Data Report
Bulletin Kurils / 2002, may
Contributed by SKHL
KUR 2002, may
------------------------------------------------------------------------
| | |appa| time | T | A, micron | magnitude |
St.|km |phas|ra- | | |-----|-----|----|----------------| K
| | |ture| h min sek| s | NS | EW | Z | M mbv mbh msh|
------------------------------------------------------------------------
1 2 3 4 5 6 7 8 9 10 11 12 13 14
------------------------------------------------------------------------
1 may
45.5 + 0.22 N 149.6 + 0.19 E 0: 00-03-31 + 0.5
H = 123 + 9 km mbv(a)=4.7/11, msh=5.2/1, msh(a)=5.4/4 K = 10.5
KUR 137 iP SPZ 00 03 55.6 0.70-0.160-0.140+0.590
1.2 Pm SPZ 03 56.4 0.70 0.170 0.100 0.660 5.0
Pm MPZ 03 57.0 2 2.5
iS SP 04 14.0
Sm SP 04 19.0 0.70 8.080 4.530 6.2 10.6
Sm MP 04 19.0 2 25.0 12.0 5.2
YUK 338 eP SPZ 04 18.6
3.0 iS SP 04 53.6
Sm SP 04 58.4 0.50 1.100 0.370 6.0 10.4
Sm MP 05 10.5 1 2.3 2.5
YSS 548 iP SPZ 04 44.0 - +
4.9 Pm SPZ 04 45.0 0.70 0.020 4.3
eS SP 05 37.2
Sm SP 05 40.0 1.00 0.060 0.040 4.9
UGL 689 eP SPZ 05 00.5
6.2 Pm SPZ 05 02.2 0.70 0.050 5.1
TIV 783 eP SPZ 05 12.0
7.0 Pm SPZ 05 13.2 0.70 0.010 4.5
eS SP 06 30.2
Sm SPE 06 49.1 0.80 0.010 4.3
TEY 1015 e(P) SPZ 05 44.1
9.1 Pm SPZ 05 44.9 0.70 0.020 4.8
NKL 1061 eP SPZ 05 44.7
9.5 Pm SPZ 05 46.1 1.00 0.040 5.0
eS SP 07 29.0
EKMR1463 eP SPZ 06 30.4
13.2 Pm SPZ 06 35.8 0.60 0.004 4.3
YASR1774 eP SPZ 07 09.6
16.0 Pm SPZ 07 11.7 0.50 0.003 4.4
BMKR1784 eP SPZ 07 10.3
16.1 Pm SPZ 07 14.6 0.80 0.010 4.7
ZEA 1834 eP SPZ 07 16.8
16.5 Pm SPZ 07 17.4 1.00 0.022 0.024 0.035 5.1
KROS1881 eP SPZ 07 21.6
16.9 Pm SPZ 07 22.8 1.10 0.022 4.7
1 may
43.2 + 0.10 N 140.1 + 0.15 E 0: 05-56-27 + 1.0
H = 164 + 6 km mbv(a)=5.1/15, mbv=5.2/1, msh=5.4/4, msh(a)=5.3/7
K =10
TEY 344 eP SPZ 05 57 19.0
3.1 Pm SPZ 57 20.0 0.50 0.040 0.130 0.240 5.2
eS SP 57 58.8
Sm SP 57 59.5 0.90 0.230 0.300 5.3
Sm MP 58 01.0 2 2.0 1.0 5.4
M MP 05 59 12.0 18 0.9 1.0
YSS 467 iP SPZ 57 32.2 0.80-0.160-0.050-0.200
4.2 Pm SPZ 57 33.0 0.90 0.310 0.140 0.410 5.4
Pm MPZ 57 34.0 2 0.5 5.2
iS MP 58 21.0
Sm MP 58 24.0 3 0.9 1.0 5.3
Sm SPN 58 25.0 1.00 0.240 5.3
YUK 474 iP SPZ 57 32.0 0.50 -0.370
4.3 Pm SPZ 57 38.5 0.50 0.280 5.5
eS SP 58 21.8
Sm SP 58 25.5 0.50 0.460 0.570 6.1 10.5
Sm MP 58 29.0 3 3.0 3.7 5.6
KUR 661 eP SPZ 57 54.0
5.9 Pm SPZ 57 54.7 0.50 0.130 5.6
eS SP 59 01.5
Sm SP 59 06.5 0.70 0.140 0.060 5.5 9.4
UGL 673 iP SPZ 57 56.5 0.80 0.140
6.1 Pm SPZ 57 57.0 0.70 0.100 5.5
eS SP 59 06.0
Sm SPE 59 29.0 1.00 0.220 5.5
M MPZ 06 01 40.0 16 0.5
TIV 873 iP SPZ 05 58 21.1 -
7.9 Pm SPZ 58 23.0 0.90 0.070 4.8
eS SP 59 50.0
Sm SPE 59 57.0 0.80 0.010 4.4
GRNR 884 eP SPZ 58 22.0
8.0 Pm SPZ 58 23.0 1.00 0.260 0.170 0.250 5.3
KLR 926 iP SPZ 58 26.8 1.40+0.028-0.038+0.033
8.3 Pm SPZ 58 28.2 1.40 0.043 0.057 0.038 4.2
Sm SP 06 00 53.5 2.00 0.060 0.050 5.0
Sm MP 00 54.0 5 0.8 0.6 5.1
NKL 1106 eP SPZ 05 58 45.9
10.0 Pm SPZ 58 50.0 1.10 0.040 0.030 4.7
EKMR1216 eP SPZ 58 59.2
10.9 Pm SPZ 59 12.7 0.90 0.018 4.5
YASR1430 eP SPZ 59 23.5
12.9 Pm SPZ 59 31.0 0.50 0.010 0.007 0.019 5.0
SKR 1467 eP SPZ 59 26.9
13.2 Pm SPZ 59 34.0 0.80 0.070 0.060 0.060 5.3
ZEA 1499 iP MPZ 59 31.9 2 -0.1 -0.2
13.5 Pm SPZ 59 33.1 1.00 0.047 0.047 0.070 5.2
BMKR1514 eP SPZ 59 33.7
13.6 Pm SPZ 59 38.3 0.70 0.027 4.9
KROS1568 iP SPZ 59 40.4 0.90+0.013 +0.016
14.1 Pm SPZ 59 43.1 0.50 0.006 0.016 4.7
MA2 1958 e(P) SPZ 06 00 20.3
17.6
2 may
49.2 + 0.14 N 156.5 + 0.21 E 0: 09-06-00 + 0.7
H = 31 + 4 km(14 phase) ms = 4.1/8, mpv(a)=5.0/12 K = 11
SKR 170 iP SPZ 09 06 25.8 0.80-0.170 -0.290
1.5 Pm SPZ 06 26.7 0.50 0.700 0.150 1.240 5.3
Pm MPZ 06 28.0 1 2.4 2.8
iS SP 06 45.1
Sm MP 06 47.0 3 15.0 15.0 6.4
M MP 09 07 20.0 10 5.1 4.5 4.2 4.0
PET 452 eP SPZ 07 02.7
4.1 Pm SPZ 07 06.1 0.40 0.170 5.1
Sm SP 07 57.8 0.60 1.250 1.510 11.1
M MPN 09 08 49.0 15 0.6 0.5 3.5
KUR 786 eP SPZ 07 45.0
7.1 Pm SPZ 07 52.0 1.00 0.110 0.190 0.380 5.5
eS SP 09 04.0
Sm SP 09 16.0 1.00 0.380 0.190 0.190
YUK 993 eP SPZ 08 08.7
8.9 Pm SPZ 08 12.5 0.40 0.180 0.250 0.350 6.0
Pm MPZ 08 21.8 1 2.3
eS SP 09 47.7
Sm SP 09 50.9 0.30 0.180 0.200
M MP 09 11 31.0 19 3.6 3.1 4.7
TIV 1005 eP SPZ 08 12.9
9.0 Pm SPZ 08 14.2 0.70 0.010 4.2
sP SPZ 08 28.0
eS SP 09 52.2
Sm SPE 10 18.1 0.70 0.010
M MP 09 12 36.0 14 0.9 1.0 1.1 4.4
UGL 1046 eP SPZ 08 18.0
9.4 Pm SPZ 08 21.0 0.80 0.050 4.9
pP SPZ 08 26.4
M MP 09 12 32.0 15 0.5 1.3 1.0 4.4
YSS 1049 eP SPZ 08 19.1 -
9.4 pP SPZ 08 29.6
eS SP 10 00.5
Sm SPN 10 11.9 0.50 0.040
M MP 09 11 43.0 17 0.3 0.4 3.7
NKL 1183 eP SPZ 08 34.0
10.6 Pm SPZ 08 36.2 1.00 0.020 0.040 5.0
M MPZ 09 13 08.0 17 0.8
MA2 1212 iP MPZ 08 36.5 -
10.9 M MP 09 15 15.0 13 1.2 0.5 1.3 4.5
GRNR1442 eP SPZ 09 05.1
13.0
SEY 1545 eP SPZ 09 17.6
13.9
EKMR1692 eP SPZ 09 37.8
15.2 Pm SPZ 09 45.8 0.60 0.019 4.9
KLR 1790 e(P) SPZ 09 50.0
16.1 M MP 09 16 39.0 16 0.5 0.6 4.4
BMKR1977 eP SPZ 10 08.0
17.8 Pm SPZ 10 08.7 0.50 0.006 4.6
YASR2023 eP SPZ 10 11.5
18.2 Pm SPZ 10 18.0 0.50 0.007 4.7
ZEA 2069 eP SPZ 10 19.8
18.6 Pm SPZ 10 23.8 1.20 0.021 4.8
M MP 09 19 19.0 14 0.3 0.5
KROS2094 eP SPZ 10 19.4
18.8 Pm SPZ 10 20.0 0.40 0.004 4.5
5 may
44.2 + 0.16 N 149.4 + 0.21 E 0: 01-40-39 + 0.9
H = 43 + 4 km (24 phase) ms = 4.4/10, msh=5.3/1, mbv(a)=4.8/13 K = 10
KUR 164 iP SPZ 01 41 04.3 0.30 +0.180
1.5 Pm SPZ 41 08.7 0.50 0.470 0.500 1.410 5.3
Pm MPZ 41 08.7 2 5.0
eS SP 41 22.5
Sm MP 41 43.6 2 12.5 10.5
Sm SP 41 47.8 0.70 2.650 1.190 9.6
M MPZ 01 42 16.0 16 17.0
YUK 280 eP SPZ 41 16.7
2.5 Pm SPZ 41 18.0 0.40 0.200 0.370 5.1
Pm MPZ 41 24.2 1.2 2.5
iS SP 41 46.0
Sm MPN 41 49.5 2 5.0 5.3
Sm MPE 41 49.5 0.8 3.7
Sm SP 41 52.0 0.50 1.060 1.240 10.3
M MP 01 43 50.0 9 5.0 7.8 4.4
YSS 601 eP SPZ 42 00.5
5.4 pP SPZ 42 14.2
eS SP 42 59.1
Sm SPE 43 13.0 1.00 0.060
M MP 01 44 50.0 16 1.4 1.5 4.1
UGL 779 eP SPZ 42 24.0
7.0 Pm SPZ 42 26.5 0.70 0.040 4.7
M MP 01 45 42.0 16 2.0 2.2 2.5 4.6
SKR 883 eP SPZ 42 32.0
7.9 Pm SPZ 42 39.0 0.50 0.060 5.2
sP SP 42 51.1
eS SP 43 57.5
Sm SP 44 04.3 0.80 0.070 0.120 0.060
M MP 01 45 10.0 20 2.4 2.4 1.2 4.6
M MP 01 46 06.0 16 2.0 4.4 2.2 4.9
TIV 898 eP SPZ 42 37.0
8.1 Pm SPZ 42 38.8 0.80 0.010 4.2
M MPZ 01 46 16.0 16 2.0
TEY 1014 eP SPZ 42 51.3
9.1 pP SPZ 43 03.0 1.00 0.060
M MP 01 47 20.0 18 1.0 1.0 4.3
M MPZ 01 47 46.0 13 1.9
OKH 1151 eP SPZ 43 08.0
10.4 M MP 01 47 38.0 16 1.4 1.0 4.4
NKL 1181 eP SPZ 43 10.0
10.6 Pm SPZ 43 17.0 1.00 0.030 4.8
M MP 01 47 54.0 17 0.8 0.9 4.2
PET 1195 M MP 01 46 57.0 20 1.0 2.6 0.5 4.6
10.8
GRNR1215 e(P) SPZ 43 23.0
10.9 Pm SPZ 43 27.1 1.00 0.010 4.4
VLA 1407 M MP 01 50 30.0 16 0.6 0.5 1.0 4.2
KLR 1452 M MPZ 01 50 39.0 13 3.1
13.1
EKMR1554 eP SPZ 43 57.2
14.0 Pm SPZ 44 06.1 1.00 0.021 4.8
MA2 1714 eP MPZ 44 14.6
15.4 Pm MPZ 44 30.6 1 0.01
M MPZ 01 52 44.0 13 1.3
YASR1856 eP SPZ 44 28.2
16.7 Pm SPZ 44 36.1 0.50 0.007 4.7
BMKR1878 eP SPZ 44 35.3
16.9 Pm SPZ 44 38.1 0.70 0.027 5.1
ZEA 1918 eP SPZ 44 39.6
17.3 Pm SPZ 44 41.7 0.90 0.022 0.027 5.0
pP SPZ 44 51.9
KROS1969 eP SPZ 44 45.0
17.7 Pm SPZ 44 47.1 0.60 0.004 0.006 0.009 4.7
SEY 2091 Pm SPZ 44 51.4 1.30 0.040 5.0
18.8 M MPZ 01 53 12.0 18 4.7
5 may
48.9 + 0.15 N 147.8 + 0.31 E 0: 02-06-05 + 0.8
H = 556 + 21 km mbv(a)=4.8/12, msh=4.4/1, msh(a)=5.0/6
KUR 408 iP SPZ 02 07 26.5 0.50 -0.300
3.7 Pm SPZ 07 27.2 0.50 0.070 0.150 0.540 5.5
eS SP 08 32.0
Sm SP 08 35.0 1.00 0.180 0.200 5.1
UGL 414 eP SPZ 07 27.0
3.7 Pm SPZ 07 27.7 0.70 0.090 4.6
eS SP 08 31.8
Sm SP 08 34.0 0.90 0.080 0.160 5.0
TIV 427 iP SPZ 07 26.6 0.50 +0.050+0.100
3.8 Pm SPZ 07 27.7 0.50 0.160 5.0
eS SP 08 31.5
Sm SP 08 33.0 1.00 0.160 0.080 4.9
YSS 429 iP SPZ 07 29.0 0.60+0.030+0.050-0.060
3.9 Pm SPZ 07 30.0 0.90 0.060 0.060 4.3
iS SP 08 35.0
Sm SP 08 36.3 1.20 0.130 0.180 5.1
Sm MP 08 38.0 3 0.4 0.4 4.4
YUK 558 eP SPZ 07 37.0
5.0 Pm SPZ 07 37.3 0.30 0.180 5.3
eS SP 08 50.0
Sm SP 08 55.5 0.40 0.320 0.190 5.8
Sm MP 08 58.4 0.7 1.5
OKH 626 eP MPZ 07 40.0 +
5.6 Pm SPZ 07 41.8 0.90 0.600 5.4
NKL 684 iP SPZ 07 45.0 0.60 -0.040+0.120
6.2 Pm SPZ 07 45.6 0.60 0.040 0.140 5.0
eS SP 09 04.3
Sm SPE 09 07.0 0.80 0.020 4.3
GRNR 839 eP SPZ 08 00.0
7.6
EKMR1135 eP SPZ 08 26.2
10.2 Pm SPZ 08 26.8 0.70 0.025 4.9
MA2 1205 eP MPZ 08 30.6
10.8 Pm SPZ 08 31.3 0.60 0.004 4.3
BMKR1447 eP SPZ 08 53.3
13.0 Pm SPZ 08 55.6 0.50 0.006 4.4
YASR1460 iP SPZ 08 54.7 +
13.1 Pm SPZ 08 55.2 0.50 0.004 4.2
ZEA 1515 eP SPZ 08 58.2
13.6
KROS1553 iP SPZ 09 04.0 0.50 -0.003+0.006
14.0 Pm SPZ 09 05.1 0.40 0.005 0.011 4.7
7 may
47.7 + 0.09 N 146.1 + 0.18 E 0: 11-10-51 + 1.0
H = 456 + 13 km mbv(a)=4.5/11, msh(a)=4.9/2
YSS 265 iP SPZ 11 11 56.2 - +
2.4 Pm SPZ 11 56.9 0.80 0.100 4.5
iS SP 12 46.0
Sm SP 12 48.2 0.90 0.050 0.070 4.4
KUR 312 eP SPZ 11 58.0
2.8 Pm SPZ 11 59.4 0.60 0.080 4.6
UGL 332 eP SPZ 12 00.5
3.0 Pm SPZ 12 01.5 0.40 0.070 4.7
YUK 411 eP SPZ 12 04.5
3.7 Pm SPZ 12 05.3 0.40 0.160 5.1
eS SP 13 03.1
Sm SP 13 07.8 0.50 0.180 0.390 5.4
Sm MP 13 07.8 1 1.5 2.0
TIV 429 eP SPZ 12 06.8
3.9 Pm SPZ 12 07.1 0.90 0.050 4.2
NKL 713 iP SPZ 12 30.8 0.70 +0.020
6.4 Pm SPZ 12 31.5 0.70 0.010 0.030 4.2
GRNR 778 eP SPZ 12 39.0 +
7.0 Pm SPZ 12 39.7 0.70 0.025 4.3
EKMR1102 eP SPZ 13 09.4
9.9 Pm SPZ 13 10.0 0.50 0.004 4.2
MA2 1352 eP SPZ 13 34.1
12.2
YASR1416 eP SPZ 13 38.4
12.7 Pm SPZ 13 39.2 0.60 0.007 4.3
BMKR1424 eP SPZ 13 39.3
12.8 Pm SPZ 13 40.3 0.50 0.016 4.8
KROS1521 eP SPZ 13 49.1
13.7 Pm SPZ 13 50.3 0.60 0.004 4.2
9 may
50.9 + 0.20 N 157.6 + 0.26 E 0: 04-17-34 + 0.7
H = 44 + 3 km(23 phase) ms = 3.7/3, mbv(a)=4.9/13 K = 10.5
SKR 108 iP SPZ 04 17 51.4 0.20+0.090+0.590-1.040
1.0 Pm SPZ 17 51.8 0.70 1.860 5.1
Pm SPZ 17 51.8 0.40 0.300 0.620
Pm MPZ 17 51.8 2 2.2 4.0
iS SP 18 03.5
Sm MP 18 05.0 2 28.0 22.0
PET 251 eP SPZ 18 11.8
2.3 Pm MPZ 18 12.0 0.4 0.3
Pm SPZ 18 12.8 0.50 0.420 5.1
Sm MPE 18 42.0 0.8 1.9
Sm SP 18 43.2 0.60 2.350 2.320 10.7
M MP 04 19 01.0 18 0.6 0.6 0.7 3.1
KUR 955 eP SPZ 19 39.0
8.6 Pm SPZ 19 43.0 1.00 0.190 5.3
OKH 1046 M MP 04 23 30.0 18 0.5 0.5 0.5 4.0
9.7
TIV 1047 eP SPZ 19 50.9
9.4 Pm SPZ 19 52.9 0.60 0.010 4.3
pP SPZ 20 04.9
eS SP 21 28.8
M MPZ 04 24 16.0 16 0.5
MA2 1061 eP MPZ 19 52.5
9.6 M MPZ 04 24 22.0 20 0.3
UGL 1124 eP SPZ 20 00.5
10.1 Pm SPZ 20 02.7 0.70 0.070 5.2
M MP 04 24 28.0 17 0.5 0.5 0.5 4.1
YSS 1166 eP SPZ 20 05.0
10.5 Pm SPZ 20 07.0 1.10 0.030 4.8
pP SPZ 20 16.8
sP SPZ 20 25.2
NKL 1181 eP SPZ 20 07.0
10.6 Pm SPZ 20 09.0 1.00 0.020 4.7
GRNR1484 Pm SPZ 20 50.4 1.00 0.021 4.8
13.4
EKMR1699 eP SPZ 21 11.2
15.3 Pm SPZ 21 17.2 0.60 0.019 4.9
KLR 1845 eP SPZ 21 27.9
16.6 M MPZ 04 29 10.0 13 0.5
BMKR1966 eP SPZ 21 40.3
17.7 Pm SPZ 21 42.9 0.80 0.010 4.6
YASR2028 eP SPZ 21 46.3
18.3 Pm SPZ 21 48.3 0.50 0.010 4.8
ZEA 2069 eP SPZ 21 50.9
18.6 Pm SPZ 21 51.9 0.80 0.010 4.6
M MPZ 04 29 22.0 18 0.2
KROS2087 eP SPZ 21 51.5
18.8 Pm SPZ 21 54.7 0.50 0.011 4.9
10 may
44.4 + 0.07 N 140.6 + 0.11 E 0: 12-54-36 + 0.8
H = 255 + 9 km mbv(a)=4.3/11, msh(a)=4.4/2
TEY 320 eP SPZ 12 55 29.0
2.9 Pm SPZ 55 29.4 0.50 0.050 4.4
eS SP 56 08.0
Sm SP 56 09.0 0.80 0.040 0.030 4.3
YSS 335 iP SPZ 55 29.0 0.60+0.050+0.030+0.060
3.0 Pm SPZ 55 29.3 0.40 0.090 0.140 5.0
eS SP 56 09.0
Sm SP 56 10.0 0.90 0.070 0.080 4.6
UGL 539 eP SPZ 55 50.0
4.9 Pm SPZ 55 52.8 0.80 0.040 4.2
KUR 587 eP SPZ 55 57.5
5.3 eS SP 57 03.0
TIV 740 eP SPZ 56 13.5
6.7 Pm SPZ 56 14.1 0.60 0.010 3.9
GRNR 775 eP SPZ 56 15.9
7.0 Pm SPZ 56 16.3 0.70 0.012 4.0
KLR 860 eP SPZ 56 27.0
7.7
EKMR1115 eP SPZ 56 55.3
10.0 Pm SPZ 57 03.8 0.60 0.003 4.0
YASR1348 eP SPZ 57 20.8
12.1 Pm SPZ 57 22.2 0.60 0.003 3.8
SKR 1358 eP SPZ 57 24.5
12.2 Pm SPZ 57 26.0 0.60 0.050 5.0
ZEA 1417 eP SPZ 57 29.3
12.8 Pm SPZ 57 32.2 0.90 0.011 4.3
BMKR1422 eP SPZ 57 30.3
12.8 Pm SPZ 57 33.5 0.50 0.005 4.2
KROS1483 eP SPZ 57 36.0
13.3 Pm SPZ 57 37.0 0.50 0.003 4.1
MA2 1824 eP SPZ 58 11.6
16.4
10 may
44.3 + 0.07 N 139.9 + 0.12 E 0: 23-52-29 + 0.7
H = 232 + 9 km mbv(a)=4.2/6, msh(a)=4.3/2
TEY 272 eP SPZ 23 53 16.4
2.5 eS SP 53 52.0
Sm SP 53 52.5 0.60 0.020 0.020 0.020 4.2
YSS 368 iP SPZ 53 25.0 +
3.3 Pm SPZ 53 26.0 1.00 0.070 0.150 4.6
eS SP 54 08.0
Sm SP 54 11.0 0.90 0.050 0.050 4.4
UGL 557 eP SPZ 53 45.4
5.0 Pm SPZ 53 46.0 0.70 0.050 4.4
TYV 757 eP SPZ 54 08.9
6.8 Pm SPZ 54 11.0 0.50 0.010 4.0
KLR 826 eP SPZ 54 16.2
7.4
EKMR1097 eP SPZ 54 49.2
9.9
YASR1321 eP SPZ 55 11.3
11.9 Pm SPZ 55 13.3 0.50 0.001 3.5
ZEA 1390 eP SPZ 55 18.2
12.5 Pm SPZ 55 19.6 1.20 0.021 4.5
BMKR1400 eP SPZ 55 20.9
12.6 Pm SPZ 55 24.2 0.70 0.006 4.2
MA2 1845 eP SPZ 56 09.9
16.6
15 may
51.5 + 0.27 N 153.0 + 0.28 E 0: 06-48-53 + 0.9
H = 399 + 19 km mbv(a)=4.5/10, msh(a)=4.7/2
SKR 235 eP SPZ 06 49 51.8
2.1 Pm SPZ 49 52.4 0.50 0.050 4.3
eS SP 50 38.1
Sm SPE 50 47.0 0.50 0.080 4.7
PET 423 eP SPZ 50 07.8
3.8 eS SP 51 00.8
Sm SPE 51 05.8 0.70 0.100 4.8
OKH 721 eP MPZ 50 32.0
6.5
TIV 721 eP SPZ 50 34.5
6.5 Pm SPZ 50 34.9 0.90 0.040 4.3
NKL 853 iP SPZ 50 46.0 0.50 -0.020+0.030
7.7 Pm SPZ 50 46.6 0.50 0.020 0.040 4.7
YSS 893 eP SPZ 50 52.0
8.0 Pm SPZ 50 53.0 0.60 0.020 4.4
GRNR1155 eP SPZ 51 17.0
10.4 Pm SPZ 51 18.6 0.40 0.020 5.1
EKMR1370 eP SPZ 51 38.9
12.3 Pm SPZ 51 39.5 0.50 0.004 4.0
TEY 1401 eP SPZ 51 44.1
12.6 Pm SPZ 51 46.2 0.70 0.020 4.7
BMKR1641 eP SPZ 52 04.7
14.8 Pm SPZ 52 06.3 0.60 0.007 4.5
YASR1699 eP SPZ 52 07.9
15.3 Pm SPZ 52 11.1 0.50 0.003 4.3
KROS1761 iP SPZ 52 16.1 0.30 -0.001+0.003
15.9 Pm SPZ 52 16.7 0.50 0.003 4.3
19 may
42.4 + 0.09 N 137.1 + 0.12 E 0: 18-48-35 + 1.0
H = 307 + 9 km mbv(a)=4.3/4, msh(a)=4.3/1
TEY 296 eP SPZ 18 49 29.0
2.7
YSS 676 eP SPZ 50 05.5
6.1 eS SP 51 16.0
Sm SPE 51 20.0 1.00 0.030 4.3
EKMR1225 eP SPZ 51 04.5
11.0
YASR1385 eP SPZ 51 25.4
12.5 Pm SPZ 51 26.8 0.60 0.003 4.1
ZEA 1453 eP SPZ 51 31.4
13.1 Pm SPZ 51 33.7 0.80 0.020 4.6
BMKR1493 eP SPZ 51 35.4
13.4 Pm SPZ 51 37.3 0.60 0.006 4.3
KROS1527 eP SPZ 51 39.4
13.7 Pm SPZ 51 41.4 0.50 0.003 4.1
MA2 2125 eP SPZ 52 36.7
19.1
19 may
48.3 + 0.09 N 146.3 + 0.13 E 0: 20-09-51 + 1.0
H = 522 + 24 km mbv(a)=4.5/8, msh(a)=4.2/4
YSS 303 eP SPZ 20 11 00.0
2.7 Pm SPZ 11 01.7 0.40 0.110 4.9
eS SP 11 55.3
Sm SPN 11 57.3 0.80 0.030 4.1
UGL 317 eP SPZ 11 01.5
2.8 Pm SPZ 11 02.0 0.40 0. 50 5.0
eS SP 11 59.4
Sm SPN 12 02.0 0.70 0.060 4.4
KUR 369 eP SPZ 11 03.0
3.3 e(S) SP 12 00.5
Sm SPN 12 07.5 1.00 0.110 4.5
TIV 383 iP SPZ 11 06.0 +
3.4 Pm SPZ 11 06.2 0.80 0.040 4.2
eS SP 12 05.3
Sm SPN 12 08.5 0.80 0.010 3.6
NKL 662 iP SPZ 11 27.2 +
6.0 Pm SPZ 11 27.9 0.50 0.020 4.2
EKMR1073 eP SPZ 12 05.1
9.7 Pm SPZ 12 05.6 0.50 0.016 4.5
BMKR1391 eP SPZ 12 34.4
12.5 Pm SPZ 12 35.3 0.60 0.007 4.3
YASR1392 iP SPZ 12 34.2 -
12.5 Pm SPZ 12 35.1 0.50 0.010 4.5
KROS1492 iP SPZ 12 44.6 0.60 +0.003-0.003
13.4 Pm SPZ 12 45.7 0.50 0.003 0.006 4.4
20 may
52.6 + 0.11 N 152.8 + 0.17 E 0: 18-44-48 + 0.8
H = 510 + 23 km mbv(a)=4.6/13, msh(a)=4.8/6
PAU 301 iP SPZ 18 45 57.6
2.7
SKR 312 eP SPZ 45 56.5
2.8 Pm SPZ 45 57.5 0.70 0.050 0.080 4.5
eS SP 46 51.4
Sm SP 47 02.0 0.70 0.100 0.050 0.080 4.7
PET 399 iP SPZ 46 03.8 -
3.6 Pm SPZ 46 05.4 0.70 0.060 0.040 0.120 4.7
eS SP 47 03.7
Sm SPE 47 05.1 1.40 0.100 4.4
Sm SPN 47 07.2 0.70 0.090 4.7
M MP 18 47 15.5 14 0.1 0.1
TYV 719 eP SPZ 46 31.1
6.5 Pm SPZ 46 32.0 0.80 0.030 4.2
eS SP 47 52.2
Sm SPE 47 56.2 1.30 0.050 4.6
MA2 788 eP SPZ 46 36.7
7.1
NKL 809 iP SPZ 46 39.0 -
7.3 Pm SPZ 46 39.7 0.60 0.020 4.3
UGL 840 eP SPZ 46 42.9 +
7.6 Pm SPZ 46 43.2 0.80 0.060 4.7
KUR 891 eP SPZ 46 45.2 +
8.0 Pm SPZ 46 46.0 1.00 0.190 5.2
eS SP 48 18.3
Sm SP 48 28.2 0.80 0.090 0.050 5.3
YSS 949 iP SPZ 46 51.2 + + -
8.5 Pm SPZ 46 52.0 0.60 0.020 0.010 0.030 4.7
eS SP 48 29.5
Sm SPN 48 32.0 1.20 0.040 5.0
YUK 1076 eP SPZ 47 01.5
9.7
GRNR1141 eP SPZ 47 09.8
10.3 Pm SPZ 47 10.8 0.80 0.030 0.050 5.1
EKMR1327 eP SPZ 47 28.2
11.9 Pm SPZ 47 28.8 0.60 0.010 4.2
TEY 1443 eP SPZ 47 39.5
13.0 Pm SPZ 47 40.2 0.80 0.020 4.6
KLR 1512 eP SPZ 47 45.7
13.6
BMKR1585 eP SPZ 47 52.0
14.3
YASR1653 eP SPZ 47 57.1
14.9 Pm SPZ 47 57.9 0.50 0.007 4.6
ZEA 1692 eP SPZ 48 00.5
15.2 Pm SPZ 48 02.1 0.90 0.011 4.6
KROS1706 iP SPZ 48 03.2 1.00 +0.018-0.020
15.4 Pm SPZ 48 04.0 0.70 0.014 0.018 5.0
21 may
44.4 + 0.16 N 146.8 + 0.18 E 0: 20-04-16 + 0.5
H = 148 + 7 km (19 phase) ms = 5.0/8, mbv=6.1/10
mbh=6.1/8, msh=5.7/10, mbv(a)=5.7/17, msh(a)=6.5/6
Felt at III Yuzhno-Kurilsk
YUK 84 iP SPZ 20 04 38.6 0.50+0.170-0.810+6.200
0.8 Pm MPZ 04 44.3 8 277.0
Pm MPZ 04 44.3 1.5 75.0 95.0
iS SP 04 55.6
KUR 125 iP SPZ 04 43.2 0.50 -0.170
1.1 Pm SPZ 04 47.0 0.70 1.550 1.370 6.110 5.8
Pm MPZ 04 47.0 1 7.0 6.0 15.0
iS SP 05 03.0
Sm MP 05 04.0 2 115.0 117.0 5.8
YSS 418 iP SPZ 05 13.8 1.00-0.580+0.810-0.870
3.8 Pm SPZ 05 15.0 0.80 1.070 0.590 2.280 6.1
Pm MPZ 05 17.0 3 4.8 5.0 5.7 6.2 6.3
iS MP 05 57.0
Sm MP 06 01.0 4 41.2 51.5 6.7
Sm SP 06 02.0 2.00 12.30 6.6
M MPZ 20 06 37.0 9 6.8
UGL 628 iP MPZ 05 39.0 3 +2.5 -2.0 +4.1
5.7 Pm MPZ 05 40.0 3.5 2.3 2.0 3.6 6.0 6.0
Pm SPZ 05 41.0 0.70 0.100 0.140 0.310 5.6
iS SP 06 43.5
Sm SP 06 46.5 2.00 12.50 7.800 7.0
Sm MP 06 48.0 5.5 33.0 42.0 22.0 7.0
TIV 778 iP SPZ 05 56.5 1.80+0.810+0.170+0.270
7.0 Pm SPZ 05 58.0 1.00 0.510 6.0
Pm MPZ 05 58.0 3.5 4.2 2.1 5.1 6.3 6.2
eS MP 07 14.0
Sm MPE 07 31.0 9 19.2 7.0
Sm MPN 07 31.0 4 4.1 6.7
Sm SP 07 43.3 1.90 3.200 1.300 6.5
M MP 20 09 36.0 8 3.0 3.9 4.0 5.2
TEY 803 iP SPZ 06 01.0 +
7.2 Pm MPZ 06 02.0 3 6.0 5.3 6.4 6.4
Pm SPZ 06 02.5 1.30 0.230 2.550 1.910 6.4
iS MP 07 20.0
Sm MP 07 25.0 5 6.0 1.8 6.8
M MP 20 08 56.0 10 2.0 3.8 5.4 5.0
SKR 985 eP SPZ 06 20.3
8.9 Pm SPZ 06 22.5 0.70 0.040 0.160 5.4
Pm MPZ 06 31.0 4 1.5 1.5 2.0 6.1 6.1
eS SP 07 57.0
Sm SP 08 04.0 0.40 0.320 0.320 0.160 6.3
Sm MP 08 14.0 8 2.0 3.1 2.3 6.1
M MP 20 08 42.0 17 4.6 4.4 2.0 4.9
GRNR1044 eP SPZ 06 28.0
9.4 Pm SPZ 06 30.2 1.00 0.210 0.170 0.180 5.7
eS SP 08 12.8
Sm SP 08 14.1 1.40 0.400 0.400 0.110 5.7
OKH 1058 iP MPZ 06 28.4 +
9.5 Pm MPZ 06 30.0 6 3.5 4.4 7.5 6.4 6.3
Pm SPZ 06 31.1 1.10 0.900 6.4
eS MP 08 10.0
Sm SP 08 22.4 6.50 4.000 6.400 6.2
Sm MP 08 56.0 10 11.6 4.3 7.2
M MP 20 10 40.0 8 12.7 5.9 3.9 5.4
NKL 1064 iP MPZ 06 30.0 2.5 +4.0 -2.4 +5.0
9.6 Pm SPZ 06 32.0 1.20 0.420 0.920 6.3
Pm MPZ 06 33.0 3 3.2 2.0 5.0 6.6 6.4
eS MP 08 16.0
Sm MPN 08 23.0 13 4.8 6.7
M MP 20 12 37.0 10 1.4 2.0 2.0 4.9
VLA 1199 iP MPZ 06 45.0 3.6 -1.8 +1.2
10.8 Pm MPZ 06 47.0 3 1.4 1.0 6.0
sP MPZ 07 19.0
iS MP 08 41.0
Sm MP 08 48.0 5 0.5 0.8 1.0 7.9
M MP 20 11 00.0 16 1.5 2.0 2.0 4.6
KLR 1256 iP MPZ 06 54.5 +
11.3 Pm SPZ 06 57.2 1.60 0.040 0.120 0.080 5.0
iS MP 09 00.0
M MP 20 11 35.0 13 3.5 2.0 5.1
PET 1289 iP MPZ 06 55.7 +
11.6 Pm SPZ 07 04.4 0.60 0.110 5.6
Pm MPZ 07 12.5 6 1.7 5.9
eS SP 09 01.4
Sm SP 09 25.0 0.70 0.110 0.110
M MPZ 20 10 43.0 19 1.2
EKMR1390 iP SPZ 07 09.6 1.40 +0.170
12.5 Pm SPZ 07 11.6 1.30 0.270 5.8
sP SPZ 07 48.7
YASR1680 eP SPZ 07 41.4 +
15.1 Pm SPZ 07 46.6 0.50 0.007 0.019 0.026 5.2
MA2 1704 iP MPZ 07 44.2 +
15.3 Pm MPZ 07 46.9 1 0.1
M MPZ 20 15 35.5 18 8.0
BMKR1714 eP SPZ 07 45.3
15.4 Pm SPZ 07 50.6 0.60 0.042 0.060 0.089 5.7
ZEA 1745 iP MPZ 07 49.8 4 +1.4
15.7 Pm SPZ 07 51.1 1.40 0.150 0.130 0.200 5.8
Pm MPZ 07 52.0 4 0.6 0.8 0.8 5.8 5.9
iS MP 10 42.0
Sm MP 10 46.0 6 4.2 3.5 1.0
M MP 20 14 40.0 9 1.9 1.5 1.7 5.2
KROS1799 eP SPZ 07 55.5
16.2 Pm SPZ 07 59.0 1.00 0.052 0.081 0.120 5.7
SEY 2084 i(P) SPZ 08 23.1
18.8 Pm SPZ 08 24.9 0.60 0.050 4.9
eS MP 11 44.5
26 may
52.3 + 0.17 N 152.8 + 0.26 E 0: 17-24-55 + 1.0
H = 505 + 22 km mbv(a)=4.4/10, msh(a)=4.7/2
SKR 289 iP SPZ 17 26 02.8 +
2.6 Pm SPZ 26 03.3 0.50 0.050 4.4
eS SP 26 57.1
Sm SP 27 18.5 0.20 0.110 0.040 5.3
PET 406 eP SPZ 26 11.9
3.7 Pm SPZ 26 12.2 1.00 0.030 4.0
eS SP 27 12.3
Sm SPE 27 13.2 1.40 0.050 4.1
OKH 677 eP SPZ 26 34.0
6.1 Pm SPZ 26 35.0 0.70 0.060 4.5
TYV 714 eP SPZ 26 37.9
6.4
YSS 928 eP SPZ 26 57.6
8.4 Pm SPZ 26 58.0 0.70 0.020 4.4
GRNR1140 eP SPZ 27 17.1 +
10.3 Pm SPZ 27 17.8 0.60 0.007 4.4
EKMR1335 eP SPZ 27 35.7
12.0 Pm SPZ 27 36.2 0.50 0.007 4.2
BMKR1597 eP SPZ 28 00.5
14.4 Pm SPZ 28 01.5 0.50 0.004 4.3
YASR1662 eP SPZ 28 04.6
15.0 Pm SPZ 28 05.4 0.50 0.003 4.3
ZEA 1702 eP SPZ 28 08.9
15.3 Pm SPZ 28 10.9 1.00 0.012 4.6
KROS1718 eP SPZ 28 11.5
15.5 Pm SPZ 28 12.0 0.50 0.006 4.7
28 may
47.6 + 0.18 N 154.3 + 0.24 E 0: 01-20-39 + 1.0
H = 45 + 5 km ms = 4.1/2, mbv=5.5/1, msh=5.3/1
mbv(a)=5.2/14 K = 11
SKR 364 eP SPZ 01 21 28.5
3.3 Pm SPZ 21 30.2 0.50 0.240 0.120 0.500 5.3
Pm MPZ 21 31.0 1 2.0 1.8
iS SP 22 04.7
Sm MP 22 12.0 2 2.5 3.0 5.3
Sm SP 22 14.5 0.50 1.020 1.600 0.660 10.8
M MP 01 22 57.0 12 2.6 2.6 1.2 4.1
PAU 467 iP SPZ 21 41.9
4.2
KUR 557 iP SPZ 21 55.4 0.40 0.070
5.0 Pm SPZ 21 59.0 0.50 0.240 0.270 0.840 5.9
iS SP 22 52.0
Sm MP 22 56.0 1 5.0 8.0
Sm SP 22 57.5 0.80 1.290 1.830 11.3
PET 674 eP SPZ 22 08.2
6.1 Pm MPZ 22 14.6 2 0.5 5.5
Pm SPZ 22 15.7 1.30 0.300 5.1
Pm SPZ 22 16.4 1.00 0.300 0.170
eS SP 23 13.8
Sm MPE 23 34.0 2 1.0
Sm SPZ 23 37.1 0.70 0.700 10.7
M MPZ 01 24 15.0 22 0.4
YUK 763 iP SPZ 22 19.0 0.40 -0.210
6.9 Pm SPZ 22 24.1 0.30 0.280 0.340 0.690 6.2
Pm MPZ 22 34.0 1 1.0 1.0
eS SP 23 35.0
Sm MP 23 44.8 1 1.5 1.5
Sm SP 23 48.5 0.50 0.470 0.730
YSS 869 iP SPZ 22 34.4 -
7.8 Pm SPZ 22 35.6 0.70 0.050 0.090 5.2
iS SP 23 59.5
Sm SP 24 04.0 0.70 0.070 0.120
M MPZ 01 25 55.0 13 0.4
UGL 912 eP SPZ 22 40.0
8.2 Pm SPZ 22 43.0 1.00 0.220 5.4
eS SP 24 09.2
Sm SPE 24 16.8 0.70 0.090
M MP 01 25 56.0 22 0.6 1.0 0.6 4.1
TIV 914 eP SPZ 22 39.9
8.2 Pm SPZ 22 40.8 0.90 0.030 4.6
eS SP 24 05.4
Sm SPN 24 15.5 0.70 0.020
M MPZ 01 26 22.0 16 0.8
OKH 1039 eP SPZ 22 56.0
9.4 Pm SPZ 23 05.5 0.40 0.090 5.4
e(S) SP 24 31.0
Sm SPN 24 36.8 0.50 0.200
NKL 1136 eP SPZ 23 03.8
10.2 Pm SPZ 23 07.4 1.10 0.040 0.110 5.2
eS SP 24 52.5
Sm SPE 24 59.0 0.80 0.050
M MPZ 01 29 25.0 14 0.4
GRNR1338 eP SPZ 23 32.0
12.0
MA2 1346 eP MPZ 23 30.8
12.1 M MPZ 01 30 10.0 13 0.8
EKMR1621 eP SPZ 24 08.5
14.6 Pm SPZ 24 10.0 1.30 0.027 4.7
KLR 1663 M MPZ 01 30 35.5 14 0.5
15.0
SEY 1701 eP SPZ 24 15.3
15.3
BMKR1924 eP SPZ 24 41.3
17.3 Pm SPZ 24 45.5 0.70 0.011 4.7
YASR1950 eP SPZ 24 41.9
17.5 Pm SPZ 24 45.1 0.50 0.003 0.016 0.026 5.3
ZEA 2002 eP SPZ 24 48.1
18.0 Pm SPZ 24 50.5 1.00 0.029 5.0
KROS2035 eP SPZ 24 51.6
18.3 Pm SPZ 24 58.5 0.60 0.004 0.011 4.8
28 may
49.0 + 0.13 N 156.5 + 0.15 E 0: 21-29-50 + 0.6
H = 54 + 6 km ms = 3.8/3, mbv(a)=4.8/10 K = 10
SKR 193 iP SPZ 21 30 17.4 0.60 +0.140
1.7 Pm MPZ 30 19.0 2.5 0.9 0.9 1.1
Pm SPZ 30 20.0 0.50 0.350 0.280 0.660 5.0
iS SP 30 38.0
Sm SP 30 42.5 0.50 1.310 1.620 0.570 9.9
Sm MP 30 44.0 3 2.1 3.7 1.7
M MP 21 31 08.0 12 3.3 4.2 2.7 3.9
PAU 283 iP SPZ 30 29.3
2.5
PET 475 eP SPZ 30 54.8
4.3 Pm SPZ 30 58.0 0.60 0.070 4.6
e(S) SP 31 44.9
Sm SPE 31 54.7 0.60 0.350 9.7
M MP 21 32 57.5 14 0.2 0.2 3.1
KUR 771 eP SPZ 31 31.0
6.9 Pm SPZ 31 34.1 0.60 0.150 5.3
eS SP 32 47.0
Sm SPN 32 54.1 0.50 0.090
YUK 978 eP SPZ 31 54.1
8.8 Pm SPZ 31 54.8 0.40 0.120 5.5
eS SP 33 29.0
Sm SP 34 08.0 0.30 0.110 0.160
Sm MPE 34 11.8 1 0.8
M MPZ 21 35 28.0 16 1.4
TYV 1009 eP SPZ 32 02.0
9.1 Pm SPZ 32 03.8 0.70 0.010 4.2
eS SP 33 40.0
YSS 1043 eP SPZ 32 04.5
9.4 eS SP 33 47.0
Sm SPN 33 56.2 0.60 0.020
M MPZ 21 35 48.0 14 0.2
UGL 1046 eP SPZ 32 07.0
9.4
OKH 1074 M MP 21 38 04.0 10 0.5 1.1 0.5 4.5
9.7
NKL 1192 eP SPZ 32 23.0
10.7 Pm SPZ 32 25.0 0.60 0.040 5.2
MA2 1235 eP SPZ 32 27.2
11.1
TEY 1563 eP SPZ 33 11.3
14.1
SEY 1569 eP SPZ 33 10.4
14.1
EKMR1699 eP SPZ 33 26.3
15.3 Pm SPZ 33 33.7 0.60 0.008 4.5
KLR 1791 M MPZ 21 40 34.0 14 0.5
16.1
BMKR1986 eP SPZ 33 56.3
17.9 Pm SPZ 33 58.4 0.60 0.006 4.5
YASR2030 eP SPZ 34 00.1
18.3 Pm SPZ 34 04.9 0.50 0.003 4.3
KROS2103 eP SPZ 34 08.0
18.9 Pm SPZ 34 11.5 0.50 0.003 4.3
29 may
44.7 + 0.13 N 150.4 + 0.17 E 0: 06-35-11 + 1.0
H = 43 + 4 km (19 phase) ms = 4.6/10, mbv=5.6/2, mbv(a)=5.1/14 K = 12
KUR 203 iP SPZ 06 35 41.1 0.90+0.080-0.170+0.400
1.8 Pm SPZ 35 42.2 0.90 0.300 0.250 0.850 5.0
Pm MPZ 35 44.0 2 3.5
iS SP 36 03.2
Sm MP 36 19.0 2 13.0 30.0
Sm SP 36 20.0 0.55 7.200 6.600 11.3
YUK 363 eP SPZ 36 00.5
3.3 Pm MPZ 36 07.0 1 1.1 1.6 3.0
Pm SPZ 36 10.5 0.40 0.480 0.850 5.7
eS SP 36 38.2
Sm SP 36 54.0 0.40 3.000 6.200 12.2
Sm MP 36 54.0 0.6 4.5 10.6
M MPZ 06 37 25.0 15 5.5
YSS 642 iP SPZ 36 36.0 - +
5.8 Pm SPZ 36 39.0 0.70 0.060 4.7
pP MPZ 36 51.0
eS SP 37 41.0
Sm SPN 37 46.8 0.90 0.110
M MP 06 38 54.0 17 1.1 3.6 4.4 4.6
SKR 795 eP SPZ 36 53.9
7.2 Pm SPZ 36 57.5 0.50 0.070 0.080 5.1
pP SPZ 37 06.5
eS SP 38 14.9
Sm SP 38 44.5 0.70 0.220 0.240 0.050
M MP 06 39 16.0 20 2.9 4.4 1.0 4.8
UGL 798 iP SPZ 36 57.8 0.80 +0.130
7.2 Pm SPZ 36 59.0 0.40 0.130 5.5
Sm SP 38 27.0 0.60 0.140 0.210
M MP 06 40 04.0 15 2.2 2.0 3.4 4.6
TIV 897 eP SPZ 37 09.0
8.1 pP SPZ 37 22.2
M MP 06 40 24.0 16 1.2 2.5 2.9 4.7
PAU 898 iP SPZ 37 08.1
8.1
TEY 1083 eP SPZ 37 34.4
9.7 Pm SPZ 37 37.3 0.80 0.030 4.7
pP SPZ 37 46.6
M MP 06 41 47.0 14 1.1 1.4 1.9 4.5
PET 1108 e SPZ 37 45.6
10.0 Pm SPZ 37 57.9 0.50 0.020 4.8
M MPN 06 42 40.0 12 1.4 4.5
OKH 1133 eP MPZ 37 37.6
10.2 Pm MPZ 37 38.0 2 0.5 5.7
pP SPZ 37 45.0
M MP 06 44 14.0 12 1.3 2.0 1.0 4.8
NKL 1175 eP SPZ 37 42.0
10.6 Pm SPZ 37 45.0 1.00 0.090 5.3
M MP 06 43 22.0 14 0.8 1.0 1.0 4.4
GRNR1240 eP SPZ 37 52.2
11.2 Pm SPZ 37 53.4 0.70 0.048 5.3
KLR 1496 Pm MPZ 38 36.5 9 0.6 5.4
13.5 M MP 06 43 50.0 18 1.0 1.5 4.7
EKMR1573 eP SPZ 38 32.0
14.2 Pm SPZ 38 36.0 1.50 0.080 5.2
YASR1882 eP SPZ 39 06.1
16.9 Pm SPZ 39 10.2 0.70 0.002 0.008 0.023 5.1
BMKR1895 eP SPZ 39 08.3
17.1 Pm SPZ 39 11.7 0.50 0.027 5.3
ZEA 1943 eP SPZ 39 12.4
17.5 Pm SPZ 39 18.6 1.00 0.024 0.035 0.035 5.1
M MP 06 46 32.0 15 1.1 1.2 4.7
KROS1991 eP SPZ 39 18.9
17.9 Pm SPZ 39 20.6 0.50 0.008 0.012 0.019 5.1
SEY 2032 e(P) SPZ 39 20.9
18.3 eS MP 42 48.7