70 64. 3.8 0.2 17. ESg 5:43:47.74 PAIG Z IPg 5:43:39.98 70. 2.1 - KNT Z EPg 5:43:43.18 86. 7.4 0.2 14. ESg 5:43:53.10 ********************************************************************** 65. 5 SEP 1 7: 9:44.96 37.203N 21.424E 20Km ML=3.4 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z IPb 7:10:10.40 180. ESb 7:10:30.40 AGG Z EPb 7:10:16.08 217. - - 102. ESb 7:10:40.16 IGT Z EPn 7:10:23.76 276. ESn 7:10:53.04 XOR Z EPn 7:10:24.12 286. ESn 7:10:54.64 AOS Z EPn 7:10:26.64 306. LIT Z EPn 7:10:29.76 335. 5.4 - 75. PAIG Z EPn 7:10:33.00 361. 4.6 - 55. ESn 7:11:11.56 OUR Z EPn 7:10:39.68 412. LOS Z EPn 7:10:43.36 440. KNT Z EPn 7:10:44.88 457. 2.3 - 50. SRS Z EPn 7:10:46.32 473. 2.5 - 32. ********************************************************************** 66. 5 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 7:17:37.00 7.2 0.2 16. ********************************************************************** 67. 5 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 10:24:14.00 ********************************************************************** 68. 5 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 10:31:35.70 4.0 0.0 35. ********************************************************************** 69. 5 SEP 1 13:19:43.48 39.008N 24.214E 10Km ML=2.6 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 13:19:49.72 34. - - 37. ESg 13:19:54.56 XOR Z EPg 13:19:59.40 97. ESg 13:20:10.48 PAIG Z EPg 13:20: 1.44 112. 7.1 0.1 25. ESg 13:20:13.64 LOS Z IPg 13:20: 3.08 127. OUR Z EPb 13:20: 6.04 149. AGG Z EPb 13:20: 7.80 163. 2.1 0.3 27. ESb 13:20:27.56 LIT Z EPb 13:20:12.16 191. 2.1 - ********************************************************************** 70. 5 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 11:48:15.30 10.0 0.0 17. ********************************************************************** 71. 5 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 13:18:45.70 16.3 0.2 11. ********************************************************************** 72. 5 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 16:23:12.40 2.9 0.6 65. ********************************************************************** 73. 5 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 23:57: 5.90 7.6 0.0 38. ********************************************************************** 74. 6 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 4:56:39.60 2.4 0.2 41. ********************************************************************** 75. 6 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 9:19:36.90 2.7 0.0 13. ********************************************************************** 76. 6 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 9:30:34.10 10.9 0.2 17. ********************************************************************** 77. 6 SEP 1 11: 7:50.71 38.819N 25.679E 15Km ML=3.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPb 11: 8:12.89 138. ESb 11: 8:28.34 AOS Z EPb 11: 8:16.50 169. 9.1 0.3 45. ESb 11: 8:36.86 PAIG Z EPb 11: 8:23.22 219. 3.8 0.3 50. ESb 11: 8:49.54 OUR Z EPn 11: 8:24.62 228. XOR Z EPn 11: 8:26.10 232. ESn 11: 8:51.74 ALN Z EPn 11: 8:24.82 232. 4.0 0.4 36. ESn 11: 8:52.66 ********************************************************************** 78. 6 SEP 1 18:49:19.38 39.175N 24.128E 6Km ML=2.4 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 18:49:22.82 22. - - 27. ESg 18:49:26.08 XOR Z EPg 18:49:33.28 84. ESg 18:49:42.92 PAIG Z EPg 18:49:34.96 92. 8.7 - ISg 18:49:46.36 LOS Z EPg 18:49:38.64 118. ESg 18:49:52.80 OUR Z EPg 18:49:39.48 129. ESg 18:49:56.68 AGG Z EPb 18:49:44.48 156. ESb 18:50: 3.60 ********************************************************************** 79. 7 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 0:26:37.00 5.2 0.3 26. ********************************************************************** 80. 7 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 2:58:35.36 OUR Z EP 2:58:42.32 SRS Z EP 2:58:43.68 THE Z EP 2:58:44.92 SOH Z EP 2:58:45.04 KNT Z EP 2:58:45.76 LIT Z EP 2:58:45.80 GRG Z EP 2:58:47.88 LKD Z EP 2:58:51.12 IGT Z IP 2:58:53.44 ********************************************************************** 81. 7 SEP 1 3:59:55.82 39.607N 24.193E 10Km ML=2.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 4: 0: 5.21 55. 2.3 0.2 26. ISg 4: 0:12.70 PAIG Z IPg 4: 0: 5.66 57. 9.5 - 26. ESg 4: 0:12.90 OUR Z EPg 4: 0: 9.18 83. ESg 4: 0:20.30 LOS Z IPg 4: 0: 9.94 84. ESg 4: 0:20.26 XOR Z EPg 4: 0:10.82 90. ESg 4: 0:22.34 AGG Z EPb 4: 0:23.30 173. ISb 4: 0:45.26 KNT Z EPb 4: 0:28.38 205. ESb 4: 0:53.70 ALN Z EPb 4: 0:29.98 213. ESb 4: 0:55.02 ********************************************************************** 82. 7 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 6:50:21.40 0.0 0.0 103. AGG Z EP 6:50:41.30 5.7 0.3 62. LIT Z EP 6:50:53.80 2.2 0.4 55. ********************************************************************** 83. 7 SEP 1 11: 5:22.27 36.508N 22.443E 55Km ML=3.8 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z IPn 11: 6: 1.32 279. 16.0 0.3 63. ESn 11: 6:29.16 LKD Z IPn 11: 6: 2.53 291. - - 63. AOS Z IPn 11: 6: 6.76 321. 5.0 - 92. XOR Z EPn 11: 6: 6.24 324. ESn 11: 6:41.04 PAIG Z EPn 11: 6:14.60 395. 4.0 - 77. ESn 11: 6:56.00 LIT Z EPn 11: 6:15.72 399. 6.7 0.4 118. ESn 11: 6:57.48 OUR Z EPn 11: 6:21.00 445. THE Z IPn 11: 6:22.16 460. SOH Z EPn 11: 6:25.48 485. GRG Z EPn 11: 6:27.40 494. KNT Z EPn 11: 6:30.76 518. 4.1 - 101. SRS Z EPn 11: 6:29.48 521. 2.2 0.7 59. ALN Z EPn 11: 6:37.08 579. ********************************************************************** 84. 7 SEP 1 11:58: 2.81 39.068N 24.155E 5Km ML=2.3 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 11:58: 6.66 26. - - 27. ESg 11:58:11.64 XOR Z IPg 11:58:17.89 89. ISg 11:58:29.60 PAIG Z IPg 11:58:19.89 104. 4.0 0.2 21. ESg 11:58:33.00 LOS Z IPg 11:58:23.52 125. ESg 11:58:39.28 OUR Z EPb 11:58:24.72 141. ********************************************************************** 85. 7 SEP 1 12:30:16.29 39.026N 24.244E 5Km ML=2.3 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 12:30:22.02 35. - - 25. ISg 12:30:26.94 XOR Z EPg 12:30:32.78 98. ESg 12:30:44.82 PAIG Z IPg 12:30:35.05 111. 3.7 0.2 19. ESg 12:30:48.18 OUR Z EPb 12:30:39.94 147. ESb 12:30:58.46 AGG Z EPb 12:30:42.58 166. 1.5 - ESb 12:31: 4.10 ********************************************************************** 86. 7 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 12:59:13.40 2.6 0.0 16. ********************************************************************** 87. 7 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 13: 5:58.20 19.0 0.2 10. ********************************************************************** 88. 7 SEP 1 14:52:18.50 39.165N 24.184E 10Km ML=2.5 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 14:52:22.40 26. - - 41. ESg 14:52:27.04 XOR Z EPg 14:52:33.42 88. ESg 14:52:43.62 PAIG Z EPg 14:52:34.42 95. 8.2 - 31. ESg 14:52:44.84 LOS Z EPg 14:52:37.08 115. ESg 14:52:50.52 OUR Z EPb 14:52:39.46 131. ESb 14:52:54.96 AGG Z EPb 14:52:43.56 161. 2.0 - 27. ESb 14:53: 3.80 ********************************************************************** 89. 7 SEP 1 17:57:23.65 39.115N 24.149E 20Km ML=3.5 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 17:57:26.80 24. - - 150. ESg 17:57:31.76 XOR Z EPg 17:57:37.96 87. ESg 17:57:48.92 PAIG Z IPg 17:57:39.82 99. - - 140. ISg 17:57:50.56 LOS Z IPg 17:57:42.82 121. ESg 17:57:57.72 OUR Z IPb 17:57:45.05 136. ESb 17:58: 0.88 AGG Z IPb 17:57:46.69 158. - - 179. ESb 17:58: 6.76 LIT Z EPb 17:57:50.16 180. 11.7 0.3 104. ESb 17:58:10.60 THE Z IPb 17:57:52.36 197. 5.0 0.6 64. SOH Z EPb 17:57:52.84 201. SRS Z EPn 17:57:56.04 227. 9.5 0.4 106. KNT Z EPn 17:58: 0.52 251. 9.0 - 117. ESn 17:58:27.24 GRG Z EPn 17:58: 0.44 253. ESn 17:58:27.76 ALN Z EPn 17:57:59.12 256. 5.6 0.5 77. LKD Z EPn 17:58: 7.20 307. 9.6 0.4 110. IGT Z EPn 17:58: 9.92 332. ********************************************************************** 90. 7 SEP 1 18: 5:55.01 38.989N 24.176E 15Km ML=2.6 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 18: 6: 0.28 33. - - 40. ESg 18: 6: 4.84 XOR Z EPg 18: 6:10.88 95. ESg 18: 6:22.52 PAIG Z EPg 18: 6:13.37 113. 7.1 0.3 32. ESg 18: 6:25.92 LOS Z EPb 18: 6:15.64 131. ESb 18: 6:31.12 OUR Z IPb 18: 6:18.33 150. ISb 18: 6:36.10 AGG Z EPb 18: 6:19.28 160. 3.7 0.3 32. ESb 18: 6:39.12 ********************************************************************** 91. 7 SEP 1 18:10:21.44 39.059N 24.180E 10Km ML=3.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 18:10:25.76 29. - - 107. ESg 18:10:30.76 XOR Z EPg 18:10:36.84 92. ESg 18:10:47.52 PAIG Z IPg 18:10:38.94 106. - - 105. ESg 18:10:51.28 LOS Z EPg 18:10:41.16 124. ISg 18:10:55.92 OUR Z IPb 18:10:43.94 143. ESb 18:11: 1.40 AGG Z EPb 18:10:45.92 160. 21.0 0.7 104. ESb 18:11: 6.12 LIT Z EPb 18:10:49.04 186. 5.8 - 88. ISb 18:11:12.92 THE Z IPb 18:10:52.73 203. 2.0 - 41. SRS Z EPn 18:10:55.52 234. 3.6 - 80. KNT Z EPn 18:10:59.64 258. 4.2 - 86. ALN Z EPn 18:10:59.72 259. GRG Z EPn 18:10:59.36 260. ESn 18:11:29.28 LKD Z EPn 18:11: 6.72 309. 3.9 0.6 68. IGT Z EPn 18:11: 8.60 336. ********************************************************************** 92. 7 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 18:24:25.70 18.9 0.2 28. ********************************************************************** 93. 7 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 18:32:40.70 28.5 0.2 18. ********************************************************************** 94. 7 SEP 1 21: 1:48.42 39.178N 24.158E 10Km ML=2.5 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 21: 1:51.56 24. - - 52. ISg 21: 1:56.44 XOR Z IPg 21: 2: 2.50 86. ESg 21: 2:12.60 PAIG Z EPg 21: 2: 3.52 93. - - 22. ESg 21: 2:14.60 LOS Z IPg 21: 2: 6.10 116. ESg 21: 2:20.88 OUR Z IPg 21: 2: 8.53 129. ESg 21: 2:25.12 AGG Z IPb 21: 2:13.16 159. 6.4 0.5 41. ESb 21: 2:32.24 LIT Z EPb 21: 2:14.88 176. 2.3 - 37. ESb 21: 2:36.24 THE Z EPb 21: 2:17.00 191. SRS Z IPn 21: 2:20.44 221. 2.0 - 33. ALN Z EPn 21: 2:25.20 250. ********************************************************************** 95. 7 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. THE Z EP 21:58:22.90 11.1 0.1 9. ********************************************************************** 96. 7 SEP 1 22: 5: 8.30 39.000N 24.131E 10Km ML=2.4 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 22: 5:12.92 29. - - 36. ESg 22: 5:17.92 XOR Z EPg 22: 5:23.60 91. ESg 22: 5:34.92 LOS Z EPb 22: 5:29.32 132. ESb 22: 5:45.48 OUR Z EPb 22: 5:30.64 149. AGG Z EPb 22: 5:32.24 156. 3.3 - 30. ESb 22: 5:51.16 THE Z EPb 22: 5:39.28 207. KNT Z EPn 22: 5:46.52 262. ********************************************************************** 97. 7 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 23:58:14.30 11.3 0.3 36. LKD Z EP 23:58:15.40 0.0 0.0 49. LIT Z EP 23:58:30.10 ********************************************************************** 98. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 01:46:16.10 24.5 0.2 19. ********************************************************************** 99. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 2:47: 0.40 2.9 0.3 26. ********************************************************************** 100. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 3:15:22.60 0.0 0.0 26. AGG Z EP 3:15:50.80 KNT Z EP 3:15:52.10 2.3 0.0 21. ********************************************************************** 101. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 3:21: 0.50 20.0 0.2 23. AGG Z EP 3:21:21.10 ********************************************************************** 102. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 3:22:10.50 0.0 0.0 19. ********************************************************************** 103. 8 SEP 1 4:10:58.97 39.264N 22.291E 10Km ML=2.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EPg 4:11: 2.72 27. - - 27. ESg 4:11: 7.64 XOR Z EPg 4:11:12.52 79. ESg 4:11:22.72 LIT Z IPg 4:11:14.33 94. 4.0 0.3 25. ESg 4:11:27.12 LKD Z EPb 4:11:24.84 155. 2.1 - 23. ********************************************************************** 104. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 4:52:40.90 12.1 0.2 21. PAIG Z EP 4:42:53.80 3.5 0.3 16. ********************************************************************** 105. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 5: 4:58.00 4.7 0.0 38. ********************************************************************** 106. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 8:23:51.40 2.0 0.0 15. ********************************************************************** 107. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 8:33:36.10 2.6 0.0 29. ********************************************************************** 108. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 11:30:57.60 3.8 0.1 10. ********************************************************************** 109. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 12:13:12.20 17.0 0.2 19. PAIG Z EP 12:13:24.70 3.6 0.3 19. ********************************************************************** 110. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 16: 2:29.60 2.4 0.2 33. LKD Z EP 16: 2:31.70 3.6 0.0 60. ********************************************************************** 111. 8 SEP 1 16:45:30.59 38.940N 23.121E 10Km ML=2.3 ---------------------------------------------------------------------- C/D Dis. A T Dur. XOR Z EPg 16:45:38.56 48. ESg 16:45:44.32 AGG Z EPg 16:45:41.82 69. 17.0 - 30. ESg 16:45:51.48 AOS Z EPg 16:45:42.12 70. 22.5 - 25. ISg 16:45:51.42 PAIG Z EPg 16:45:50.20 120. 4.2 - 22. ESg 16:46: 5.00 LIT Z EPb 16:45:52.88 140. 3.2 - 25. ESb 16:46: 9.56 OUR Z EPb 16:45:56.96 171. KNT Z EPn 16:46: 7.56 247. ********************************************************************** 112. 8 SEP 1 17: 1:54.96 38.879N 24.180E 10Km ML=2.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 17: 2: 2.44 42. 36.0 - 23. ESg 17: 2: 6.76 XOR Z EPg 17: 2:12.48 101. ESg 17: 2:25.20 PAIG Z IPg 17: 2:15.62 124. 2.3 - 20. ISg 17: 2:30.48 LOS Z EPb 17: 2:18.40 141. ESb 17: 2:35.92 AGG Z IPb 17: 2:20.36 161. ESb 17: 2:41.92 OUR Z IPb 17: 2:20.66 162. ESb 17: 2:39.24 ********************************************************************** 113. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 18:43:21.80 4.7 0.2 17. ********************************************************************** 114. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 19:48:32.30 0.0 0.0 18. ********************************************************************** 115. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 21:33: 6.10 0.0 0.0 28. ********************************************************************** 116. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. KNT Z EP 21:41:30.30 3.5 0.0 13. ********************************************************************** 117. 8 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 23: 5: 5.60 20.5 0.0 41. AGG Z EP 23: 5:19.10 ********************************************************************** 118. 9 SEP 1 2:18:55.16 40.317N 20.586E 5Km ML=2.8 ---------------------------------------------------------------------- C/D Dis. A T Dur. IGT Z IPg 2:19: 9.34 90. ESg 2:19:22.62 LIT Z IPb 2:19:21.86 164. 11.2 0.4 47. ESb 2:19:42.86 GRG Z EPb 2:19:22.58 169. ESb 2:19:43.46 LKD Z EPb 2:19:24.94 179. 7.0 0.4 62. ESb 2:19:45.78 THE Z EPb 2:19:27.94 205. AGG Z EPb 2:19:27.46 207. 4.5 - 42. ESb 2:19:52.70 KNT Z EPb 2:19:29.14 217. 2.7 0.5 38. ISb 2:19:54.82 XOR Z EPn 2:19:33.42 247. ********************************************************************** 119. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 3:43:12.60 21.4 0.2 22. ********************************************************************** 120. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 3:55:25.70 12.5 0.2 24. ********************************************************************** 121. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 8:27:11.30 2.8 0.2 14. ********************************************************************** 122. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 8:43:13.20 2.8 0.2 10. ********************************************************************** 123. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 9:43: 5.40 4.2 0.2 14. ********************************************************************** 124. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 10:27:13.60 0.0 0.0 22. LIT Z EP 10:27:24.80 3.4 0.3 20. ********************************************************************** 125. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 11:35:31.40 36.0 0.1 8. ********************************************************************** 126. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 12: 9:53.60 26.0 0.0 17. PAIG Z EP 12:10: 6.10 2.6 0.0 13. ********************************************************************** 127. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 12:50:19.60 0.0 0.0 14. ********************************************************************** 128. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. PAIG Z EP 17: 0:52.60 11.2 0.0 19. AGG Z EP 17: 1:02.90 ********************************************************************** 129. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 18: 6: 5.60 7.1 0.3 22. AGG Z EP 18: 6:16.10 ********************************************************************** 130. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 19:44:23.80 3.1 0.0 28. ********************************************************************** 131. 9 SEP 1 21:29:22.96 39.211N 24.136E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 21:29:26.38 23. ISg 21:29:30.48 XOR Z EPg 21:29:37.16 83. ESg 21:29:47.12 LOS Z EPg 21:29:42.20 114. ESg 21:29:56.36 OUR Z EPg 21:29:43.52 125. ISg 21:30: 0.14 ********************************************************************** 132. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 22: 1:10.20 2.0 0.0 10. ********************************************************************** 133. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 22:18:29.70 3.3 0.2 13. ********************************************************************** 134. 9 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 22:21:32.60 15.0 0.0 36. ********************************************************************** 135. 10 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. OUR Z EP 1:32:59.66 ES 1:33: 3.26 PAIG Z EP 1:33: 2.18 ES 1:33: 8.14 ********************************************************************** 136. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 2:48:37.50 0.0 0.0 16. ********************************************************************** 137. 10 SEP 1 3:12:48.80 39.054N 24.123E 5Km ML=2.5 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 3:12:53.14 25. - - 45. ESg 3:12:57.06 XOR Z EPg 3:13: 2.98 88. ISg 3:13:13.90 PAIG Z EPg 3:13: 5.02 104. ESg 3:13:18.54 LOS Z EPg 3:13: 9.18 128. ESg 3:13:25.26 OUR Z IPb 3:13:11.45 143. ISb 3:13:28.90 AGG Z EPb 3:13:12.42 155. 4.4 - 36. ESb 3:13:32.58 ********************************************************************** 138. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 3:57:12.50 4.3 0.7 35. ********************************************************************** 139. 10 SEP 1 5: 8: 8.46 39.014N 23.201E 5Km ML=3.4 ---------------------------------------------------------------------- C/D Dis. A T Dur. XOR Z IPg 5: 8:15.22 39. ESg 5: 8:19.72 AOS Z EPg 5: 8:18.28 61. - - 97. ESg 5: 8:27.28 AGG Z EP 5: 8:18.56 75. - - 134. ES 5: 8:28.32 PAIG Z IPg 5: 8:26.98 109. - - 115. ESg 5: 8:39.56 LIT Z EPb 5: 8:30.09 135. - - 98. ESb 5: 8:46.24 OUR Z EPb 5: 8:33.88 161. ISb 5: 8:54.66 THE Z EPb 5: 8:35.44 181. 8.5 - 54. LOS Z EPb 5: 8:37.12 191. ESb 5: 9: 1.12 SOH Z EPb 5: 8:39.12 201. LKD Z IPn 5: 8:42.85 224. 23.0 - 124. ESn 5: 9: 9.40 GRG Z IPn 5: 8:41.88 226. ESn 5: 9: 7.36 SRS Z EPn 5: 8:43.25 236. 10.7 - 92. ISn 5: 9:10.48 KNT Z IPn 5: 8:44.14 240. 13.6 - 90. Z ESn 5: 9:11.16 240. IGT Z EPn 5: 8:45.72 254. ISn 5: 9:14.84 ALN Z EPn 5: 8:53.56 320. ********************************************************************** 140. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 5:17: 0.20 0.0 0.0 18. ********************************************************************** 141. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 5:59:10.50 0.0 0.0 27. ********************************************************************** 142. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 6:16:48.50 0.0 0.0 53. ********************************************************************** 143. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LKD Z EP 7:25: 2.90 0.0 0.0 65. AGG Z EP 7:25:16.50 ********************************************************************** 144. 10 SEP 1 7:40:11.39 38.918N 23.141E 5Km ML=2.3 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EPg 7:40:23.52 71. ESg 7:40:31.60 PAIG Z IPg 7:40:31.20 121. 2.9 - 17. ESg 7:40:47.20 LIT Z EPb 7:40:35.16 143. ********************************************************************** 145. 10 SEP 1 11:22:46.79 41.038N 24.158E 10Km ML=2.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EPg 11:22:55.16 48. 5.2 - 18. ESg 11:23: 0.72 OUR Z EPg 11:22:59.84 80. ESg 11:23:11.00 KNT Z EPg 11:23: 4.60 107. 2.7 - 20. ESg 11:23:18.20 ********************************************************************** 146. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. PAIG Z EP 8:47:32.30 0.0 0.0 12. ********************************************************************** 147. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 9:28:59.80 23.5 0.2 12. ********************************************************************** 148. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 11:19:59.00 2.6 0.0 20. ********************************************************************** 149. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 13:22:32.40 4.1 0.1 14. ********************************************************************** 150. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 13:45:54.10 7.3 0.3 10. ********************************************************************** 151. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 16:21:31.10 5.2 0.2 17. ********************************************************************** 152. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 16:37: 0.30 0.0 0.0 27. PAIG Z EP 16:37:12.50 11.0 0.0 20. AGG Z EP 16:37:20.90 ********************************************************************** 153. 10 SEP 1 17: 3: 7.78 38.967N 23.131E 5Km ML=2.7 ---------------------------------------------------------------------- C/D Dis. A T Dur. XOR Z EPg 17: 3:15.56 45. ESg 17: 3:21.40 AOS Z EPg 17: 3:19.16 69. - - 43. ISg 17: 3:27.52 AGG Z IPg 17: 3:18.84 70. - - 46. ISg 17: 3:27.96 PAIG Z EPg 17: 3:27.40 117. 12.8 - 50. ESg 17: 3:41.52 LIT Z EPb 17: 3:30.04 137. 11.0 - 39. ESb 17: 3:46.32 OUR Z EPb 17: 3:33.80 168. LKD Z EPb 17: 3:42.00 217. GRG Z EPn 17: 3:42.84 229. SRS Z EPn 17: 3:44.00 242. KNT Z EPn 17: 3:44.36 244. 3.0 - 32. ********************************************************************** 154. 10 SEP 01 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 19: 6:42.60 ********************************************************************** 155. 10 SEP 1 19:51:38.89 39.033N 24.107E 5Km ML=3.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 19:51:43.48 25. - - 84. ESg 19:51:48.52 XOR Z EPg 19:51:53.56 87. ESg 19:52: 3.32 PAIG Z EPg 19:51:56.48 106. ESg 19:52: 7.72 LOS Z EPb 19:51:58.52 131. ESb 19:52:14.84 OUR Z IPb 19:52: 1.34 145. ESb 19:52:18.16 AGG Z EPb 19:52: 2.04 154. 12.5 0.4 76. ESb 19:52:21.08 LIT Z EPb 19:52: 6.48 183. 5.8 - 56. ESb 19:52:26.72 THE Z EPb 19:52: 9.40 203. 2.2 - 27. SRS Z EPn 19:52:12.88 235. 3.5 - 67. KNT Z EPn 19:52:16.68 258. 4.6 0.6 66. ESn 19:52:45.04 ALN Z EPn 19:52:17.52 265. ********************************************************************** 156. 10 SEP 1 23:41:16.63 39.040N 24.081E 10Km ML=2.3 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 23:41:21.18 30. - - 32. ISg 23:41:26.34 XOR Z EPg 23:41:31.46 93. ISg 23:41:43.50 PAIG Z EPg 23:41:34.25 108. 4.0 - 25. ESg 23:41:45.54 LOS Z IPg 23:41:35.94 126. ESg 23:41:51.14 OUR Z EPb 23:41:38.85 145. ESb 23:41:55.66 AGG Z IPb 23:41:40.66 160. 2.4 - 31. ESb 23:42: 0.22 LIT Z EPb 23:41:44.26 187. ESb 23:42: 5.74 THE Z EPb 23:41:47.02 205. ********************************************************************** 157. 11 SEP 1 0:10: 1.83 39.014N 23.692E 15Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 0:10: 6.90 32. 30. 0.2 22. ESg 0:10:12.14 XOR Z EPg 0:10:17.30 95. ESg 0:10:29.38 PAIG Z EPg 0:10:19.90 111. ESg 0:10:31.86 LOS Z EPg 0:10:21.74 128. ESg 0:10:38.30 OUR Z EPb 0:10:24.85 148. AGG Z IPb 0:10:26.90 161. ESb 0:10:45.98 ********************************************************************** 158. 11 SEP 1 1:38:53.80 39.063N 24.069E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 1:38:57.90 28. ESg 1:39: 2.78 XOR Z EPg 1:39: 9.10 91. ESg 1:39:20.82 PAIG Z IPg 1:39:11.10 105. LOS Z EPg 1:39:14.38 125. OUR Z EPb 1:39:15.74 142. AGG Z EPb 1:39:19.02 159. ********************************************************************** 159. 11 SEP 1 2:18:14.98 39.030N 24.223E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 2:18:20.10 34. ESg 2:18:25.38 XOR Z EPg 2:18:31.66 97. ESg 2:18:43.86 PAIG Z EPg 2:18:33.22 110. LOS Z EPg 2:18:35.70 125. OUR Z EPb 2:18:38.10 146. AGG Z EPb 2:18:40.90 164. THE Z EPb 2:18:46.50 208. ********************************************************************** 160. 11 SEP 1 3: 7:12.95 39.165N 24.142E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 3: 7:14.70 14. ESg 3: 7:18.22 XOR Z EPg 3: 7:26.10 77. ESg 3: 7:36.18 PAIG Z IPg 3: 7:28.41 90. LOS Z EPg 3: 7:33.70 124. OUR Z EPg 3: 7:32.94 130. ESg 3: 7:49.34 AGG Z EPb 3: 7:36.42 149. 2. 0.1 30. ESb 3: 7:55.86 ********************************************************************** 161. 11 SEP 1 3:21: 2.73 38.954N 24.410E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 3:21: 9.86 44. ESg 3:21:14.78 XOR Z EPg 3:21:21.26 107. ESg 3:21:34.54 PAIG Z EPg 3:21:22.86 121. OUR Z IPb 3:21:27.70 156. ESb 3:21:48.70 AGG Z EPb 3:21:30.34 172. 2. 0.1 36. ESb 3:21:51.94 ********************************************************************** 162. 11 SEP 1 4:55:52.62 39.004N 24.293E 10Km ML=2.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 4:55:58.88 40. ESg 4:56: 3.92 XOR Z IPg 4:56:10.44 103. ESg 4:56:23.60 PAIG Z EPg 4:56:12.00 115. 3.5 0.2 22. OUR Z EPb 4:56:16.96 150. AGG Z IPb 4:56:19.96 170. 2. 0.1 21. ********************************************************************** 163. 11 SEP 1 5:43:33.18 39.052N 24.201E 5Km ML=2.4 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 5:43:37.74 31. ESg 5:43:42.74 XOR Z EPg 5:43:49.18 94. ESg 5:44: 1.46 PAIG Z EPg 5:43:50.90 107. 4.0 0.2 41. ESg 5:44: 4.58 LOS Z IPg 5:43:53.90 124. ESg 5:44: 9.46 OUR Z EPb 5:43:55.42 144. ISb 5:44:14.22 AGG Z EPb 5:43:59.06 162. 2.0 0.1 38. ESb 5:44:20.38 ********************************************************************** 164. 11 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. OUR Z EP 15:15:18.78 PAIG Z EP 15:15:26.30 ********************************************************************** 165. 11 SEP 1 16:20:11.16 39.056N 24.192E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 16:20:15.74 30. ESg 16:20:20.62 XOR Z EPg 16:20:27.14 93. ESg 16:20:38.30 PAIG Z EPg 16:20:28.58 106. 10. 0.1 68. ESg 16:20:42.34 LOS Z EPg 16:20:31.74 124. ESg 16:20:47.42 OUR Z EPb 16:20:33.58 143. 39. 0.2 7. AGG Z EPb 16:20:36.70 161. ESb 16:20:57.58 ********************************************************************** 166. 11 SEP 1 22: 3:57.60 39.049N 24.278E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 22: 4: 3.52 37. ISg 22: 4: 8.64 XOR Z EPg 22: 4:14.68 100. ESg 22: 4:27.16 OUR Z EPb 22: 4:21.32 145. AGG Z EPb 22: 4:24.84 169. ********************************************************************** 167. 12 SEP 1 4:21:31.00 38.958N 24.382E 10Km ML=2.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 4:21:39.10 49. ESg 4:21:44.94 XOR Z EPg 4:21:50.14 112. 4. 0.2 31. ESg 4:22: 3.42 PAIG Z IPg 4:21:51.74 123. ISg 4:22: 7.42 LOS Z EPg 4:21:51.10 124. OUR Z EPb 4:21:56.86 157. AGG Z EPb 4:21:59.58 178. 2. 0.1 24. ESb 4:22:21.66 ********************************************************************** 168. 12 SEP 1 6:38:39.65 38.025N 23.118E 5Km ML=3.1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z IPb 6:39: 0.46 130. 30. 0.1 77. ISb 6:39:17.26 AOS Z EPb 6:39: 2.90 143. ESb 6:39:20.06 XOR Z IPb 6:39: 4.22 149. ESb 6:39:21.26 PAIG Z EPb 6:39:13.06 217. 3.5 0.2 67. LIT Z IPn 6:39:15.71 237. ESn 6:39:44.18 OUR Z EPn 6:39:19.16 267. ********************************************************************** 169. 12 SEP 1 6:57:28.81 39.004N 24.359E 10Km ML=2.7 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 6:57:36.36 45. ESg 6:57:42.24 XOR Z EPg 6:57:46.24 109. ESg 6:58: 1.48 PAIG Z EPg 6:57:48.20 118. 17. 0.2 51. ESg 6:58: 3.76 LOS Z EPg 6:57:49.04 121. ESg 6:58: 4.20 OUR Z EPb 6:57:53.36 151. AGG Z EPb 6:57:57.16 176. 6. 0.1 44. ESb 6:58:18.88 LIT Z EPb 6:58: 0.76 202. ********************************************************************** 170. 12 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 9: 7:22.58 SRS Z EP 9: 7:25.02 LOS Z EP 9: 7:25.26 THE Z EP 9: 7:25.54 OUR Z EP 9: 7:25.78 KNT Z EP 9: 7:25.78 PAIG Z EP 9: 7:26.38 AOS Z EP 9: 7:26.82 GRG Z EP 9: 7:27.10 XOR Z EP 9: 7:28.14 AGG Z EP 9: 7:29.66 IGT Z EP 9: 7:32.26 LIT Z EP 9: 7:34.62 ********************************************************************** 171. 12 SEP 1 11: 2:52.07 39.136N 24.256E 10Km ML=2.5 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 11: 2:57.00 33. ESg 11: 3: 1.72 XOR Z EPg 11: 3: 8.16 95. ESg 11: 3:20.96 PAIG Z IPg 11: 3: 9.00 101. 13. 0.1 21. ISg 11: 3:22.76 LOS Z EPg 11: 3:11.28 113. ESg 11: 3:26.04 OUR Z EPb 11: 3:13.52 135. AGG Z EPb 11: 3:19.56 167. 2. 0.1 24. ********************************************************************** 172. 12 SEP 1 15: 0:50.70 39.096N 24.220E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 15: 0:55.32 31. ESg 15: 1: 0.40 XOR Z EPg 15: 1: 6.60 94. ESg 15: 1:18.96 PAIG Z EPg 15: 1: 8.32 103. LOS Z IPg 15: 1:10.92 119. OUR Z EPb 15: 1:12.76 139. ********************************************************************** 173. 12 SEP 1 20:21:16.68 39.119N 24.174E 8Km ML=2.6 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 20:21:20.86 26. ESg 20:21:25.26 XOR Z EPg 20:21:32.22 89. ESg 20:21:42.86 PAIG Z EPg 20:21:33.58 99. LOS Z EPg 20:21:36.14 120. ESg 20:21:51.34 OUR Z EPb 20:21:38.18 136. AGG Z IPb 20:21:41.50 160. 8. 0.2 42. ESb 20:22: 1.90 LIT Z ISb 20:22: 6.21 181. 3. 0.1 36. THE Z EPb 20:21:46.38 197. KNT Z IPn 20:21:53.90 252. ESn 20:22:22.86 ********************************************************************** 174. 12 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 21:13:38.71 ES 21:13:45.40 ********************************************************************** 175. 12 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP D 22:36:39.06 LOS Z EP D 22:36:44.46 SRS Z EP D 22:36:45.10 OUR Z EP D 22:36:46.26 SOH Z EP D 22:36:46.78 KNT Z EP D 22:36:46.94 THE Z EP D 22:36:47.58 PAIG Z EP D 22:36:48.10 GRG Z EP D 22:36:48.34 AOS Z IP D 22:36:49.78 XOR Z EP D 22:36:50.74 AGG Z EP D 22:36:53.66 IGT Z EP D 22:36:58.38 ********************************************************************** 176. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 1:36:43.40 ES 1:36:53.60 LIT Z EP 1:37:06.71 ES 1:37:32.80 ********************************************************************** 177. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z EP 2:31:57.76 AOS Z EP 2:31:59.76 PAIG Z EP 2:32:38.60 ********************************************************************** 178. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 5:15:39.01 AGG Z EP 5:16:01.80 ********************************************************************** 179. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 8:57:10.20 LOS Z EP 8:57:10.16 XOR Z EP 8:57:14.84 OUR Z IP 8:57:20.32 PAIG Z EP 8:57:25.51 ES 8:57:29.40 ********************************************************************** 180. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 10: 1:46.62 KNT Z EP 10: 1:49.78 ********************************************************************** 181. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 10:38: 9.78 LOS Z EP 10:38:17.66 XOR Z EP 10:38:20.94 PAIG Z EP 10:38:21.97 ********************************************************************** 182. 13 SEP 1 14:42:27.37 38.976N 24.362E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 14:42:35.02 47. ESg 14:42:41.26 XOR Z EPg 14:42:45.86 110. ESg 14:43: 0.46 PAIG Z EPg 14:42:47.18 121. ESg 14:43: 2.98 LOS Z EPg 14:42:47.94 123. OUR Z IPb 14:42:50.94 154. ********************************************************************** 183. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 15:32:26.88 LOS Z EP 15:32:44.60 SRS Z EP 15:32:51.88 KNT Z EP 15:32:59.00 ********************************************************************** 184. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 15:43:56.64 XOR Z EP 15:44: 2.64 LOS Z EP 15:44: 2.76 AGG Z EP 15:44: 3.72 PAIG Z EP 15:44: 6.80 14. 0.1 195. OUR Z EP 15:44:11.16 LIT Z EP 15:44:15.08 22. 0.1 154. ALN Z EP 15:44:14.92 THE Z EP 15:44:19.88 4. 0.1 68. SOH Z EP 15:44:20.20 SRS Z EP 15:44:23.32 10. 0.2 123. GRG Z EP 15:44:26.36 KNT Z IP 15:44:27.00 11. 0.2 130. ********************************************************************** 185. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 18:27:07.60 ********************************************************************** 186. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 18:44:44.30 ********************************************************************** 187. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. XOR Z EP 19:26:40.52 XOR ES 19:26:54.30 AOS Z EP 19:26:31.50 AOS ES 19:26:36.50 ********************************************************************** 188. 13 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. XOR Z EP 20:46:34.80 XOR ES 20:46:44.70 AOS Z EP 20:46:32.70 AOS ES 20:46:40.80 AGG Z EP 20:46:42.30 LIT Z EP 20:46:50.80 ********************************************************************** 189. 14 SEP 1 6:13:18.85 39.082N 24.214E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 6:13:23.52 31. ISg 6:13:28.56 XOR Z EPg 6:13:34.92 94. ESg 6:13:46.60 PAIG Z EPg 6:13:36.36 104. ESg 6:13:50.40 LOS Z EPg 6:13:39.24 120. ESg 6:13:54.60 OUR Z EPb 6:13:41.16 140. ISb 6:13:59.53 ********************************************************************** 190. 14 SEP 1 12:23:01.41 39.045N 24.213E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 12:23:06.36 32. ESg 12:23:11.44 XOR Z EPg 12:23:17.84 95. ESg 12:23:30.00 PAIG Z IPg 12:23:19.36 108. ESg 12:23:33.96 LOS Z EPg 12:23:22.36 124. ESg 12:23:38.60 OUR Z EPb 12:23:38.60 145. ISb 12:23:24.12 ********************************************************************** 191. 14 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 13:07:03.20 PAIG Z EP 13:07:10.50 ********************************************************************** 192. 14 SEP 1 16:46:42.09 38.956N 24.229E 10Km ML=2.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 16:46:48.30 38. ESg 16:46:53.50 XOR Z IPg 16:46:59.74 100. ESg 16:47:12.22 PAIG Z EPg 16:47: 1.42 118. 35. 0.1 35. ESg 16:47:16.98 LOS Z EPb 16:47: 4.26 131. ESb 16:47:21.26 OUR Z IPb 16:47: 6.26 154. AGG Z EPb 16:47: 8.30 165. 2. 0.2 26. ESb 16:47:30.14 ********************************************************************** 193. 14 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 18:54:52.81 LIT Z EP 18:54:57.91 XOR Z EP 18:55: 1.61 KNT Z EP 18:55: 8.15 AOS Z EP 18:55: 8.61 OUR Z EP 18:55:12.57 ********************************************************************** 194. 14 SEP 1 19:46:15.24 38.543N 23.820E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 19:46:26.78 70. ESg 19:46:36.82 XOR Z EPg 19:46:31.26 106. ESg 19:46:44.78 AGG Z EPb 19:46:37.22 140. ISb 19:46:54.01 OUR Z EPb 19:46:45.22 199. ********************************************************************** 195. 14 SEP 1 23:22:13.92 40.726N 23.398E 10Km ML=1.8 ---------------------------------------------------------------------- C/D Dis. A T Dur. SOH Z EPg 23:22:17.04 11. ESg 23:22:18.56 THE Z EPg 23:22:20.36 38. 4.5 0.1 10. ESg 23:22:25.04 SRS Z EPg 23:22:21.68 47. 4. 0.2 18. OUR Z EPg 23:22:24.80 66. ESg 23:22:33.00 PAIG Z EPg 23:22:28.96 92. ********************************************************************** 196. 15 SEP 1 5:20:29.88 39.110N 24.222E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 5:20:34.32 30. ESg 5:20:39.40 XOR Z EPg 5:20:45.96 93. ESg 5:20:58.04 PAIG Z EPg 5:20:47.04 102. ESg 5:21: 0.48 LOS Z EPg 5:20:49.96 118. ESg 5:21: 4.52 OUR Z EPb 5:20:51.72 137. ESb 5:21: 9.92 ********************************************************************** 197. 15 SEP 1 6:51:48.50 39.105N 24.251E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 6:51:53.80 33. ESg 6:51:58.48 XOR Z EPg 6:52: 4.80 96. ESg 6:52:16.72 PAIG Z EPg 6:52: 5.52 104. ESg 6:52:19.80 LOS Z EPg 6:52: 8.28 117. ISg 6:52:22.20 OUR Z EPb 6:52:10.64 138. ISb 6:52:29.06 ********************************************************************** 198. 15 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EPg 10:26:04.80 ESg 10:26:10.30 AOS Z EPG 10:26:25.10 XOR Z EPg 10:26:23.10 ********************************************************************** 199. 15 SEP 1 13:55:12.45 40.740N 23.393E 10Km ML=1.7 ---------------------------------------------------------------------- C/D Dis. A T Dur. SOH Z EPg 13:55:13.88 10. ESg 13:55:16.48 THE Z EPg 13:55:18.56 38. 3.0 0.2 ESg 13:55:23.52 SRS Z EPg 13:55:19.96 45. OUR Z EPg 13:55:23.36 67. ESg 13:55:31.96 PAIG Z IPg 13:55:28.60 93. ESg 13:55:40.76 ********************************************************************** 200. 15 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z IP 15:24:52.32 OUR Z EP 15:24:56.72 LOS Z EP 15:24:56.96 PAIG Z EP 15:25: 0.08 XOR Z EP 15:25: 0.20 LIT Z EP 15:25: 1.52 AOS Z EP 15:25: 2.73 ********************************************************************** 201. 15 SEP 1 17:47:14.02 40.808N 22.980E 10Km ML=2.8 ---------------------------------------------------------------------- C/D Dis. A T Dur. THE Z EPg 17:47:17.34 20. 55. 0.2 28. ESg 17:47:20.34 SOH Z EPg 17:47:19.26 32. KNT Z EPg 17:47:21.06 40. ESg 17:47:25.98 GRG Z EPg 17:47:22.86 51. ESg 17:47:29.22 SRS Z IPg 17:47:24.02 62. 53. LIT Z EPg 17:47:28.82 89. 22. 0.1 39. ESg 17:47:38.74 OUR Z EPg 17:47:30.18 100. ESg 17:47:43.06 PAIG Z EPg 17:47:32.98 114. ESg 17:47:47.58 XOR Z EPb 17:47:39.46 161. ESb 17:47:58.06 AOS Z IPb 17:47:44.02 197. AGG Z EPb 17:47:45.74 206. ********************************************************************** 202. 15 SEP 1 22:38:11.11 38.549N 25.653E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPb 22:38:37.86 169. ISb 22:38:58.62 PAIG Z EPn 22:38:46.66 229. ESn 22:39:13.90 XOR Z EPn 22:38:46.86 232. ESn 22:39:13.98 OUR Z EPn 22:38:49.14 245. ALN Z EPn 22:38:50.22 263. ********************************************************************** 203. 16 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 2: 1:20.50 XOR Z EP 2: 1:29.00 AOS Z EP 2: 1:29.50 LIT Z EP 2: 1:35.50 PAIG Z EP 2: 1:36.50 THE Z EP 2: 1:44.50 SRS Z EP 2: 1:53.00 ALN Z EP 2: 2: 4.50 ********************************************************************** 204. 16 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 2:54:51.20 ES 2:55:55.50 AOS Z EP 2:55:02.10 XOR Z EP 2:55:02.00 LIT Z EP 2:55:16.30 ********************************************************************** 205. 16 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 6:59:32.30 ES 7:00:01.50 LIT Z EP 6:59:49.80 XOR Z EP 6:59:49.80 ********************************************************************** 206. 16 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 7:18:28.50 PAIG Z EP 7:18:21.50 ********************************************************************** 207. 16 SEP 1 8:42:46.52 39.141N 24.206E 10Km ML=2.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 8:42:50.88 28. ESg 8:42:55.16 XOR Z EPg 8:43: 2.16 91. ESg 8:43:12.84 PAIG Z EPg 8:43: 3.60 98. 3. 0.1 17. ESg 8:43:15.44 LOS Z IPg 8:43: 5.84 116. OUR Z EPb 8:43: 8.04 134. ESb 8:43:25.58 ********************************************************************** 208. 16 SEP 1 11:22:20.73 38.912N 24.017E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 11:22:29.62 55. ESg 11:22:36.02 XOR Z EPg 11:22:40.62 117. ESg 11:22:55.98 LOS Z EPg 11:22:41.90 127. ESg 11:22:58.10 PAIG Z IPg 11:22:41.86 129. 3.5 0.2 26. ESg 11:22:59.42 OUR Z EPb 11:22:46.86 162. ********************************************************************** 209. 16 SEP 1 13:49:54.87 39.259N 24.000E 10Km ML=2.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 13:49:56.79 14. ESg 13:49:59.38 XOR Z EPg 13:50: 6.78 71. ESg 13:50:16.26 PAIG Z EPg 13:50: 7.98 79. 7. 0.2 21. ISg 13:50:18.74 LOS Z EPg 13:50:15.17 119. OUR Z EPg 13:50:14.14 119. ESg 13:50:29.98 AGG Z EPb 13:50:19.30 147. 2. 0.1 26. ********************************************************************** 210. 16 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 19:46:09.80 KNT Z EP 19:46:16.20 ********************************************************************** 211. 16 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IP 21:43:58.21 OUR Z EP 21:44: 6.06 PAIG Z EP 21:44:19.90 SRS Z EP 21:44:35.70 ALN Z EP 21:43:46.82 ********************************************************************** 212. 16 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. KNT Z EP 22:34:44.30 ********************************************************************** 213. 17 SEP 1 11:38:29.27 39.081N 24.253E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 11:38:34.32 34. ISg 11:38:39.32 XOR Z EPg 11:38:45.84 97. ISg 11:38:57.80 PAIG Z EPg 11:38:46.88 106. ESg 11:39: 1.44 OUR Z EPb 11:38:52.20 141. ESb 11:39: 9.37 THE Z EPb 11:39: 2.36 204. ********************************************************************** 214. 17 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. KNT Z EP 10:55:53.80 ES 10:56:17.40 SRS Z EP 10:55:53.20 ES 10:56:17.10 ********************************************************************** 215. 17 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 11:25:02.80 KNT Z EP 11:25:04.50 LIT Z EP 11:25:08.30 ********************************************************************** 216. 17 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EP 11:39:25.90 ES 11:39:43.60 ********************************************************************** 217. 17 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 13:51:03.60 ES 13:51:07.60 ********************************************************************** 218. 17 SEP 1 15: 1:39.65 40.763N 25.876E 10Km ML=3.3 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EPg 15: 1:45.36 35. ESg 15: 1:50.12 LOS Z EPg 15: 1:57.04 105. OUR Z EPb 15: 2: 5.04 151. SRS Z EPb 15: 2: 7.80 180. 84. ESb 15: 2:30.20 PAIG Z EPb 15: 2:10.16 193. 8. 0.2 61. SOH Z EPb 15: 2:11.56 196. ESb 15: 2:34.84 THE Z EPn 15: 2:15.32 229. 3. 0.1 KNT Z EPn 15: 2:16.80 238. 12.5 0.1 82. ESn 15: 2:45.72 LIT Z EPn 15: 2:21.56 280. ********************************************************************** 219. 17 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EPg 15: 8:11.30 ********************************************************************** 220. 17 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 15:51:49.80 ES 15:51:53.40 ********************************************************************** 221. 17 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 18:57:00.60 ES 18:57:12.40 ********************************************************************** 222. 17 SEP 1 19:15:50.41 38.919N 24.228E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 19:15:57.52 41. ESg 19:16: 2.80 XOR Z EPg 19:16: 8.28 102. ESg 19:16:21.40 PAIG Z EPg 19:16: 9.76 122. LOS Z EPb 19:16:13.24 135. ISb 19:16:30.16 OUR Z EPb 19:16:15.44 159. AGG Z EPb 19:16:16.72 165. ISb 19:16:37.80 ********************************************************************** 223. 17 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 22:41:21.35 XOR Z EP 22:41:29.37 AOS Z EP 22:41:30.31 LIT Z EP 22:41:39.20 KNT Z EP 22:41:53.10 SRS Z EP 22:41:53.80 ********************************************************************** 224. 17 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 23:04:08.11 ES 23:04:14.32 ********************************************************************** 225. 18 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 08:18:05.60 ES 08:18:14.35 ********************************************************************** 226. 18 SEP 1 16:13:46.50 39.160N 24.138E 5Km ML=2.4 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 16:13:49.68 22. ESg 16:13:54.00 XOR Z EPg 16:14: 0.96 85. ESg 16:14:11.48 PAIG Z EPg 16:14: 2.20 94. 11. 0.2 25. ESg 16:14:14.80 LOS Z IPg 16:14: 6.50 118. ESg 16:14:21.24 OUR Z EPb 16:14: 6.92 131. AGG Z EPb 16:14:11.80 157. 2. 0.1 11. ISb 16:14:32.04 ********************************************************************** 227. 18 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 18:26:21.30 ********************************************************************** 228. 19 SEP 1 0:11:22.19 39.117N 24.264E 15Km ML=3.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 0:11:27.88 34. ESg 0:11:33.04 XOR Z EPg 0:11:37.52 97. PAIG Z EPg 0:11:38.76 103. 31. 0.2 78. ESg 0:11:51.68 LOS Z EPg 0:11:40.08 115. OUR Z EPb 0:11:43.88 137. AGG Z EPb 0:11:48.32 168. 16. 0.1 73. LIT Z EPb 0:11:50.96 187. 4. 0.1 48. THE Z EPb 0:11:52.40 202. SOH Z EPb 0:11:52.64 205. SRS Z EPn 0:11:56.16 229. 4. 0.1 68. ALN Z EPn 0:11:59.28 249. KNT Z EPn 0:11:59.60 255. 4. 0.1 62. GRG Z EPn 0:12: 0.08 259. ********************************************************************** 229. 19 SEP 1 0:43: 4.73 38.910N 23.230E 10Km ML=2.3 ---------------------------------------------------------------------- C/D Dis. A T Dur. XOR Z EPg 0:43:13.30 51. ESg 0:43:18.94 AOS Z IPg 0:43:15.46 63. ESg 0:43:23.78 AGG Z EPg 0:43:17.66 79. 15. 0.2 26. ESg 0:43:28.46 PAIG Z IPg 0:43:24.70 119. ESg 0:43:40.26 LIT Z EPb 0:43:29.50 147. 3.5 0.1 25. OUR Z IPb 0:43:31.46 171. ********************************************************************** 230. 18 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 4:35:36.50 ES 4:36:11.30 ********************************************************************** 231. 19 SEP 1 4:58:16.13 36.986N 22.079E 15Km ML=3.3 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EPn 4:58:49.14 226. 12. 0.2 82. ESn 4:59:14.50 XOR Z EPn 4:58:56.90 279. ESn 4:59:26.74 AOS Z EPn 4:58:55.86 285. ISn 4:59:29.01 IGT Z EPn 4:59: 2.34 325. ESn 4:59:36.02 LIT Z EPn 4:59: 4.62 347. 3.5 0.1 65. ISn 4:59:41.93 PAIG Z EPn 4:59: 5.34 352. 2. 0.1 ESn 4:59:42.82 OUR Z EPn 4:59:11.06 403. ESn 4:59:54.18 GRG Z EPn 4:59:16.26 441. KNT Z EPn 4:59:18.30 468. 2. 0.1 11. ESn 5: 0: 8.58 ********************************************************************** 232. 19 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. SRS Z EP 9:12:50.24 ES 9:12:52.32 KNT Z EP 9:13: 2.72 ********************************************************************** 233. 19 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 9:58:04.70 ES 9:58:12.70 ********************************************************************** 234. 19 SEP 1 11:18:51.89 39.856N 23.459E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. PAIG Z EPg 11:18:55.38 21. ESg 11:18:58.46 XOR Z EPg 11:19: 2.02 59. ESg 11:19: 9.62 OUR Z EPg 11:19: 3.06 69. ESg 11:19:13.22 AOS Z IPg 11:19: 5.38 84. ESg 11:19:17.30 LIT Z EPg 11:19: 6.34 87. ESg 11:19:18.02 THE Z EPg 11:19: 8.06 96. ESg 11:19:19.82 SOH Z EPg 11:19: 9.62 108. LOS Z EPb 11:19:14.94 139. GRG Z EPb 11:19:17.02 152. ISb 11:19:35.62 KNT Z EPb 11:19:15.86 153. ESb 11:19:36.14 ********************************************************************** 235. 19 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 12:53:08.20 ES 12:53:20.70 ********************************************************************** 236. 19 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 13:07:48.70 ********************************************************************** 237. 19 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 13:30:42.80 ES 13:30:48.50 ********************************************************************** 238. 20 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. KNT Z EP 03:58:53.10 ES 03:58:58.40 SRS Z EP 03:58:54.00 ********************************************************************** 239. 20 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 15: 0:19.42 253. LIT Z EP 15: 0:25.90 300. 7.0 0.1 84. PAIG Z EP 15: 0:26.66 313. 3.5 0.1 64. OUR Z IP 15: 0:33.26 365. THE Z EP 15: 0:32.66 366. LOS Z EP 15: 0:35.74 385. SOH Z EP 15: 0:36.26 394. KNT Z EP 15: 0:40.98 422. SRS Z EP 15: 0:41.50 432. ALN Z EP 15: 0:51.38 519. ********************************************************************** 240. 21 SEP 1 1:37: 5.07 38.814N 23.512E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 1:37:13.56 51. ESg 1:37:20.84 XOR Z EPg 1:37:15.76 67. ISg 1:37:24.76 AGG Z IPg 1:37:22.04 105. ESg 1:37:35.36 PAIG Z EPg 1:37:25.24 124. ESg 1:37:40.32 LIT Z EPb 1:37:30.68 168. ESb 1:37:51.00 OUR Z EPb 1:37:31.84 173. ********************************************************************** 241. 21 SEP 1 3:18: 3.60 39.346N 22.915E 5Km ML=1.7 ---------------------------------------------------------------------- C/D Dis. A T Dur. XOR Z IPg 3:18: 7.37 24. ESg 3:18:10.44 AGG Z EPg 3:18:13.64 62. ESg 3:18:22.52 AOS Z EPg 3:18:18.48 85. ESg 3:18:27.96 LIT Z EPg 3:18:18.52 91. 2.0 0.2 15. ESg 3:18:31.20 ********************************************************************** 242. 21 SEP 1 6:50:54.44 39.155N 24.204E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 6:50:58.66 28. ESg 6:51: 3.08 XOR Z IPg 6:51: 9.85 90. ESg 6:51:20.24 PAIG Z EPg 6:51:10.69 97. ESg 6:51:23.08 LOS Z EPg 6:51:13.00 115. ESg 6:51:28.32 OUR Z IPb 6:51:15.24 132. AGG Z EPb 6:51:20.96 163. ESb 6:51:39.48 ********************************************************************** 243. 21 SEP 1 14:17:45.29 39.030N 24.204E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 14:17:50.30 32. ISg 14:17:55.53 XOR Z IPg 14:18: 1.46 95. ESg 14:18:12.46 PAIG Z EPg 14:18: 3.50 109. ESg 14:18:16.86 LOS Z EPg 14:18: 5.78 126. ESg 14:18:22.18 OUR Z EPb 14:18: 8.30 146. AGG Z EPb 14:18:11.06 162. ESb 14:18:31.82 ********************************************************************** 244. 22 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. IGT Z IP 3:36:30.64 LIT Z IP 3:36:37.12 AGG Z EP 3:36:37.68 KNT Z EP 3:36:38.48 THE Z EP 3:36:38.84 XOR Z EP 3:36:40.01 SOH Z EP 3:36:40.92 SRS Z EP 3:36:40.32 PAIG Z IP 3:36:42.04 OUR Z EP 3:36:42.56 AOS Z EP 3:36:42.76 LOS Z EP 3:36:46.40 ALN Z EP 3:36:48.80 ********************************************************************** 245. 22 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EP 18:33:49.10 IGT Z IP 18:33:52.44 PAIG Z IE 18:33:54.46 XOR Z IP 18:33:56.50 AOS Z EC 18:34: 7.97 OUR Z IP 18:34:10.72 KNT Z EP 18:34:17.20 ********************************************************************** 246. 23 SEP 1 0:45:19.64 40.134N 25.286E 10Km ML=2.6 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 0:45:25.26 28. ESg 0:45:29.48 ALN Z IPg 0:45:36.37 106. ESg 0:45:49.24 OUR Z IPg 0:45:37.65 113. ISg 0:45:51.41 PAIG Z EPb 0:45:40.88 139. ESb 0:45:57.28 AOS Z IPb 0:45:45.02 161. ISb 0:46: 2.76 SOH Z EPb 0:45:47.04 181. ESb 0:46: 9.32 XOR Z EPb 0:45:48.60 199. ESb 0:46:11.56 THE Z EPb 0:45:49.80 205. KNT Z EPn 0:45:53.12 232. 2.8 0.3 36. ESn 0:46:20.12 AGG Z EPn 0:46: 0.40 282. ESn 0:46:30.08 ********************************************************************** 247. 23 SEP 1 3: 1:16.77 39.159N 24.127E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 3: 1:20.17 21. ESg 3: 1:24.28 XOR Z EPg 3: 1:31.17 84. ESg 3: 1:41.44 PAIG Z EPg 3: 1:32.76 94. ESg 3: 1:44.32 LOS Z IPg 3: 1:35.74 119. ESg 3: 1:50.32 OUR Z IPb 3: 1:37.45 131. ISb 3: 1:53.41 AGG Z EPb 3: 1:41.12 156. ESb 3: 2: 0.80 LIT Z EPb 3: 1:43.20 175. ESb 3: 2: 3.56 KNT Z EPn 3: 1:53.88 246. ESn 3: 2:20.68 ********************************************************************** 248. 23 SEP 1 7:59:53.79 39.135N 24.206E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 7:59:58.20 28. ISg 8: 0: 3.58 XOR Z EPg 8: 0: 9.12 91. ISg 8: 0:20.01 PAIG Z EPg 8: 0:10.09 99. ESg 8: 0:23.04 LOS Z IPg 8: 0:12.41 116. ESg 8: 0:26.56 OUR Z IPb 8: 0:14.69 134. ESb 8: 0:30.64 AGG Z EPb 8: 0:18.92 163. ESb 8: 0:39.48 LIT Z EPb 8: 0:21.12 182. ESb 8: 0:42.16 SRS Z ESn 8: 0:52.69 226. ********************************************************************** 249. 23 SEP 1 9:46:20.70 39.105N 24.228E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 9:46:25.16 31. ESg 9:46:30.04 XOR Z EPg 9:46:37.32 94. ESg 9:46:47.76 PAIG Z EPg 9:46:38.16 103. ESg 9:46:51.24 OUR Z EPb 9:46:43.04 138. ********************************************************************** 250. 23 SEP 1 12:47:44.57 39.078N 24.249E 5Km ML=2.6 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 12:47:50.14 34. ESg 12:47:54.62 XOR Z IPg 12:48: 1.17 97. ESg 12:48:11.50 PAIG Z EPg 12:48: 2.22 106. ESg 12:48:14.42 LOS Z EPg 12:48: 3.90 119. ESg 12:48:19.26 OUR Z IPb 12:48: 6.54 141. ESb 12:48:24.90 AGG Z EPb 12:48:10.90 166. 5.5 0.6 36. ESb 12:48:31.18 LIT Z EPb 12:48:14.42 189. 2.4 0.2 39. ESb 12:48:38.94 THE Z EPb 12:48:16.78 205. ESb 12:48:41.50 SRS Z EPn 12:48:19.90 233. 3.0 0.1 ESn 12:48:48.14 ALN Z EPn 12:48:23.02 254. ISn 12:48:52.82 KNT Z IPn 12:48:22.62 258. 2.8 0.4 13. ESn 12:48:53.94 ********************************************************************** 251. 23 SEP 1 19:35: 7.13 39.009N 24.291E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 19:35:11.97 32. ISg 19:35:17.14 XOR Z EPg 19:35:23.08 95. ESg 19:35:34.48 PAIG Z IPg 19:35:25.10 111. ESg 19:35:38.78 LOS Z EPg 19:35:27.12 128. ESg 19:35:43.54 OUR Z IPb 19:35:29.93 148. ESb 19:35:47.54 AGG Z EPb 19:35:32.34 161. ESb 19:35:50.58 ********************************************************************** 252. 23 SEP 1 21:16:14.53 37.523N 20.962E 10Km ML=4.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z EPb 21:16:46.02 205. 61.0 0.4 250. IGT Z EPn 21:16:46.89 230. ESn 21:17:14.82 XOR Z IPn 21:16:54.89 282. AOS Z EPn 21:16:58.58 314. LIT Z EPn 21:16:58.46 315. 39.0 0.7 190. PAIG Z IPn 21:17: 3.29 356. THE Z EPn 21:17: 7.02 386. OUR Z IPn 21:17: 9.70 407. SOH Z EPn 21:17:12.06 420. ISn 21:17:56.26 KNT Z EPn 21:17:13.54 437. 10.0 0.6 160. ISn 21:17:58.46 LOS Z EPn 21:17:14.74 447. SRS Z EPn 21:17:15.94 459. 9.0 0.8 153. ALN Z EPn 21:17:31.22 577. ********************************************************************** 253. 24 SEP 1 6:26: 3.46 40.582N 20.884E 5Km ML=3.1 ---------------------------------------------------------------------- C/D Dis. A T Dur. IGT Z EPg 6:26:22.48 126. ESg 6:26:36.88 GRG Z EPb 6:26:23.76 135. ESb 6:26:40.24 LIT Z EPb 6:26:26.04 146. 44.0 0.3 68. ESb 6:26:43.48 THE Z EPb 6:26:29.16 176. 3.4 0.5 36. ISb 6:26:48.44 KNT Z EPb 6:26:30.12 182. 15.0 0.7 65. ESb 6:26:50.20 SOH Z EPb 6:26:34.04 210. ESb 6:26:57.12 AGG Z IPb 6:26:34.74 213. 12.1 0.4 63. ESb 6:26:57.60 SRS Z EPn 6:26:38.00 236. 2.8 0.4 55. ESn 6:27: 2.40 XOR Z IPn 6:26:37.53 239. ESn 6:27: 1.72 PAIG Z EPn 6:26:38.32 249. ESn 6:27: 6.08 OUR Z EPn 6:26:40.64 264. ESn 6:27: 9.32 AOS Z EPn 6:26:44.52 300. ESn 6:27:16.36 ********************************************************************** 254. 24 SEP 1 12: 6:57.59 39.096N 24.227E 5Km ML=2.7 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 12: 7: 2.78 31. ESg 12: 7: 7.24 XOR Z IPg 12: 7:13.17 94. ESg 12: 7:24.30 PAIG Z EPg 12: 7:14.57 104. ESg 12: 7:27.02 LOS Z IPg 12: 7:16.66 119. ISg 12: 7:31.66 OUR Z IPb 12: 7:19.21 139. ESb 12: 7:36.10 AGG Z EPb 12: 7:24.62 164. 6.3 0.3 33. ESb 12: 7:43.46 LIT Z EPb 12: 7:25.54 186. 3.0 0.2 36. ESb 12: 7:46.86 SRS Z EPn 12: 7:31.46 231. ESn 12: 7:59.10 ALN Z EPn 12: 7:33.98 253. ESn 12: 8: 2.82 KNT Z EPn 12: 7:35.54 256. 3.0 0.3 ESn 12: 8: 2.78 GRG Z IPn 12: 7:35.54 259. ********************************************************************** 255. 24 SEP 1 22:48:18.99 40.424N 22.419E 5Km ML=1.6 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EPg 22:48:24.96 36. 6.5 0.2 14. ESg 22:48:30.32 THE Z EPg 22:48:27.76 52. ESg 22:48:34.52 GRG Z EPg 22:48:28.84 59. ISg 22:48:36.96 KNT Z EPg 22:48:34.08 91. ISg 22:48:44.96 ********************************************************************** 256. 25 SEP 1 5:42:30.38 39.735N 20.333E 5Km ML=3.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. IGT Z EPg 5:42:34.02 11. ESg 5:42:39.02 AGG Z EPb 5:42:58.18 185. 12.0 0.2 70. ESb 5:43:18.58 LIT Z EPb 5:42:59.30 192. 58. ESb 5:43:21.02 GRG Z EPn 5:43: 4.18 229. ESn 5:43:28.58 XOR Z EPn 5:43: 6.70 248. ESn 5:43:33.26 THE Z EPn 5:43: 6.26 250. ESn 5:43:33.70 KNT Z EPn 5:43: 9.82 276. 4.0 0.2 54. ESn 5:43:37.86 PAIG Z EPn 5:43:10.10 288. ESn 5:43:41.22 AOS Z EPn 5:43:12.98 310. ESn 5:43:46.70 OUR Z IPn 5:43:14.90 321. ESn 5:43:48.18 SRS Z EPn 5:43:14.02 322. ESn 5:43:47.46 ********************************************************************** 257. 25 SEP 1 8:17:42.81 39.185N 24.008E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 8:17:46.98 28. ISg 8:17:51.01 XOR Z EPg 8:17:58.02 90. ESg 8:18: 8.66 PAIG Z EPg 8:17:59.01 94. ESg 8:18:11.34 LOS Z EPg 8:18: 1.46 112. ESg 8:18:15.38 OUR Z IPg 8:18: 4.01 129. ESg 8:18:19.90 AGG Z EPb 8:18: 9.94 163. ESb 8:18:29.34 ********************************************************************** 258. 25 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EP 11:33:44.50 KNT Z IP 11:33:50.42 LOS Z EP 11:33:50.62 OUR Z IP 11:33:51.37 PAIG Z EP 11:33:53.46 GRG Z IP 11:33:54.74 LIT Z EP 11:33:54.86 AGG Z EP 11:33:59.02 IGT Z EP 11:34: 2.42 ********************************************************************** 259. 25 SEP 1 14:17:28.43 40.211N 25.261E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 14:17:33.69 34. ESg 14:17:38.02 ALN Z IPg 14:17:44.94 101. ESg 14:17:57.74 OUR Z IPg 14:17:46.14 110. ESg 14:17:59.46 PAIG Z EPb 14:17:51.22 139. AOS Z IPb 14:17:55.53 165. ********************************************************************** 260. 25 SEP 1 14:18:16.18 40.142N 25.280E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 14:18:21.62 29. ESg 14:18:26.22 ALN Z EPg 14:18:32.90 106. ESg 14:18:45.70 OUR Z EPg 14:18:33.94 113. ESg 14:18:47.38 PAIG Z EPb 14:18:38.02 139. ESb 14:18:53.18 SRS Z EPb 14:18:43.02 179. ESb 14:19: 4.50 ********************************************************************** 261. 25 SEP 1 16:27:15.25 40.210N 25.223E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 16:27:20.73 33. ESg 16:27:25.00 ALN Z IPg 16:27:32.30 103. ESg 16:27:44.84 OUR Z EPg 16:27:32.84 107. ESg 16:27:46.28 PAIG Z EPb 16:27:37.28 135. ESb 16:27:52.92 AOS Z IPb 16:27:41.48 163. ESb 16:28: 1.16 SRS Z ESb 16:28: 3.68 171. KNT Z EPn 16:27:49.20 223. ISn 16:28:16.52 ********************************************************************** 262. 25 SEP 1 23:23:11.23 40.458N 21.050E 5Km ML=2.7 ---------------------------------------------------------------------- C/D Dis. A T Dur. FNA Z IPg 23:23:18.10 46. ESg 23:23:25.10 IGT Z EPg 23:23:30.82 120. ESg 23:23:44.58 GRG Z EPg 23:23:32.62 127. ESg 23:23:47.46 LIT Z EPg 23:23:32.78 129. 10.0 0.2 43. ESg 23:23:48.74 THE Z EPb 23:23:37.66 163. ESb 23:23:57.78 KNT Z EPb 23:23:39.18 174. 4.0 0.3 42. ESb 23:23:59.46 AGG Z EPb 23:23:41.42 193. 3.5 0.2 84. ESb 23:24: 5.74 SOH Z ESb 23:24: 4.46 199. XOR Z IPb 23:23:42.70 220. ESb 23:24: 9.46 SRS Z EPn 23:23:46.70 227. ESn 23:24:12.46 PAIG Z EPn 23:23:46.86 231. ESn 23:24:13.78 OUR Z EPn 23:23:48.14 249. ESn 23:24:17.66 ********************************************************************** 263. 25 SEP 1 23:56:34.85 39.113N 24.186E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 23:56:39.10 27. ESg 23:56:43.18 XOR Z ESg 23:57: 1.94 90. PAIG Z IPg 23:56:52.10 100. ESg 23:57: 4.46 LOS Z EPg 23:56:55.02 119. ESg 23:57: 9.66 OUR Z EPb 23:56:56.74 137. ********************************************************************** 264. 26 SEP 1 1:21: 0.48 40.204N 25.281E 10Km ML=3.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z EPg 1:21: 6.14 34. ESg 1:21:10.26 ALN Z IPg 1:21:17.29 101. ESg 1:21:30.02 OUR Z IPg 1:21:18.29 111. ESg 1:21:32.66 PAIG Z EPb 1:21:23.46 140. ESb 1:21:40.58 AOS Z EPb 1:21:28.02 166. ESb 1:21:48.34 SRS Z EPb 1:21:28.50 175. 9.2 0.2 50. ESb 1:21:49.66 SOH Z EPb 1:21:29.82 177. ESb 1:21:51.66 THE Z EPb 1:21:33.34 202. ESb 1:21:57.54 KNT Z EPn 1:21:35.62 228. 3.8 0.2 48. ESn 1:22: 3.98 GRG Z EPn 1:21:40.94 258. ESn 1:22:11.14 AGG Z EPn 1:21:42.62 285. ESn 1:22:16.30 ********************************************************************** 265. 26 SEP 1 1:29:35.54 40.158N 25.262E 20Km ML=3.7 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 1:29:40.74 29. ESg 1:29:45.96 ALN Z IPg 1:29:51.89 106. ESg 1:30: 5.16 OUR Z IPg 1:29:53.10 111. ESg 1:30: 6.36 PAIG Z IPb 1:29:56.54 137. ESb 1:30:12.16 AOS Z EPb 1:30: 0.22 162. ESb 1:30:18.84 SRS Z IPb 1:30: 2.18 177. 47.0 0.3 163. ESb 1:30:22.12 SOH Z EPb 1:30: 2.08 178. ISb 1:30:23.28 XOR Z EPb 1:30: 4.45 198. ESb 1:30:28.20 THE Z EPb 1:30: 4.88 202. 5.0 0.9 81. ESb 1:30:28.88 KNT Z EPn 1:30: 8.64 229. 20.0 0.8 144. ESn 1:30:34.24 LIT Z EPn 1:30:10.32 236. 5.0 1.0 110. ESn 1:30:35.48 GRG Z EPn 1:30:13.28 258. ESn 1:30:41.12 AGG Z IPn 1:30:15.32 282. 8.0 0.8 121. ESn 1:30:45.52 IGT Z IPn 1:30:33.44 427. ESn 1:31:16.92 ********************************************************************** 266. 26 SEP 1 1:50:41.09 40.223N 25.234E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z EPg 1:50:46.70 35. ISg 1:50:50.86 ALN Z IPg 1:50:58.14 102. ESg 1:51:10.90 OUR Z IPg 1:50:59.06 107. ESg 1:51:12.50 AOS Z EPb 1:51: 8.10 165. SRS Z ESb 1:51:29.70 171. ********************************************************************** 267. 26 SEP 1 2:59:53.36 40.099N 25.335E 5Km ML=3.5 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 2:59:59.02 28. ESg 3: 0: 4.06 ALN Z IPg 3: 0:10.17 107. ESg 3: 0:23.14 OUR Z EPg 3: 0:11.26 118. ESg 3: 0:25.34 AOS Z IPb 3: 0:18.37 162. ESb 3: 0:37.70 SRS Z EPb 3: 0:19.70 186. 32.0 0.3 97. ESb 3: 0:41.94 SOH Z EPb 3: 0:20.70 186. ISb 3: 0:43.18 XOR Z EPb 3: 0:22.42 201. ESb 3: 0:45.78 THE Z EPb 3: 0:24.82 210. ESb 3: 0:48.26 KNT Z IPn 3: 0:26.82 238. 9.8 0.5 83. ESn 3: 0:54.62 LIT Z EPn 3: 0:28.66 243. ISn 3: 0:55.14 GRG Z EPn 3: 0:31.66 266. ESn 3: 0:59.78 AGG Z IPn 3: 0:33.02 284. ESn 3: 1: 2.86 ********************************************************************** 268. 26 SEP 1 3: 7:57.42 38.924N 23.154E 10Km ML=3.1 ---------------------------------------------------------------------- C/D Dis. A T Dur. XOR Z EPg 3: 8: 5.64 49. ESg 3: 8:11.20 AOS Z IPg 3: 8: 9.00 69. ESg 3: 8:17.68 AGG Z EPg 3: 8: 8.80 72. 74. ESg 3: 8:19.08 PAIG Z IPg 3: 8:18.29 120. ESg 3: 8:33.12 LIT Z EPb 3: 8:20.36 143. 16.0 0.6 73. OUR Z IPb 3: 8:24.13 172. ESb 3: 8:44.96 THE Z EPb 3: 8:26.04 190. LOS Z IPb 3: 8:27.84 200. SOH Z EPb 3: 8:30.88 211. ESb 3: 8:53.64 GRG Z IPn 3: 8:31.92 235. SRS Z IPn 3: 8:33.36 246. KNT Z EPn 3: 8:34.48 249. 6.5 0.5 58. FNA Z IPn 3: 8:36.44 256. ********************************************************************** 269. 26 SEP 1 4: 1:50.45 40.063N 22.749E 10Km ML=2.1 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z IPg 4: 1:53.66 23. 30.0 0.2 25. ESg 4: 1:57.54 THE Z EPg 4: 2: 1.70 66. XOR Z IPg 4: 2: 5.25 86. ESg 4: 2:15.42 SOH Z IPg 4: 2: 7.22 99. ISg 4: 2:19.34 GRG Z EPg 4: 2: 8.10 104. OUR Z IPg 4: 2: 8.62 109. ESg 4: 2:22.06 AGG Z EPg 4: 2:10.46 121. 3.3 0.2 23. ESg 4: 2:26.54 KNT Z EPg 4: 2:10.50 123. ESg 4: 2:26.62 ********************************************************************** 270. 26 SEP 1 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EP 4:21:17.88 LOS Z IP 4:21:17.88 XOR Z IP 4:21:18.96 AGG Z EP 4:21:21.00 PAIG Z EP 4:21:22.48 OUR Z IP 4:21:25.60 ALN Z EP 4:21:26.40 LIT Z EP 4:21:31.60 THE Z EP 4:21:35.48 IGT Z EP 4:21:38.20 SRS Z EP 4:21:40.96 GRG Z EP 4:21:42.00 KNT Z EP 4:21:42.52 ********************************************************************** 271. 26 SEP 1 5:50:58.35 40.132N 25.288E 10Km ML=3.2 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 5:51: 3.85 28. ESg 5:51: 7.28 ALN Z IPg 5:51:14.93 106. ESg 5:51:27.88 OUR Z IPg 5:51:16.30 113. ISg 5:51:29.46 PAIG Z EPb 5:51:19.84 139. ISb 5:51:36.09 AOS Z EPb 5:51:23.72 161. ESb 5:51:41.92 SRS Z EPb 5:51:24.68 180. 20.0 0.1 58. ISb 5:51:47.90 SOH Z EPb 5:51:26.08 181. ESb 5:51:46.76 XOR Z EPb 5:51:28.92 199. ESb 5:51:48.92 THE Z EPb 5:51:28.64 205. ESb 5:51:52.36 KNT Z IPn 5:51:31.93 232. 7.0 0.3 48. ESn 5:51:58.28 GRG Z EPn 5:51:35.96 261. ESn 5:52: 6.44 AGG Z EPn 5:51:38.52 282. ESn 5:52: 7.32 ********************************************************************** 272. 26 SEP 1 6:21:43.23 40.175N 25.428E 20Km ML=3.5 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 6:21:49.38 26. ESg 6:21:54.32 ALN Z IPg 6:22: 0.46 110. ESg 6:22:13.52 OUR Z EPg 6:22: 1.77 118. ESg 6:22:15.12 PAIG Z IPb 6:22: 5.22 142. ESb 6:22:21.32 AOS Z EPb 6:22: 8.92 160. ISb 6:22:25.56 SOH Z EPb 6:22:10.48 187. ESb 6:22:33.68 SRS Z EPb 6:22:10.20 187. 115. ESb 6:22:33.36 XOR Z IPb 6:22:12.74 199. ESb 6:22:34.92 THE Z EPb 6:22:14.32 210. ESb 6:22:39.32 KNT Z EPn 6:22:17.16 238. 22.0 0.2 112. ESn 6:22:42.92 LIT Z EPn 6:22:17.68 242. 6.0 0.2 61. ESn 6:22:43.32 GRG Z EPn 6:22:21.16 267. ESn 6:22:49.96 AGG Z EPn 6:22:22.28 283. 3.1 0.6 70. ESn 6:22:50.08 ********************************************************************** 273. 26 SEP 1 6:54:32.96 38.971N 24.444E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 6:54:41.32 54. ESg 6:54:48.88 XOR Z EPg 6:54:53.04 117. ESg 6:55: 7.12 LOS Z EPg 6:54:53.20 120. ESg 6:55: 8.56 PAIG Z EPg 6:54:53.48 125. ESg 6:55:10.60 OUR Z EPb 6:54:57.92 156. ESb 6:55:17.96 AGG Z EPb 6:55: 2.36 183. ESb 6:55:25.64 ********************************************************************** 274. 26 SEP 1 8:15:34.83 40.146N 25.275E 20Km ML=3.5 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 8:15:40.25 29. ESg 8:15:45.32 ALN Z IPg 8:15:51.41 106. ESg 8:16: 4.12 OUR Z IPg 8:15:52.58 112. ESg 8:16: 6.12 PAIG Z IPb 8:15:56.06 138. ISb 8:16:11.61 AOS Z EPb 8:15:59.74 161. ESb 8:16:18.24 SRS Z IPb 8:16: 0.85 179. 21.0 0.6 141. ESb 8:16:21.64 SOH Z EPb 8:16: 1.44 179. ESb 8:16:21.88 XOR Z EPb 8:16: 4.08 198. ESb 8:16:23.08 THE Z EPb 8:16: 5.04 203. 3.5 0.5 ESb 8:16:28.20 KNT Z IPn 8:16: 8.06 230. 19.0 0.2 110. ESn 8:16:33.48 LIT Z EPn 8:16: 8.72 237. 4.0 0.5 62. ISn 8:16:34.36 GRG Z EPn 8:16:12.00 259. ISn 8:16:40.76 AGG Z EPn 8:16:14.60 282. 4.0 0.7 70. ESn 8:16:44.04 ********************************************************************** 275. 27 SEP 1 5:18: 3.39 38.175N 22.696E 20Km ML=2.8 ---------------------------------------------------------------------- C/D Dis. A T Dur. AGG Z IPg 5:18:19.14 99. 41.0 0.1 45. ESg 5:18:31.32 XOR Z EPb 5:18:24.90 139. ESb 5:18:40.56 AOS Z EPb 5:18:25.98 151. ESb 5:18:43.68 PAIG Z EPb 5:18:33.84 212. ESb 5:18:57.00 LIT Z EPb 5:18:34.84 214. 2.4 0.6 43. ESb 5:18:57.40 IGT Z EPn 5:18:38.68 254. OUR Z EPn 5:18:40.16 264. ESn 5:19: 8.20 ********************************************************************** 276. 27 SEP 1 11:40:15.83 39.204N 24.142E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 11:40:19.10 23. ESg 11:40:22.84 XOR Z EPg 11:40:30.01 84. ESg 11:40:40.20 PAIG Z EPg 11:40:30.96 90. ESg 11:40:42.96 LOS Z EPg 11:40:34.82 114. ESg 11:40:49.04 OUR Z EPg 11:40:36.33 126. ESg 11:40:51.76 AGG Z EPb 11:40:41.94 158. ESb 11:41: 0.24 ********************************************************************** 277. 27 SEP 1 14: 0:44.22 40.210N 25.261E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z EPg 14: 0:50.02 34. ESg 14: 0:54.42 ALN Z EPg 14: 1: 1.14 101. ISg 14: 1:14.02 OUR Z EPg 14: 1: 2.17 110. ESg 14: 1:16.62 SRS Z EPb 14: 1:12.46 173. ESb 14: 1:33.98 ********************************************************************** 278. 27 SEP 1 17:58:11.51 39.642N 23.866E 5Km ML=2.8 ---------------------------------------------------------------------- C/D Dis. A T Dur. PAIG Z IPg 17:58:17.58 36. ESg 17:58:22.50 AOS Z EPg 17:58:20.02 52. ESg 17:58:26.98 XOR Z EPg 17:58:22.74 66. ESg 17:58:31.26 OUR Z IPg 17:58:24.62 78. ESg 17:58:34.66 LOS Z EPg 17:58:29.30 109. ESg 17:58:43.94 LIT Z EPg 17:58:31.70 128. 8.8 0.2 40. ESg 17:58:48.50 THE Z EPb 17:58:33.02 134. 4.2 0.5 25. ESb 17:58:49.42 SOH Z EPb 17:58:33.82 138. ESb 17:58:50.46 AGG Z EPb 17:58:35.94 149. 10.3 0.3 48. ESb 17:58:53.38 SRS Z EPb 17:58:37.50 165. 4.2 0.3 40. ISb 17:58:58.58 KNT Z EPb 17:58:41.54 188. 8.0 0.2 72. ESb 17:59: 4.22 GRG Z EPb 17:58:41.10 192. ESb 17:59: 4.18 ALN Z EPn 17:58:46.74 232. ESn 17:59:14.34 FNA Z EPn 17:58:49.26 246. ESn 17:59:17.98 ********************************************************************** 279. 27 SEP 1 19:29:11.17 40.067N 22.423E 5Km ML=2.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EPg 19:29:11.82 7. 51.0 0.2 31. ESg 19:29:14.06 THE Z EPg 19:29:24.21 78. ESg 19:29:34.66 GRG Z EPg 19:29:27.50 99. ESg 19:29:40.94 XOR Z IPg 19:29:28.62 102. ESg 19:29:40.86 SOH Z ESg 19:29:45.34 115. AGG Z EPg 19:29:30.26 116. 4.0 0.3 28. ESg 19:29:46.26 KNT Z IPg 19:29:32.18 128. 3.0 0.2 23. ESg 19:29:49.26 OUR Z EPb 19:29:33.50 136. ESb 19:29:51.18 IGT Z ESb 19:30: 5.22 189. ********************************************************************** 280. 28 SEP 1 5:18:30.85 40.071N 22.741E 5Km ML=2.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. LIT Z EPg 5:18:34.18 22. 22.0 0.2 23. ESg 5:18:38.06 THE Z IPg 5:18:41.98 65. ESg 5:18:49.18 XOR Z EPg 5:18:45.74 87. ESg 5:18:56.42 SOH Z EPg 5:18:47.50 98. ESg 5:18:59.50 AGG Z EPg 5:18:50.70 122. ESg 5:19: 7.14 KNT Z IPg 5:18:51.14 122. ESg 5:19: 6.94 ********************************************************************** 281. 28 SEP 1 5:19:15.14 40.167N 25.286E 10Km ML=2.8 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z EPg 5:19:21.14 31. ESg 5:19:25.06 ALN Z EPg 5:19:31.42 104. ESg 5:19:44.34 OUR Z IPg 5:19:33.06 112. ESg 5:19:46.58 PAIG Z EPb 5:19:36.62 140. ESb 5:19:52.82 AOS Z EPb 5:19:40.06 164. SOH Z EPb 5:19:43.06 179. KNT Z EPn 5:19:48.78 230. 4.2 0.2 42. ESn 5:20:15.58 ********************************************************************** 282. 28 SEP 1 5:47:24.75 40.167N 25.288E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. ALN Z EPg 5:47:42.09 103. ESg 5:47:55.24 OUR Z EPg 5:47:43.16 113. ESg 5:47:58.60 SRS Z ESb 5:48:15.04 178. KNT Z EPn 5:48: 0.92 230. ESn 5:48:28.68 ********************************************************************** 283. 28 SEP 1 16:13:34.79 36.030N 23.128E 5Km ML=3.6 ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPn 16:14:22.92 355. ESn 16:14:59.44 XOR Z EPn 16:14:25.48 370. ESn 16:15: 2.68 PAIG Z EPn 16:14:31.88 435. ESn 16:15:17.20 LIT Z EPn 16:14:35.56 455. 2.0 0.4 ESn 16:15:22.40 IGT Z EPn 16:14:35.36 460. ESn 16:15:23.24 OUR Z EPn 16:14:38.12 483. ESn 16:15:28.20 SRS Z EPn 16:14:49.84 566. ESn 16:15:46.80 KNT Z EPn 16:14:49.76 570. ESn 16:15:47.76 ********************************************************************** 284. 29 SEP 1 2:34: 1.99 40.223N 25.227E 5Km ML=2.9 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z EPg 2:34: 7.66 34. ESg 2:34:11.98 ALN Z IPg 2:34:18.90 102. ESg 2:34:32.18 OUR Z EPg 2:34:19.90 107. ESg 2:34:32.90 AOS Z EPb 2:34:29.22 164. ESb 2:34:49.18 SRS Z IPb 2:34:29.82 170. 7.1 0.2 49. ESb 2:34:50.42 SOH Z IPb 2:34:29.94 172. ESb 2:34:51.66 THE Z EPb 2:34:33.30 197. ESb 2:34:57.26 XOR Z EPb 2:34:32.94 198. ESb 2:34:57.74 KNT Z EPn 2:34:36.30 223. 3.0 0.2 48. ESn 2:35: 4.34 GRG Z EPn 2:34:41.30 253. ESn 2:35:10.18 ********************************************************************** 285. 29 SEP 1 5:17:47.09 40.165N 25.220E 5Km ML=3.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. LOS Z IPg 5:17:51.46 28. ESg 5:17:55.44 OUR Z EPg 5:18: 5.20 107. ESg 5:18:18.48 ALN Z IPg 5:18: 5.20 107. ESg 5:18:18.72 PAIG Z EPb 5:18: 9.64 134. ESb 5:18:25.84 AOS Z EPb 5:18:13.72 159. ESb 5:18:33.24 SRS Z EPb 5:18:14.92 174. 10.6 0.2 51. ESb 5:18:36.60 SOH Z EPb 5:18:14.88 174. ESb 5:18:37.52 XOR Z EPb 5:18:17.48 195. ESb 5:18:39.80 KNT Z EPn 5:18:21.82 225. 3.8 0.2 58. ESn 5:18:49.60 GRG Z EPn 5:18:26.36 254. ESn 5:18:57.08 ********************************************************************** 286. 29 SEP 1 6:46:11.99 39.211N 24.164E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 6:46:15.60 25. ISg 6:46:19.90 XOR Z EPg 6:46:26.64 86. ESg 6:46:37.04 PAIG Z EPg 6:46:27.00 90. ESg 6:46:38.08 LOS Z EPg 6:46:30.84 113. ESg 6:46:44.40 OUR Z EPg 6:46:33.00 126. ESg 6:46:48.48 ********************************************************************** 287. 29 SEP 1 9:28:26.90 39.046N 24.349E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 9:28:33.62 43. ESg 9:28:40.28 XOR Z EPg 9:28:45.01 106. ESg 9:28:58.00 PAIG Z IPg 9:28:45.88 113. ESg 9:29: 0.60 LOS Z EPg 9:28:46.60 117. OUR Z EPb 9:28:50.48 146. ********************************************************************** 288. 29 SEP 1 14:30:39.42 39.129N 24.197E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 14:30:43.74 28. ESg 14:30:47.62 XOR Z EPg 14:30:54.90 91. ESg 14:31: 6.46 PAIG Z EPg 14:30:55.98 99. ESg 14:31: 8.86 LOS Z IPg 14:30:59.14 117. ESg 14:31:13.58 OUR Z EPb 14:31: 1.02 135. ISb 14:31:18.90 KNT Z EPn 14:31:17.94 251. ESn 14:31:47.74 GRG Z ESn 14:31:48.57 254. ********************************************************************** 289. 30 SEP 1 5:51:29.26 39.023N 24.092E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 5:51:35.14 36. ISg 5:51:40.61 XOR Z EPg 5:51:45.38 99. ESg 5:51:57.50 PAIG Z EPg 5:51:46.78 104. ESg 5:51:59.62 LOS Z IPg 5:51:47.61 113. ESg 5:52: 2.34 OUR Z EPb 5:51:50.98 137. ESb 5:52: 8.58 AGG Z EPb 5:51:56.74 170. ESb 5:52:16.82 LIT Z EPb 5:51:58.70 189. ESb 5:52:21.46 ALN Z EPn 5:52: 6.34 247. ESn 5:52:35.90 KNT Z EPn 5:52: 8.18 256. ISn 5:52:36.54 ********************************************************************** 290. 30 SEP 1 15:51:13.39 39.144N 24.187E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 15:51:17.66 27. ESg 15:51:21.94 XOR Z EPg 15:51:27.94 89. ESg 15:51:39.42 PAIG Z EPg 15:51:29.74 97. ISg 15:51:41.70 LOS Z EPg 15:51:32.46 117. ISg 15:51:47.74 OUR Z IPb 15:51:34.42 133. ESb 15:51:51.34 AGG Z ESb 15:51:59.58 161. ********************************************************************** 291. 30 SEP 1 18:14:29.38 39.101N 24.198E 10Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z IPg 18:14:33.54 29. ESg 18:14:37.94 XOR Z EPg 18:14:44.98 92. ISg 18:14:55.62 PAIG Z EPg 18:14:46.65 102. ESg 18:14:58.46 LOS Z EPg 18:14:48.78 120. ESg 18:15: 3.34 OUR Z EPb 18:14:51.30 138. ESb 18:15: 8.70 ********************************************************************** 292. 30 SEP 1 21:49:36.15 39.826N 20.602E 15Km ML=3.0 ---------------------------------------------------------------------- C/D Dis. A T Dur. IGT Z IPg 21:49:42.65 40. ESg 21:49:49.56 FNA Z EPg 21:49:56.06 125. ESg 21:50:12.56 LIT Z EPb 21:50: 1.48 164. 12.7 0.2 69. ESb 21:50:22.04 GRG Z IPb 21:50: 6.56 198. ESb 21:50:29.52 THE Z EPb 21:50: 8.80 220. ESb 21:50:33.72 XOR Z EPn 21:50:10.40 228. KNT Z EPn 21:50:11.52 245. 2.9 0.3 45. ESn 21:50:40.52 AOS Z EPn 21:50:18.40 291. OUR Z EPn 21:50:17.46 294. ESn 21:50:50.40 ********************************************************************** 293. 30 SEP 1 23:19:17.70 39.112N 24.218E 5Km ML= ---------------------------------------------------------------------- C/D Dis. A T Dur. AOS Z EPg 23:19:22.44 30. ESg 23:19:26.92 XOR Z EPg 23:19:33.40 93. ESg 23:19:43.96 PAIG Z EPg 23:19:34.80 102. ESg 23:19:47.76 LOS Z EPg 23:19:37.08 118. ESg 23:19:51.48 OUR Z IPb 23:19:39.06 137. ISb 23:19:56.88 ------=_NextPart_000_004A_01C2C12A.CF246010--
      中文字幕一区一区三区| 亚洲国产成人精品无码区在线观看| 自拍中文精品无码| 国产精品无码国模私拍视频| 中文字幕精品无码久久久久久3D日动漫| AV无码免费永久在线观看| 人妻少妇AV无码一区二区| 欧美日韩国产中文高清视频| 久久久久亚洲精品无码蜜桃| 中文字幕无码乱人伦| 久久久久久久久久久久中文字幕| 国产网红无码精品视频| 亚洲日韩精品无码专区网址 | 精品无码久久久久久尤物| 亚洲伊人久久综合中文成人网 | 97碰碰碰人妻视频无码| 成人无码网WWW在线观看| 最好看最新高清中文视频| 中文字幕久精品免费视频| 亚洲AV无码成人精品区大在线| 免费看又黄又无码的网站| 无码国产精成人午夜视频一区二区| 久久久久av无码免费网| 中文字幕一区二区三区乱码| 中文字幕一二三区| 久久精品中文字幕久久| 日韩欧美群交P片內射中文| 中文字幕Av一区乱码| 佐藤遥希在线播放一二区| 无码AV大香线蕉| 亚洲AV无码一区二区一二区| 精品无码久久久久久久久久 | 人妻中文无码久热丝袜| 亚洲国产精品无码久久青草| 亚洲av午夜国产精品无码中文字| 精品无码久久久久久久久久 | 亚洲日本欧美日韩中文字幕 | 中文字幕有码无码AV| 亚洲AV成人无码久久精品老人 | 天堂无码久久综合东京热| 无码AV大香线蕉|