Data Report
Bulletin Kurils / 2002, august
Contributed by SKHL
KUR 2002, august
------------------------------------------------------------------------
| | |appa| time | T | A, micron | magnitude |
St.|km |phas|ra- | | |----------------|----------------| K
| | |ture| h min sek| s | NS | EW | Z | M mbv mbh msh|
------------------------------------------------------------------------
1 2 3 4 5 6 7 8 9 10 11 12 13 14
------------------------------------------------------------------------
3 august
43.7 + 0.14 N 147.7 + 0.23 E 0: 02-23-57 + 0.8
H = 64 + 6 km (15 phase) ms = 4.3/6, msh = 5.1/3, mbv(a) = 5.3/17
Felt (III) at Yuzhno-Kurilsk
YUK 149 iP SPZ 02 24 19.0 0.30-0.530+0.760-7.200
1.3 Pm SPZ 24 19.6 0.30 1.400 3.600 15.60 6.5
Pm MPZ 24 20.0 1 10.0 33.0 45.0
iS MP 24 34.4
Sm MP 24 36.8 1 85.0 160.0
KUR 170 iP SPZ 24 22.8 0.40+0.330+0.130+0.750
1.5 Pm MPZ 24 23.6 1 10.0 17.5
Pm SPZ 24 24.2 0.80 1.870 2.320 7.410 5.8
eS SP 24 41.5
Sm MPN 24 44.0 2 67.5 5.8
YSS 527 iP SPZ 25 07.6 0.70-0.060+0.060-0.100
4.7 Pm SPZ 25 08.2 0.90 0.180 0.150 0.290 5.1
eS MP 25 58.5
Sm SPE 26 04.0 1.00 0.550
Sm MPE 26 04.5 4 1.2 4.9
M MP 02 27 02.0 15 0.8 1.6 1.8 4.1
UGL 736 eP SPZ 25 33.8 +
6.6 Pm SPZ 25 35.8 0.80 0.130 5.1
eS SP 26 48.0
Sm SP 26 56.5 0.70 0.560 0.500
TYV 880 eP SPZ 25 52.5
7.9 Pm SPZ 25 53.9 0.90 0.060 4.9
eS SP 27 19.3
Sm SPE 27 21.9 0.70 0.080
M MPE 02 29 08.0 15 1.4 1.5 4.4
TEY 891 eP SPZ 25 55.0
8.0 Pm SPZ 25 57.5 0.80 0.030 4.7
eS SP 27 20.0
Sm SP 27 29.0 1.00 0.050 0.040
M MP 02 28 39.0 18 1.0 0.9 1.0 4.3
SKR 1002 eP SPZ 26 04.3
9.0 Pm SPZ 26 06.5 0.50 0.080 0.050 0.150 5.5
eS SP 27 41.5
Sm SP 27 49.4 0.60 0.200 0.240 0.110
M MPZ 02 29 26.0 16 2.8
PAU 1102 iP SPZ 26 16.1
9.9
GRNR1153 iP SPZ 26 26.2 +
10.4 Pm SPZ 26 30.5 0.60 0.019 4.8
NKL 1167 eP SPZ 26 25.0
10.5 Pm SPZ 26 37.0 1.20 0.160 5.5
eS SP 28 20.5
M MP 02 30 44.0 17 0.5 0.8 1.0 4.2
PET 1311 eP SPZ 26 45.2
11.8 Pm SPZ 26 51.5 1.90 0.060 4.9
eS SP 28 47.4
Sm SP 28 56.0 0.70 0.080 0.080
EKMR1499 iP SPZ 27 07.0 +
13.5 Pm SPZ 27 08.3 0.90 0.050 5.2
MA2 1775 eP SPZ 27 37.8
16.0 Pm SPZ 27 42.0 0.80 0.070 5.4
e(S) MP 30 32.0
M MPE 02 35 08.0 14 1.0 4.6
YASR1789 eP SPZ 27 40.1 -
16.1 Pm SPZ 27 58.0 0.50 0.003 0.010 0.010 4.8
BMKR1823 eP SPZ 27 43.3
16.4 Pm SPZ 27 45.3 0.80 0.030 5.1
ZEA 1854 eP SPZ 27 47.5 +
16.7 Pm SPZ 27 49.1 0.70 0.020 0.040 5.3
Sm MPN 31 18.0 8 0.2 4.7
M MP 02 34 50.0 16 0.4 0.4 0.6 4.3
KROS1908 eP SPZ 27 53.5
17.2 Pm SPZ 27 55.0 0.70 0.010 0.010 0.020 5.0
SEY 2154 e(P) SPZ 28 18.6
19.4 Pm SPZ 28 22.2 0.70 0.160 0.050 0.300 6.2
4 august
48.2 + 0.16 N 153.4 + 0.21 E 0: 07-54-22 + 1.2
H = 141 + 6 km ms = 4.1/2, mbv(a) = 5.1/13, mbv = 5.5/1, mbh = 5.7 (1),
msh = 5.4/1, msh(a) = 5.6/6 K = 10.5
SKR 335 iP SPZ 07 55 09.6 0.90+0.300 +0.490
3.0 Pm SPZ 55 10.5 0.70 0.240 0.150 0.840 5.5
Pm MPZ 55 10.5 3 2.0 2.0 2.2 5.5 5.7
iS SP 55 45.5
Sm SP 55 52.6 0.40 1.240 1.440 0.540 6.2 10.9
Sm MP 56 10.0 4 2.2 3.8 5.4
M MP 07 56 40.0 9 1.2 1.8 1.2 3.9
KUR 536 iP SPZ 55 34.5 +
4.8 Pm MPZ 55 35.0 1.5 2.5
Pm SPZ 55 40.0 0.70 0.110 0.130 0.280 5.4
eS SP 56 30.0
Sm SP 56 40.0 0.60 0.330 0.230 5.9 10.0
PET 647 eP SPZ 55 47.0
5.8 Pm SPZ 56 02.3 0.80 0.070 5.1
eS SP 56 50.8
Sm SP 56 55.5 0.60 0.220 0.250 5.9 10.1
YUK 744 iP SPZ 55 58.0 0.40 -0.400
6.7 Pm MPZ 55 58.7 1 1.0
Pm SPZ 55 59.0 0.50 0.140 0.230 0.820 6.6
eS SP 57 11.0
Sm SP 57 25.0 0.50 0.180 0.390 6.2
YSS 809 iP SPZ 56 08.0 - +
7.3 Pm SPZ 56 09.8 1.00 0.050 4.9
eS SP 57 25.5
Sm SPN 57 33.0 1.70 0.110 5.1
M MPZ 07 59 32.0 16 0.3
TYV 826 eP SPZ 56 10.0
7.4 Pm SPZ 56 11.0 1.20 0.100 5.0
eS SP 57 32.1
Sm SPE 57 41.0 0.90 0.010 4.3
UGL 834 eP SPZ 56 12.0
7.5 Pm SPZ 56 13.8 0.80 0.060 5.0
M MP 07 58 05.0 7 0.5 0.6 0.9 4.3
NKL 1044 eP SPZ 56 34.0
9.4
GRNR1254 eP SPZ 57 01.7
11.3
TEY 1327 eP SPZ 57 08.0
11.9 Pm SPZ 57 15.1 0.60 0.020 4.9
EKMR1532 eP SPZ 57 33.5
13.8 Pm SPZ 57 34.9 0.90 0.030 4.9
BMKR1833 eP SPZ 58 05.7
16.5 Pm SPZ 58 06.3 0.40 0.010 5.0
YASR1861 eP SPZ 58 08.3
16.8 Pm SPZ 58 10.6 0.50 0.003 0.010 0.020 5.0
ZEA 1913 eP SPZ 58 14.2
17.2 Pm SPZ 58 18.1 1.20 0.030 4.6
KROS1945 eP SPZ 58 16.7
17.5 Pm SPZ 58 19.4 0.50 0.010 4.3
4 august
42.3 + 0.10 N 145.2 + 0.18 E 0: 10-20-16 + 0.9
H = 45 + 5 km mbv(a) = 4.3/4 K = 10.5
YUK 198 eP SPZ 10 20 43.4
1.8 Pm SPZ 20 45.7 0.40 0.220 0.180 0.490 5.0
Pm MPZ 20 49.0 1 1.2
iS SP 21 03.5
Sm SP 21 05.0 0.70 1.400 4.750 10.4
Sm MP 21 05.1 1.5 4.4 6.8
TEY 754 eP SPZ 21 58.6
6.8
EKMR1502 eP SPZ 23 28.4
13.5 Pm SPZ 23 30.5 0.90 0.003 4.0
YASR1763 eP SPZ 24 00.0
15.9 Pm SPZ 24 02.2 0.70 0.003 4.1
BMKR1820 eP SPZ 24 04.3
16.4 Pm SPZ 24 13.0 0.50 0.003 4.3
4 august
44.4 + 0.04 N 142.5 + 0.07 E 0: 16-41-34 + 0.7
H = 233 + 6 km mbv(a) = 4.4/12, msh(a) = 4.7/4
YUK 271 eP SPZ 16 42 20.8
2.4 Pm MPZ 42 21.8 1 1.3
Pm SPZ 42 22.0 0.60 0.190 0.200 0.300 5.1
eS SP 42 54.4
Sm SPE 43 18.0 0.50 0.100 4.8
YSS 281 iP SPZ 42 21.0 0.50 0.020 +0.050
2.5 Pm SPZ 42 21.9 0.70 0.050 4.3
eS SP 42 56.0
Sm SP 42 59.0 1.10 0.060 0.140 4.6
KUR 432 eP SPZ 42 37.5
3.9 Pm SPZ 42 38.0 0.70 0.090 4.6
eS SP 43 26.0
Sm SPN 43 27.3 1.00 0.150 4.8
TEY 471 eP SPZ 42 42.2
4.2 Pm SPZ 42 43.2 0.80 0.030 4.0
eS SP 43 33.8
Sm SPE 43 36.0 1.00 0.040 4.4
UGL 519 eP SPZ 42 46.0
4.7 Pm SPZ 42 46.7 0.80 0.050 4.2
TYV 715 eP SPZ 43 07.9
6.4 Pm SPZ 43 10.0 0.90 0.030 4.1
M MPZ 16 55 50.0 18 1.0
GRNR 837 eP SPZ 43 22.0
7.5
EKMR1186 eP SPZ 44 02.7
10.7 Pm SPZ 44 03.7 0.50 0.004 4.3
SKR 1230 eP SPZ 44 07.2
11.1 Pm SPZ 44 08.5 0.50 0.040 5.0
YASR1443 eP SPZ 44 29.7
13.0 Pm SPZ 44 34.5 0.30 0.005 4.5
BMKR1502 eP SPZ 44 37.0
13.5 Pm SPZ 44 44.5 0.70 0.002 3.8
ZEA 1510 eP SPZ 44 40.3
13.6 Pm SPZ 44 41.4 0.90 0.020 4.7
KROS1572 eP SPZ 44 46.4
14.2 Pm SPZ 44 47.9 0.50 0.003 4.1
4 august
43.0 + 0.07 N 144.9 + 0.13 E 0: 21-07-40 + 0.9
H = 71 + 5 km mbv(a) = 4.7/7, msh = 5.1/1 K = 10.5
YUK 134 eP SPZ 21 08 00.5
1.2 Pm SPZ 08 02.0 0.30 2.300 2.100 4.800 5.9
Pm MPZ 08 02.0 0.5 2.3 2.3 5.1
iS SP 08 15.2
Sm MP 08 16.0 1 30.0 37.5
Sm SP 08 16.2 0.50 22.60 24.80 11.4
KUR 340 eP SPZ 08 26.8
3.1 Pm SPZ 08 28.8 0.50 0.090 0.110 0.340 5.1
eS SP 09 01.0
Sm MPN 09 11.0 2 2.5 5.1
Sm SP 09 11.5 0.70 0.860 0.690 10.0
YSS 470 iP SPZ 08 43.0 + +
4.2 Pm SPZ 08 44.0 0.30 0.030 4.5
eS SP 09 30.1
Sm SPE 09 57.5 0.70 0.040
TEY 702 eP SPZ 09 13.5
6.3 Pm SPZ 09 15.0 0.90 0.030 4.3
TYV 889 eP SPZ 09 35.0
8.0 Pm SPZ 09 36.5 0.60 0.020 4.6
SKR 1199 eP SPZ 10 13.7
10.8
EKMR1425 eP SPZ 10 42.0
12.8 Pm SPZ 10 44.5 0.60 0.004 4.3
YASR1690 eP SPZ 11 12.8
15.2 Pm SPZ 11 17.9 0.80 0.003 4.0
BMKR1744 eP SPZ 11 15.5
15.7
KROS1818 eP SPZ 11 27.6
16.4
7 august
47.8 + 0.18 N 155.4 + 0.22 E 0: 09-52-27 + 0.9
H = 43 + 5 km ms = 4.1/7, mbv = 5.1/1, mbh = 5.3/1
msh = 5.2/1, mbv(a) = 4.9/12 K = 10.5
SKR 322 iP SPZ 09 53 11.1 0.40 +0.080
2.9 Pm SPZ 53 12.1 0.60 0.070 0.070 0.080 4.4
Pm MPZ 53 14.0 3 0.8 0.6 0.6 5.1 5.3
iS SP 53 45.1
Sm SP 53 47.5 0.30 1.010 1.980 0.230 11.2
Sm MP 53 48.0 2 2.3 1.7 5.2
M MP 09 54 52.0 14 1.6 4.3 1.5 4.1
PAU 421 eP SPZ 53 23.8
3.8 eS SPZ 54 06.6
PET 621 iP SPZ 53 48.9 + + +
5.6 Pm SPZ 53 49.5 0.80 0.040 0.070 4.7
iS SP 54 50.6
Sm SP 54 52.5 0.80 0.410 0.450 10.4
Sm MPE 54 52.6 1 0.5
M MP 09 56 48.0 12 0.7 0.7 0.5 4.1
KUR 645 eP SPZ 53 51.8
5.8 Pm SPZ 53 52.4 0.80 0.130 0.150 0.770 5.7
eS SP 54 55.5
Sm SP 54 59.8 0.70 0.360 0.600 10.6
YUK 850 iP SPZ 54 16.0 0.50 0.370
7.7 Pm SPZ 54 21.5 0.50 0.370 5.9
iS SP 55 38.7
Sm SP 55 45.0 0.50 0.380 0.230
Sm MPE 55 46.0 1 2.0
M MPZ 09 57 31.0 17 2.9
YSS 957 eP SPZ 54 34.0
8.6 Pm SPZ 54 34.8 0.90 0.030 4.6
iS SP 56 07.0
Sm SP 56 09.0 0.80 0.050 0.070
M MPE 09 58 26.0 16 0.4 0.5 3.8
TYV 983 eP SPZ 54 35.9
8.8 Pm SPZ 54 38.0 0.80 0.030 4.6
eS SP 56 11.5
M MPZ 09 59 08.0 15 0.6 0.8 0.8 4.2
UGL 992 eP SPZ 54 39.0
8.9 Pm SPZ 54 40.5 0.50 0.040 4.9
M MP 09 57 50.0 17 1.0 0.8 0.7 4.3
NKL 1194 eP SPZ 55 00.5
10.7 M MPE 10 00 32.0 18 0.8 0.8 4.1
MA2 1341 eP SPZ 55 18.9
12.1
GRNR1412 eP SPZ 55 30.5
12.7
EKMR1687 eP SPZ 56 02.7
15.2 Pm SPZ 56 07.5 0.90 0.020 4.7
SEY 1687 eP SPZ 56 00.2
15.2
KLR 1743 eP SPZ 56 09.3
15.7 M MP 10 03 57.5 11 0.4 0.5 0.6 4.4
BMKR1986 eP SPZ 56 35.3
17.9 Pm SPZ 56 36.3 0.70 0.020 5.0
YASR2017 eP SPZ 56 37.8
12.2 Pm SPZ 56 41.0 0.80 0.030 5.1
ZEA 2068 eP SPZ 56 42.4
18.6 Pm SPZ 56 44.1 1.00 0.020 4.8
KROS2099 eP SPZ 56 45.7
18.9 Pm SPZ 56 50.1 0.60 0.010 0.010 4.8
17 august
46.2 + 0.18 N 153.4 + 0.21 E 0: 14-02-53 + 0.9
H = 27 + 5 km ms = 4.2/2 mbv(a) = 4.6/10 K = 10.0
KUR 442 iP SPZ 14 03 53.7 0.60 +0.150
4.0 Pm SPZ 03 56.0 0.60 0.110 0.080 0.300 5.1
iS SP 04 40.3
Sm SP 04 45.2 0.80 0.540 0.650 10.1
SKR 532 eP SPZ 04 04.1
4.8 Pm SPZ 04 07.0 0.50 0.030 0.030 0.040 4.5
eS SP 04 57.3
Sm SP 05 05.3 0.60 0.080 0.090 0.030 9.0
M MP 14 06 30.0 14 1.1 1.5 1.1 4.2
YUK 639 eP SPZ 04 17.0
5.7 Pm SPZ 04 22.0 0.50 0.220 5.4
eS SP 05 22.1
Sm SP 05 30.2 0.50 0.340 0.380 10.6
Sm MPE 05 39.1 1 2.5
YSS 815 eP SPZ 04 42.8
7.3 Pm SPZ 04 45.4 0.70 0.020 4.4
eS SP 06 03.6
Sm SP 06 10.0 0.90 0.030 0.020
M MPZ 14 09 39.0 17 0.4
UGL 902 eP SPZ 04 52.0
8.1 Pm SPZ 04 53.5 0.70 0.050 4.7
M MP 14 10 30.0 12 0.4 0.4 0.4 4.1
TYV 940 eP SPZ 04 55.9
8.5 Pm SPZ 04 58.0 0.80 0.010 4.2
eS SP 06 31.0
M MPZ 14 08 53.0 14 0.9
NKL 1188 eP SPZ 05 27.0
10.7
GRNR1343 eP SPZ 05 44.5
12.1 Pm SPZ 05 46.3 0.80 0.010 4.5
MA2 1492 eP SPZ 06 03.3
13.4
EKMR1647 eP SPZ 06 27.7
14.8 Pm SPZ 06 31.7 0.70 0.004 4.2
BMKR1960 eP SPZ 07 00.5
17.6 Pm SPZ 07 02.4 0.70 0.005 4.4
ZEA 2027 eP SPZ 07 06.3
18.2
KROS2066 eP SPZ 07 09.8
18.6 Pm SPZ 07 16.5 0.50 0.003 4.3
18 august
44.0 + 0.11 N 145.2 + 0.07 E 0: 05-24-36 + 0.6
H = 142 + 9 km mbv(a) = 4.7/7 msh(a) = 5.2/3
YUK 49 iP SPZ 05 24 56.4 0.30 -0.800
0.4 Pm MPZ 24 57 1 4.5
Pm SPZ 24 58.3 0.30 0.740 0.460 1.980 5.5
iS MP 25 12.1
Sm MP 25 13.0 1 5.0 20.0
Sm SP 25 13.5 0.50 1.930 5.520 6.0
KUR 246 eP SPZ 25 14.0
2.2 Pm SPZ 25 14.5 0.80 0.190 4.6
eS SP 25 44.0
Sm SP 25 45.0 1.00 0.380 0.570 5.2
YSS 377 iP SPZ 25 28.2
3.4 Pm SPZ 25 29.2 1.00 0.070 4.4
eS SP 26 07.8
Sm SP 26 12.0 1.00 0.030 0.050 4.4
UGL 611 eP SPZ 25 56.0
5.5 Pm SPZ 25 57.0 0.70 0.060 4.8
TYV 782 eP SPZ 26 16.0
7.0 Pm SPZ 26 17.0 0.80 0.010 4.1
SKR 1099 eP SPZ 26 54.5
9.9 Pm SPZ 26 58.5 0.40 0.030 5.2
Pm SPZ 26 58.5 0.90 0.090 0.090
KLR 1177 eP SPZ 27 06.1
10.6
EKMR1347 eP SPZ 27 22.9
12.1 Pm SPZ 27 24.8 1.10 0.010 4.4
PET 1398 eP SPZ 27 28.7
12.6
20 august
50.3 + 0.21 N 156.9 + 0.23 E 0: 05-43-22 + 0.8
H = 66 + 5 km ms = 4.0/1 mbv = 6.2/1 mbv(a) = 5.1/10 K = 11.5
Felt (III) at Severo-Kurilsk
SKR 67 iP SPZ 05 43 34.9 0.40-4.940+6.720-10.130
0.6 Pm MPZ 43 35.6 1 10.0 19.2 39.0
iS MP 43 44.0
Sm MP 43 45.0 1 79.0 66.0
PAU 129 iP SPZ 43 43.4
1.2 eS SP 43 57.8
PET 322 iP SPZ 44 08.2 +
2.9 Pm MPZ 44 09.5 1 0.3
Pm SPZ 44 11.0 0.60 0.520 5.2
i(S) SP 44 42.2
Sm MPE 44 45.1 1 4.8
Sm SPE 44 45.4 0.60 5.560 11.5
M MPZ 05 45 21.0 6 1.3
KUR 879 iP SPZ 45 18.2 1.00 +0.230
7.9 Pm SPZ 45 21.2 1.00 0.190 0.150 0.570 5.8
Pm MPZ 45 28.0 2 1.8 6.2
eS SP 46 41.0
Sm SP 47 01.2 1.00 0.190 0.190
TYV 1003 eP SPZ 45 34.1
9.0
OKH 1022 eP SPZ 45 34.5
9.2
UGL 1069 eP SPZ 45 42.0
9.6 Pm SPZ 45 43.9 0.70 0.050 5.0
M MPZ 05 49 52.0 14 0.3 0.4 0.4 4.0
YUK 1086 eP SPZ 45 39.5
9.8 Pm SPZ 45 41.9 0.40 0.250 5.9
MA2 1097 eP SPZ 45 43.1
9.9
YSS 1101 eP SPZ 45 45.0
9.9 Pm SPZ 45 48.8 1.10 0.040 4.7
eS SP 47 32.2
M MPZ 05 49 28.0 18 0.3
NKL 1152 eP SPZ 45 48.2
10.4
GRNR1441 eP SPZ 46 26.8
13.0 Pm SPZ 46 28.2 1.00 0.034 5.0
EKMR1668 eP SPZ 46 54.8
15.0 Pm SPZ 46 58.2 0.70 0.018 4.8
KLR 1799 eP SPZ 47 08.7
16.2
BMKR1942 eP SPZ 47 23.7
17.5 Pm SPZ 47 24.5 0.50 0.006 4.6
ZEA 2041 eP SPZ 47 33.3
18.4 Pm SPZ 47 36.1 1.40 0.056 5.1
M MPZ 05 55 40.0 16 0.3
KROS2062 eP SPZ 47 34.5
18.6 Pm SPZ 47 36.0 0.70 0.008 4.6
21 august
46.9 + 0.20 N 153.1 + 0.23 E 0: 23-15-00 + 0.9
H = 60 + 4 km (39 phase) ms = 4.5/7 mbv = 6.3/4 mbh = 6.2/2
msh = 5.3/4 mbv(a) = 5.6/14 K = 11.5
KUR 446 eP SPZ 23 16 01.2
4.0 Pm MPZ 16 03.0 2 6.3 6.5
Pm SPZ 16 04.2 0.50 0.530 0.240 1.600 5.9
iS MP 16 46.4
Sm MP 16 54.0 2 11.5 10.0 6.0
Sm SP 16 55.0 0.60 3.800 2.360 11.8
SKR 471 eP SPZ 16 02.7
4.2 Pm SPZ 16 03.9 0.40 0.310 0.450 0.620 5.6
Pm MPZ 16 05.0 1 2.5
iS SP 16 47.4
Sm MP 16 55.0 2 4.5 3.3 5.7
Sm SP 16 57.1 0.40 0.710 1.730 0.660 11.5
YUK 651 eP SPZ 16 25.9
5.9 Pm SPZ 16 29.6 0.30 0.720 6.1
eS SP 17 30.1
Sm SP 17 40.9 0.60 1.500 2.040 11.9
PET 784 eP SPZ 16 41.6
7.1 Pm SPZ 16 48.8 0.90 0.320 5.4
eS SP 17 57.3
Sm SPN 18 23.6 0.80 0.750
M MPN 23 21 20.0 15 0.4 0.4 4.0
YSS 787 eP MPZ 16 44.0
7.1 eS MP 18 02.0
M MPZ 23 19 26.0 15 1.2
UGL 855 eP SPZ 16 54.7 +
7.7 Pm SPZ 16 56.0 0.90 0.250 5.5
eS SP 18 16.3
Sm SP 18 22.0 0.60 0.410 0.290
M MP 23 19 33.0 19 4.0 3.3 2.0 4.8
TYV 881 eP SPZ 16 55.6 +
7.9 Pm SPZ 16 58.0 1.00 0.370 5.6
Pm MPZ 16 58.0 2 1.2 1.1 6.0 6.1
eS SP 18 22.4
Sm SPE 18 26.3 0.80 0.160
M MPZ 23 20 18.0 16 1.6 1.8 2.1 4.5
OKH 1039 iP MPZ 17 14.2 -
9.4 Pm MPZ 17 15.6 2 2.6 6.4
eS SP 18 54.0
M MPE 23 23 10.0 15 1.8 2.0 4.5
NKL 1122 iP MPZ 17 24.0 2 -1.2 +2.0 -2.0
10.1 Pm MPZ 17 25.5 2 0.9 1.2 1.7 6.2 6.2
Pm SPZ 17 26.2 1.20 0.350 0.470 0.700 6.0
eS SP 19 12.0
Sm MPE 19 27.0 7 0.4 4.8
M MP 23 21 22.0 19 1.2 2.3 2.3 4.6
TEY 1291 eP SPZ 17 47.0
11.6
GRNR1292 iP SPZ 17 49.4 +0.050
11.6 Pm SPZ 17 50.6 0.90 0.070 0.170 0.200 5.8
MA2 1415 iP SPZ 17 58.2 +
12.7 M MPE 23 22 31.0 21 1.0 4.3
EKMR1589 iP SPZ 18 22.0 - +
14.3 Pm SPZ 18 30.0 0.80 0.060 5.3
KLR 1603 eP MPZ 18 26.0
14.4 Pm SPZ 18 32.7 1.00 0.020 4.8
eS MP 21 19.0
M MPZ 23 26 21.0 12 0.9
SEY 1777 eP SPZ 18 41.5
16.0 Pm SPZ 18 46.4 1.30 0.130 0.230 5.7
BMKR1899 eP SPZ 18 56.3
17.1 Pm SPZ 19 01.5 0.70 0.040 5.3
ZEA 1970 eP SPZ 19 04.0
17.7 Pm MPZ 19 07.0 5 0.5 0.6
Pm SPZ 19 08.3 1.20 0.060 0.060 5.2
eS MP 22 22.0
Sm MP 22 26.0 10 0.4 0.3 0.4 4.8
M MPE 23 26 24.0 16 0.8 1.0 4.7
KROS2007 iP SPZ 19 07.6 1.00 0.020
18.1 Pm SPZ 19 11.2 1.00 0.050 0.160 5.7
24 august
43.1 + 0.13 N 146.2 + 0.18 E 0: 18-40-53 + 0.7
H = 40 + 4 km (33 phase) ms = 6.0/10 mbv = 6.4/10
mbh = 6.2/9 msh = 6.3/10 mbv(a) = 5.8/16
YUK 104 iP MPZ 18 41 09.9 2 -140.0 +35.0-140.0
0.9 iS SP 41 21.8
KUR 272 iP SPZ 41 32.0 0.50 - -0.170
2.4 Pm SPZ 41 37.5 0.50 1.140 1.290 5.930 6.2
Pm MPZ 41 52.0 4 60.0 47.5 93.8 6.9 6.8
eS MP 42 00.5
Sm MP 42 23.0 4 112.5 137.5 6.5
YSS 505 iP SPZ 42 01.2 1.00-0.250+0.190-0.200
4.5 Pm SPZ 42 02.4 0.80 0.180 0.190 0.330 5.2
Pm MPZ 42 06.0 4 7.6 4.0 6.3 6.2 6.3
sP MPZ 42 16.2
eS SP 42 53.2
Sm SP 42 57.9 0.90 2.180 2.820
M MPN 18 44 12.0 14 152.5 72.6 6.1
UGL 736 iP MPZ 42 30.0 6 -1.8
6.6 Pm SPZ 42 33.5 0.80 0.240 5.3
Pm MPE 42 44.0 4 5.0 4.3 6.5 6.5 5.8
sP SPZ 42 44.3
eS MP 43 42.0
Sm SP 43 52.5 0.80 0.690 0.470 0.740
Sm MP 44 04.0 6 46.0 16.0 48.0 6.5
M MP 18 45 16.0 19 72.0 56.0 76.0 5.9
TEY 794 eP SPZ 42 40.0 +
7.1 Pm SPZ 42 44.0 1.00 0.160 0.480 0.490 5.6
sP SPZ 42 57.5
e(S) SP 44 00.5
Sm SPN 44 13.5 1.00 0.380
TYV 902 eP SPZ 42 51.5
8.1 Pm SPZ 42 58.0 1.00 0.480 5.8
Pm MPZ 42 58.0 4 2.5 1.0 3.0 6.2 5.9
pP SPZ 43 04.2
eS SP 44 19.0
Sm MP 44 40.0 6 9.5 6.1 6.4 6.1
M MPN 18 46 18.0 18 48.5 75.7 5.8
GRNR1126 iP SPZ 43 19.4 -
10.1 Pm SPZ 43 22.1 1.00 0.190 0.250 0.210 5.5
pP SPZ 43 31.7
sP SPZ 43 36.8
Sm SPE 45 30.1 1.00 0.250
SKR 1127 eP SPZ 43 16.5
10.1 Pm SPZ 43 22.0 0.50 0.070 0.080 0.230 5.9
Pm MPZ 43 25.0 3 1.2 1.0 1.9 6.1 6.0
pP SPZ 43 28.0
sP SPZ 43 35.9
eS CKM 45 08.0
Sm MP 45 09.5 11 5.6 9.3 5.3 6.0
Sm SP 45 29.4 1.00 0.510 1.120 0.160
M MP 18 48 36.0 15 16.3 42.4 28.6 5.9
VLA 1158 iP MPZ 43 25.0 +
10.4 Pm MPZ 43 32.0 6 1.6 4.0 4.5 6.2 6.2
pP MPZ 43 36.0
Sm MP 45 32.0 8 8.6 6.0 6.1
M MPE 18 48 40.0 12 20.0 5.7
NKL 1186 eP SPZ 43 24.0
10.7 Pm SPZ 43 27.2 1.00 0.130 5.5
Pm MPZ 43 31.0 3 2.0 1.0 2.3 6.3 6.2
sP SPZ 43 40.0
Sm MP 45 42.0 9 4.0 5.5 5.9
M MP 18 47 56.0 16 30.0 14.0 56.0 5.8
OKH 1192 iP SPZ 43 27.0 +
10.7 Pm MPZ 43 32.0 3 2.5 1.5 6.0 6.7 6.4
Pm SPZ 43 34.6 1.00 1.100 6.4
eS SP 45 21.0
Sm MP 45 42.0 5 7.4 14.1 6.5
M MP 18 48 19.8 17 78.7 50.8 61.3 6.2
PAU 1226 iP SPZ 43 28.4 -
11.0 pP SPZ 43 39.5
KLR 1299 iP SPZ 43 42.8 +
11.7 Pm SPZ 43 44.1 2.40 0.280 5.5
Pm MPZ 43 49.5 6 4.2 6.3
pP SPZ 43 53.7
eS MP 45 57.0
Sm MP 46 16.5 15 9.5 5.9 6.0
M MPZ 18 49 00.0 12 13.3
PET 1434 eP SPZ 43 56.5
12.9 Pm SPZ 44 10.1 0.60 0.160 5.9
Pm MPZ 44 17.5 6 1.7 2.7 6.3 6.1
M MPN 18 48 09.0 18 38.7 12.0 6.0
M MPZ 18 48 14.0 22 40.2
EKMR1476 iP SPZ 44 02.0 -
13.3 Pm SPZ 44 07.6 1.60 0.750 0.300 0.940 6.2
pP SPZ 44 14.4
BMKR1797 eP SPZ 44 39.3 +
16.2 Pm SPZ 44 48.3 0.80 0.097 5.6
pP SPZ 44 51.4
ZEA 1817 eP SPZ 44 41.9
16.4 Pm SPZ 44 48.0 1.40 0.260 0.200 0.450 6.0
Pm MPZ 44 49.0 7 2.0 2.5 3.4
pP SPZ 44 53.9
sP SPZ 44 59.1
eS MP 47 46.0
Sm MP 48 00.0 12 7.7 4.5 6.2
M MPN 18 51 40.0 16 54.0 78.0 6.3
MA2 1855 eP MPZ 44 46.5
16.7 Pm MPZ 45 03.0 3 2.6
eS MP 47 51.9
Sm MPE 48 19.0 22 166.0 7.1
M MP 18 53 44.0 17 73.0 96.0 102.0 6.6
KROS1876 eP SPZ 44 49.7 1.00 -0.018+0.020
16.9 Pm SPZ 44 53.0 0.60 0.030 5.2
pP SPZ 44 59.5
SEY 2235 Pm SPZ 45 32.3 0.80 0.280 0.080 0.420 6.3
20.1 eS SP 49 06.6
25 august
51.8 + 0.15 N 152.5 + 0.17 E 0: 17-12-00 + 0.6
H = 413 + 9 km msh = 4.8/4 mbv(a) = 5.1/15 msh(a) = 5.6/6
SKR 275 eP SPZ 17 13 01.2
2.5 Pm SPZ 13 02.1 0.60 0.110 0.080 0.170 4.8
eS SP 13 48.4
Sm MP 13 50.0 3 1.8 1.6 5.0
Sm SP 13 58.3 0.30 0.330 0.510 5.8
PAU 295 iP SPZ 13 02.6
2.7
PET 437 iP SPZ 13 13.0 -
3.9 Pm SPZ 13 15.4 0.50 0.450 5.4
eS MP 14 12.1
Sm SPN 14 21.2 0.60 0.280 5.4
TYV 692 iP SPZ 13 38.4 0.70 +0.060
6.2 Pm SPZ 13 39.0 0.80 0.140 4.8
eS SP 14 57.3
UGL 795 iP SPZ 13 49.0 0.40 +0.080
7.2 Pm SPZ 13 49.5 0.60 0.110 0.100 0.180 5.2
e(S) MP 15 17.0
Sm MPE 15 20.0 8 0.6 1.5 4.7
KUR 803 eP SPZ 13 45.8
7.2 Pm SPZ 13 47.7 0.50 0.100 0.300 5.5
eS SP 15 11.0
Sm SP 15 22.0 0.70 0.140 0.170 5.4
NKL 814 eP SPZ 13 49.0
7.3 Pm SPZ 13 50.0 0.70 0.040 4.5
eS SP 15 17.4
Sm SPE 15 21.0 1.20 0.180 5.0
Sm MPE 15 21.5 2 1.0 5.1
MA2 874 eP SPZ 13 55.6
7.9
YSS 886 iP SPZ 13 56.5 0.80-0.040-0.050+0.090
8.0 Pm SPZ 13 57.4 0.90 0.080 0.120 5.0
eS SP 15 30.0
Sm SP 15 34.6 1.20 0.090 0.230 5.4
Sm MPN 15 34.6 4 0.6 4.4
YUK 993 iP SPZ 14 05.0 0.4 +0.290
8.9 Pm MPZ 14 05.7 1 0.9
Pm SPZ 14 06.2 0.40 0.140 0.200 0.740 6.0
eS SP 15 42.9
Sm MP 15 47.7 1 2.5 1.8
Sm SP 15 53.3 0.60 1.270 0.620 6.6
GRNR1124 eP SPZ 14 20.8
10.1 Pm SPZ 14 21.8 0.70 0.016 0.046 0.056 5.2
SEY 1237 iP SPZ 14 33.2
11.1 eS SP 16 37.1
EKMR1332 eP SPZ 14 41.2
12.0 Pm SPZ 14 42.1 0.60 0.003 4.2
TEY 1389 eP SPZ 14 49.0
12.5 Pm SPZ 14 50.0 0.50 0.070 0.120 0.140 5.6
KLR 1491 iP SPZ 14 57.4
13.4 Pm SPZ 14 58.2 1.20 0.024 4.6
eS SP 17 24.3
Sm SP 17 25.4 1.20 0.012 0.012
BMKR1601 iP SPZ 15 07.7 0.90+0.016-0.028+0.028
14.4 Pm SPZ 15 08.7 0.80 0.030 0.050 0.081 5.4
ZEA 1702 eP SPZ 15 16.6
15.3 Pm SPZ 15 17.6 1.00 0.022 0.035 0.046 5.3
eS MPZ 18 00.5
KROS1721 iP SPZ 15 18.9 0.80 -0.014-0.022
15.5 Pm SPZ 15 20.5 0.50 0.006 0.018 0.023 5.2
28 august
43.3 + 0.13 N 140.4 + 0.20 E 0: 07-43-57.0 + 0.6
H = 171 + 7 km ms = 4.3/2 mbv(a) = 5.1/15 mbv = 5.5/1
msh = 5.6/2 msh(a) = 5.7/5 K = 10
TEY 356 eP SPZ 07 44 51.0
3.2 Pm SPZ 44 52.0 1.00 0.730 5.4
eS SP 45 32.0
Sm SPN 45 33.5 1.00 0.260 5.0
YSS 446 iP SPZ 44 59.7 0.40+0.250+0.060+0.280
4.0 Pm SPZ 45 00.0 0.90 0.540 0.180 0.650 5.6
iS SP 45 45.2
Sm SP 45 48.0 0.80 0.590 0.480 5.8
Sm MP 45 48.0 1 1.0 1.1
YUK 449 iP SPZ 44 58.9 0.50 +0.330
4.0 Pm SPZ 44 59.5 0.50 0.140 0.950 6.0
Pm MPZ 45 05.0 2 2.0 2.5 2.5
iS MP 45 45.8
Sm MP 45 53.0 2 7.0 1.5 6.1
Sm SP 45 56.0 0.50 1.200 0.270 6.3 10.7
KUR 634 iP SPZ 45 20.0 0.90 +0.140
5.7 Pm SPZ 45 21.0 0.70 0.380 5.8
eS SP 46 25.0
Sm SP 46 42.0 0.60 0.150 0.100 5.6 9.6
UGL 657 eP SPZ 45 23.6
5.9 Pm SPZ 45 25.0 0.80 0.060 5.0
eS SP 46 29.0
Sm MP 46 34.0 5 0.7 1.2 0.5 5.1
Sm SPE 46 39.3 0.90 0.230 5.6
M MP 07 47 44.0 7 0.4 0.6 0.4 4.3
VLA 686 eS MP 46 38.0
6.2
TYV 857 eP SPZ 45 49.0
7.7 Pm SPZ 45 50.0 0.80 0.050 4.8
eS MP 47 15.0
GRNR 880 eP SPZ 45 51.4
7.9 Pm SPZ 45 52.2 0.60 0.170 0.085 0.084 5.1
KLR 932 iP SPZ 45 57.2
8.4 Pm SPZ 45 58.7 1.20 0.480 0.068 0.040 4.3
NKL 1093 eP SPZ 46 13.0
9.8 Pm SPZ 46 15.0 0.70 0.020 4.8
OKH 1160 M MPE 07 48 30.0 15 0.9 4.3
10.4
EKMR1214 eP SPZ 46 29.0
10.9 Pm SPZ 46 36.5 0.80 0.012 4.4
SKR 1441 eP SPZ 46 53.8
13.0 Pm SPZ 46 56.9 0.50 0.040 0.030 0.080 5.7
e(S) SP 49 12.6
ZEA 1503 iP MPZ 47 02.3 2 -0.2
13.5 Pm MPZ 47 03.0 2 0.2 5.5
Pm SPZ 47 03.5 1.00 0.076 0.065 0.140 5.5
BMKR1515 eP SPZ 47 04.0
13.6 Pm SPZ 47 08.7 0.70 0.041 5.1
PAU 1528 iP SPZ 47 04.4
13.8
KROS1571 iP SPZ 47 10.5 0.80-0.009+0.004-0.005
14.1 Pm SPZ 47 11.1 0.60 0.006 0.007 0.010 4.5
PET 1723 e(P) SPZ 47 23.8
15.5
MA2 1939 eP SPZ 47 50.6
17.5 Pm SPZ 47 51.3 0.80 0.030 4.6
29 august
42.0 + 0.14 N 142.2 + 0.25 E 0: 09-04-08 + 0.8
H = 67 + 5 km (21 phase) ms = 4.0/5 mbv = 6.4/1 msh = 5.6/2
mbv(a) = 4.9/13 K = 12
YUK 378 iP SPZ 09 04 58.4 0.80 +0.960
3.4 Pm MPZ 04 59.7 1 2.0 3.0 2.5
Pm SPZ 04 59.7 0.50 0.410 0.470 2.350 6.0
iS MP 05 35.0
Sm MP 05 38.6 1 15.0 15.0
Sm SP 05 46.0 0.50 12.00 6.950 12.6
YSS 562 eP SPZ 05 22.9 1.10 0.080 +0.070
5.1 Pm SPZ 05 24.3 1.00 0.150 0.100 4.7
eS MP 06 20.0
Sm SP 06 23.8 1.30 0.220 0.170
M MPN 09 08 43.0 11 0.5 0.5 3.8
TEY 570 eP SPZ 05 25.0
5.1 Pm SPZ 05 26.8 0.80 0.060 4.6
KUR 585 iP SPZ 05 25.0 0.70 +0.100
5.3 Pm MPZ 05 34.0 2 2.8 6.4
Pm SPZ 05 34.5 0.70 0.390 0.310 0.690 5.7
eS SP 06 23.0
Sm MP 06 42.0 2 4.3 5.0 6.0
Sm SP 06 42.0 0.60 1.140 1.140 11.3
UGL 798 eP SPZ 05 51.0
7.2 Pm SPZ 05 53.5 1.00 0.060 4.7
M MP 09 09 05.0 20 0.8 0.6 1.0 4.0
TYV 995 eP SPZ 06 16.5
9.0 Pm SPZ 06 18.0 1.00 0.050 4.7
GRNR1077 eP SPZ 06 29.0 -
9.7 Pm SPZ 06 30.4 1.00 0.070 0.050 4.8
KLR 1148 eP SPZ 06 38.1
10.3 Pm SPZ 06 39.8 1.50 0.015 4.3
M MPE 09 10 52.0 13 0.4 4.0
NKL 1253 eP SPZ 06 47.5
11.3 Pm SPZ 06 52.0 1.00 0.110 5.5
OKH 1301 M MPN 09 13 38.0 16 0.6 4.1
11.7
EKMR1419 eP SPZ 07 10.7
12.8 Pm SPZ 07 13.3 0.90 0.014 4.6
SKR 1439 eP SPZ 07 09.0
13.0 eS SP 09 25.5
Sm SP 09 31.1 0.50 0.040 0.040 0.030
Sm MPN 09 59.0 10 1.0 5.1
M MPZ 09 13 21.0 16 0.9
ZEA 1716 eP SPZ 07 43.8
15.4 Pm SPZ 07 45.0 1.00 0.029 4.9
M MPN 09 15 13.0 10 0.4 0.3 4.3
BMKR1724 eP SPZ 07 46.6
15.5 Pm SPZ 07 49.3 0.70 0.015 4.8
PET 1737 M MPZ 09 16 54.0 15 0.2
15.6
KROS1783 eP SPZ 07 48.0
16.0 Pm SPZ 07 51.0 0.60 0.003 4.2
29 august
43.0 + 0.13 N 145.8 + 0.33 E 0: 23-41-00 + 0.9
H = 47 + 5 km ms = 4.1/2 mbv(a) = 4.7/9 K = 11
YUK 117 iP SPZ 23 41 16.6 0.70 -0.240
1.1 Pm SPZ 41 20.0 0.30 0.860 1.060 3.490 5.6
Pm MPZ 41 20.0 1 5.2
iS MP 41 29.0
Sm MP 41 30.8 1 40.0 35.0
Sm SP 41 31.0 0.50 18.14 19.69 11.3
KUR 300 iP SPZ 41 41.0 0.30 -0.140
2.7 Pm SPZ 41 43.8 0.30 0.180 0.180 0.450 5.4
iS SP 42 09.8
Sm MP 42 14.0 1 2.5 2.5
Sm SP 42 14.6 0.50 0.680 1.360 10.4
YSS 505 iP SPZ 42 09.0 -
4.5 Pm SPZ 42 10.0 0.80 0.050 0.050 0.060 4.4
iS SP 42 59.0
Sm SPE 43 01.5 1.00 0.060
M MPN 23 44 09.0 16 0.9 1.0 3.8
UGL 739 eP SPZ 42 39.0
6.7 Pm SPZ 42 40.5 0.50 0.060 4.9
TYV 910 eP SPZ 43 00.5
8.2 Pm SPZ 43 03.2 0.90 0.020 4.4
GRNR1121 eP SPZ 43 27.3
10.1
NKL 1193 eP SPZ 43 33.0
10.7
OKH 1203 M MP 23 48 25.0 15 1.0 1.0 1.0 4.5
10.8
KLR 1286 e(P) SPZ 43 50.3
11.6 M MPZ 23 49 10.0 15 0.4
PET 1463 M MP 23 51 20.0 18 0.1 0.2 0.1
13.2
EKMR1471 eP SPZ 44 10.4
13.2 Pm SPZ 44 13.5 0.80 0.010 4.6
BMKR1792 eP SPZ 44 48.3
16.1 Pm SPZ 44 50.8 0.70 0.006 4.4
ZEA 1809 e(P) SPZ 44 51.0
16.3 Pm SPZ 44 57.1 1.40 0.028 4.8
M MPZ 23 51 37.0 14 0.5
KROS1869 eP SPZ 44 57.1 +
16.8 Pm SPZ 45 03.5 0.60 0.003 4.2
30 august
44.5 + 0.15 N 149.1 + 0.14 E 0: 05-58-26 + 0.9
H = 77 + 5 km ms = 4.6/10 mbv = 5.8/8 mbh = 6.0/4
msh = 5.5/11 mbv(a) = 5.7/14 K = 11
KUR 123 iP SPZ 05 58 46.8 0.50-7.490+4.300-2.470
1.1 Pm MPZ 58 48.0 1 55.0 57.5 125.0
iS MPZ 59 02.0
Sm MPZ 59 04.0 2 225.0 175.0 5.8
YUK 258 iP MPZ 05 59 02.0 1 +8.2 +40.0 -41.5
2.3 Pm MPZ 59 04.0 2 14.0 55.0 45.0 6.8 6.9
Pm SPZ 59 04.2 0.30 7.700 11.17 26.06 7.0
iS MPZ 59 28.0
Sm MPZ 59 38.0 1 135.0 50.0
YSS 559 iP SPZ 05 59 41.0 0.80-0.200+0.440-0.440
5.0 Pm SPZ 59 42.2 0.60 0.770 1.170 1.220 6.0
Pm MPZ 59 45.0 5 2.0 5.6
iS SPZ 06 00 35.0
Sm SPZ 00 41.0 1.00 1.520 1.860 11.1
Sm MPZ 00 41.0 2 2.0 2.0 5.6
M MPZ 06 01 25.0 20 3.3 3.9 4.3
UGL 735 eP MPZ 06 00 00.5
6.6 Pm MPZ 00 05.0 5 0.9 1.0 1.2 5.6 5.6
Pm SPZ 00 05.0 0.70 0.230 5.3
eS MPZ 01 13.0
Sm SPZ 01 28.0 0.70 0.470 0.470 0.250
Sm MPZ 01 29.0 5 8.0 5.0 5.5 5.9
M MPZ 06 02 26.0 22 5.3 2.7 4.4 4.7
TYV 853 eP SPZ 06 00 17.2 -
7.7 Pm SPZ 00 19.9 0.90 0.130 5.2
eS SPZ 01 39.5
Sm SPZ 01 44.0 0.80 0.070
Sm MPZ 01 55.0 4 1.6 5.4
M MPZ 06 03 14.0 16 2.4 2.2 2.2 4.7
SKR 866 eP SPZ 06 00 16.1
7.8 Pm SPZ 00 17.6 0.50 0.090 0.220 0.150 5.5
Pm MPZ 00 19.0 1 1.0 1.0
eS SPZ 01 40.0
Sm SPZ 01 49.3 1.00 0.270 0.470 0.250
Sm MPZ 01 49.3 10 1.2 3.9 2.1 5.4
M MPZ 06 03 06.0 16 3.4 3.2 4.2 4.8
PAU 967 iP SPZ 00 28.2
8.7
TEY 982 eP SPZ 06 00 35.0 +
8.8 Pm MPZ 00 36.0 1 0.7
Pm SPZ 00 37.0 1.00 0.730 0.650 5.8
eS MPZ 02 14.0
Sm MPZ 02 15.0 6 1.0 5.1
M MPZ 06 04 10.0 17 0.5 0.9 1.5 4.2
OKH 1107 eP MPZ 06 00 48.0
10.0 Pm MPZ 00 49.8 6 1.5 5.7
Sm MPZ 02 48.2 7 3.0 2.1 2.5 5.7
M MPZ 06 06 10.0 11 1.5 2.0 1.5 4.8
NKL 1136 eP SPZ 06 00 51.0
10.2 Pm SPZ 00 52.0 1.30 0.150 5.3
Pm MPZ 00 52.0 2 0.3 0.6 5.8 5.4
Sm MPZ 02 57.0 8 1.0 5.1
M MPZ 06 04 54.0 20 1.2 1.3 1.2 4.4
GRNR1171 eP SPZ 06 00 59.0
10.5 Pm SPZ 00 59.8 0.90 0.120 0.120 5.4
PET 1177 eP SPZ 06 00 57.0
10.6 Pm SPZ 01 11.0 1.10 0.070 5.1
Pm MPZ 01 11.4 3 0.4 5.5
Sm SPZ 02 57.4 0.60 0.150
M MPZ 06 06 38.0 15 1.3
VLA 1381 iP MPZ 06 01 18.0 +
12.4 Pm MPZ 01 23.0 4 0.5 0.6 0.8 5.8 5.8
Sm MPZ 03 48.0 8 1.3 5.3
M MPZ 06 08 20.0 18 1.6 1.6 4.5
KLR 1411 eP SPZ 06 01 26.7
12.7 Pm MPZ 01 33.5 7 1.0 5.7
Sm MPZ 03 57.5 7 2.0 0.4 5.6
M MPZ 06 07 46.5 12 1.7
EKMR1510 eP SPZ 06 01 37.4 +
13.6 Pm SPZ 01 42.5 1.00 0.084 5.4
MA2 1679 iP MPZ 06 01 55.1 +
15.1 Pm MPZ 01 57.0 1 0.1 0.1
M MPZ 06 09 28.0 14 2.6 5.0
BMKR1833 eP SPZ 06 02 15.7 +
16.5 Pm SPZ 02 18.3 0.80 0.210 5.9
ZEA 1875 eP SPZ 06 02 18.6
16.9 Pm SPZ 02 22.3 1.00 0.083 0.086 0.140 5.7
Pm MPZ 02 35.0 4 0.5 0.5
eS MPZ 05 26.5
Sm MPZ 05 31.0 6 1.5 1.0 0.4 5.7
M MPZ 06 09 03.0 17 0.7 0.9 4.4
KROS1925 eP SPZ 06 02 25.0 1.00+0.009-0.011+0.018
17.3 Pm SPZ 02 28.0 0.90 0.053 0.120 0.160 5.8
SEY 2056 eP SPZ 06 02 37.6
18.5 Pm SPZ 02 39.5 1.30 0.900 0.340 1.850 6.7
eS SP 06 04.7