Data Report
Bulletin Kurils / April 2003
Contributed by SKHL
------------------------------------------------------------------------
| | |appa| time | T | A, micron | magnitude |
St.|km |phas|ra- |----------| |---------------------------------| K
| | |ture|Hr Min Sec| s | NS | EW | Z | M mbv mbh msh|
------------------------------------------------------------------------
1 2 3 4 5 6 7 8 9 10 11 12 13 14
------------------------------------------------------------------------
01 April 2003
47.0 + 0.06 N 153.4 + 0.15 E 0:08 31 02.1 + 1.3
H = 23.0 + 1 ms = 4.7/4, mbv = 5.7/4, mbh = 5.7/1, msh = 5.3/4
, mbv(a) = 5.5/2 K = 12.0 + 1.0
SKR 454 eP SPZ 08 32 4.0
4.1 Pm MPZ 32 6.4 0.30 0.03
Pm SPZ 32 6.5 0.50 0.23 0.23 0.68 5.7
Pm MPZ 32 7.0 2.0 2.5 6.3
epP SPZ 32 11.9
iS SP 32 51.4
Sm MP 32 55.2 0.20 0.05 0.04 0.03
Sm SP 33 3.0 0.50 0.55 1.16 0.57 10.9
Sm MP 33 8.0 2.0 5 5.6
Sm MP 33 8.0 4.0 3
Sm MP 33 8.0 2.0 2.5 5 5.7
Sm MP 33 8.0 4.0 2.5
M MP 33 50.0 14 4.1 8.1 4.3 4.7
M MP 33 50.0 14 3.3 5.4 3.3 4.6
KUR 466 -iP SPZ 08 32 5.0 0.50 -0.05
4.2 Pm SPZ 32 5.9 0.80 0.09 0.14 0.67
Pm MPZ 32 6.4 1.0 2.5
pP SPZ 32 12.1
iS SP 32 51.2
Sm MP 32 58.4 2.0 14 7.5
Sm SP 33 13.0 0.50 4.03 3.97 12.3
Sm MP 33 13.1 0.27 0.1
Sm MP 33 13.1 0.50 0.12
PAU 559 eP SPZ 08 32 17.2
5.0 e SP 33 29.7
YUK 670 eP MPZ 08 32 29.3
6.0 Pm MPZ 32 40.0 1.0 1.5 2.5
Pm SPZ 32 42.0 0.60 0.8
Pm SPZ 32 42.0 0.30 0.6 0.99
Pm MPZ 32 43.6 0.23 0.1
Pm MPZ 32 44.7 0.18 0.12
Pm MPZ 32 44.9 0.18 0.09
iS SP 33 33.1
Sm MP 33 55.9 0.24 0.1
Sm MP 33 57.1 0.43 0.16
Sm MP 33 59.0 1.0 10 10.5
Sm MP 33 59.1 0.51 0.15
Sm SP 33 59.5 0.50 3.3 5 12.9
PET 769 iP MPZ 08 32 42.0
6.9 Pm MPZ 32 43.0 4.7 0.333 5.2
Pm MPZ 32 44.0 4.8 0.855 5.6
Pm SPZ 32 51.0 1.0 0.279 5.3
eS SP 33 59.0
Sm MP 34 5.0 3.2 1.812 5.5
Sm MP 34 7.0 5.9 0.671 4.8
Sm SP 34 21.0 1.1 0.648
Sm SP 34 29.0 0.70 0.717
M MP 35 9.0 18 1.676
M MP 35 10.0 18 1.67
YSS 804 eP SPZ 08 32 49.0
7.2 PM SPZ 32 51.8 0.90 0.34 0.11 0.28
iS SP 34 3.7
UGL 870 eP MPZ 08 32 57.0
7.8 eP SPZ 32 57.0
PM SPZ 33 2.0 1.0 0.38
PM MPZ 33 7.5 1.8 0.7
sP SPZ 33 7.7
TYV 891 eP SPZ 08 33 0.0
8.0 Pm SPZ 33 3.3 1.1 0.239
sP SPZ 33 10.5
OKH 1040 eP SPZ 08 33 18.1
9.4 eP MPZ 33 18.1
Pm MPZ 33 28.0 5.0 1.1 5.7
eS MP 35 3.8
e MP 36 14.0 -
M MP 39 9.8 11 1.2 2.8 2.1 4.9
NKL 1131 iP MPZ 08 33 28.0 1.0 0 0.5 0.6
10.2 eP SPZ 33 28.0
Pm MPZ 33 31.5 1.5 0.5
Pm MPZ 33 31.5 1.0 0.3 0.6
Pm SPZ 33 31.5 1.0 0.1 0.15 0.21
sP SPZ 33 39.2
e MP 36 38.0
M MP 38 30.0 15 1.7 1.2 2.2 4.6
GRNR1304 eP SPZ 08 33 53.2
11.7 Pm SPZ 33 54.2 1.0 0.085 0.17 0.16
TEY 1309 e MP 08 34 9.0
11.8 e MP 37 6.0
M MP 37 55.0 18 2.3
EKMR1599 eP SPZ 08 34 27.3
14.4 Pm SPZ 34 37.9 0.80 0.037
KLR 1617 eP MPZ 08 34 30.0
14.6 pP MPZ 34 37.5
e MP 37 19.5
Sm MP 37 34.5 9.5 0.9 0.4 5.4
e MP 38 37.5
M MP 42 9.5 12 0.6 1.1 1.7 4.8
BMKR1908 eP SPZ 08 35 3.0
17.2 Pm SPZ 35 7.5 0.70 0.018
YASR1925 eP SPZ 08 35 2.7
17.3 Pm SPZ 35 7.5 0.50 0.011 0.016
ZEA 1980 eP SPZ 08 35 8.6
17.8 Pm SPZ 35 11.7 1.1 0.028 0.029
Pm MPZ 35 24.0 4.0 0.3 0.5 0.5 5.6 5.7
e SP 35 25.4
e SP 35 31.9
e MP 35 33.0
eS MP 38 30.0
Sm MP 38 35.0 7.0 0.2 4.6
e MP 40 16.0
M MP 42 33.0 16 1.2 1.4
KROS2017 eP SPZ 08 35 12.9
18.2 Pm SPZ 35 16.1 0.80 0.023 0.029
pP SPZ 35 18.9
e SP 35 32.0
01 April 2003
45.6 + 0.02 N 149.9 + 0.03 E 0:18 48 13.1 + 4.0
H = 185 + 5 mbv(a) = 5.1/1, msh(a) = 5.5/1 K = 10.4 + 0.9
KUR 165 -iP MPZ 18 48 47.5 0.50 -1.5
1.5 -iP SPZ 48 47.5 0.50 -0.24
Pm SPZ 48 47.9 0.50 0.52
Pm MPZ 48 48.0 1.0 2
iS SP 49 13.3
Sm SP 49 14.9 0.50 0.71 0.4 9.7
Sm MP 49 16.2 0.20 0.02
Sm MP 49 16.2 0.17 0.03
YUK 365 -iP SPZ 18 49 8.2 0.30 -0.25
3.3 Pm MPZ 49 8.5 0.40 1.5
Pm SPZ 49 8.6 0.40 0.18 0.35 1.2
Pm MPZ 49 10.5 0.10 0.11
Pm MPZ 49 12.0 0.24 0.1
Pm MPZ 49 12.3 0.11 0.1
iS SP 49 46.2
Sm MP 49 52.1 1.0 1.5
Sm SP 49 55.5 0.30 0.85 0.42 11.0
YSS 567 -iP SPZ 18 49 29.0
5.1 PM SPZ 49 30.0 0.80 0.02
e SP 49 36.0
e SP 49 45.2
SKR 721 eP SPZ 18 49 48.1
6.5 Pm SPZ 49 51.0 0.50 0.06 0.08 0.08 5.1
eS SP 50 59.9
Sm SP 51 7.5 0.50 0.06 0.08 0.05 5.5
PAU 824 eP SPZ 18 50 0.0
7.4 eS SP 51 20.0
01 April 2003
45.5 + 0.03 N 150.6 + 0.02 E 0:21 05 52.8 + 3.6
H = 54 + 23 K = 10.1 + 0.5
KUR 215 -iP SPZ 21 06 23.2 0.50 -0.06
1.9 Pm SPZ 06 24.0 0.50 0.46
iS SP 06 46.0
Sm MP 06 48.8 1.0 3 1.5
Sm SP 06 49.0 0.60 1.37 0.84 9.8
Sm MP 06 49.6 0.36 0.03 0.04
YUK 407 eP SPZ 21 06 47.5
3.7 Pm SPZ 06 52.5 0.40 0.23
Pm SPZ 06 52.5 0.50 0.15 0.15
Sm SP 07 36.4 0.45 0.73 0.38 10.4
Sm MP 07 48.0 1.0 1.3 2.3
YSS 624 eP SPZ 21 07 15.0
5.6 e SP 07 26.7
eS SP 08 15.5
Sm SP 08 22.4 1.0 0.02
SKR 704 e SP 21 07 35.5
6.3 e SP 08 8.7
TYV 838 e SP 21 07 41.0
7.5
NKL 1112 eP SPZ 21 08 15.0
10.0 Pm SPZ 08 17.5 1.0 0.013 0.013 0.015
EKMR1526 eP SPZ 21 09 9.0
13.7 Pm SPZ 09 9.9 1.0 0.006
ZEA 1900 eP SPZ 21 09 50.6
17.1 Pm SPZ 09 52.4 1.0 0.017
KROS1946 eP SPZ 21 09 56.0
17.5 Pm SPZ 09 58.2 0.80 0.004
03 April 2003
48.8 + 0.08 N 154.5 + 0.18 E 0:01 27 53.8 + 1.2
H = 173 + 16 mbv = 5.5/3, mbh = 5.3/1, msh = 5.2/5, mbv(a) = 5.1/8
, msh(a) = 5.7/5 K = 10.2 + 0.1
SKR 236 eP SPZ 01 28 33.0
2.1 Pm MPZ 28 38.4 3.0 2.5 2.5 5.2 5.3
Pm SPZ 28 38.4 1.0 0.67 5.1
iS SP 29 2.7
eS MP 29 2.7
Sm MP 29 8.0 5.0 4.5 6.1 4 5.4
Sm MP 29 8.0 5.0 4.5 7 5.5
Sm MP 29 16.9 0.50 0.04 0.04
Sm SP 29 17.0 0.60 1.14 0.97 0.63 5.8 10.2
PAU 342 iP SPZ 01 28 45.2
3.1 iS SP 29 22.6
PET 552 eP SPZ 01 29 11.0
5.0 Pm SPZ 29 13.0 0.50 0.067 4.9
eS SP 30 6.0
Sm SP 30 8.0 0.70 0.574 5.9 10.3
M MP 30 16.0 13 0.28
KUR 638 eP SPZ 01 29 20.4
5.7 Pm SPZ 29 22.0 1.0 0.21 0.11 0.26 5.3
eS SP 30 25.8
Sm MP 30 28.8 2.0 3 2.5 5.6
Sm SP 30 33.6 0.80 0.43 0.12 5.8 10.2
YUK 845 eP SPZ 01 29 42.9
7.6 Pm SPZ 29 45.0 0.50 0.08 0.19 0.38 6.0
Pm MPZ 29 48.5 1.0 1 6.1
eS SP 31 5.9
Sm MP 31 16.5 1.1 1.7 1.5 5.6
Sm SP 31 16.5 0.60 0.39 0.26 6.2
TYV 875 eP SPZ 01 29 45.0
7.9 Pm SPZ 29 46.7 1.0 0.037 4.7
YSS 896 eP SPZ 01 29 48.9
8.1 Pm SPZ 29 49.9 0.80 0.03 0.05 0.04 4.5
eS SP 31 15.0
Sm SP 31 23.1 0.90 0.03 4.9
UGL 904 eP MPZ 01 29 50.0
8.1 eP SPZ 29 50.0
Pm MPZ 29 52.0 2.0 0.4 5.4
Pm SPZ 29 53.5 0.70 0.064 4.8
eS MP 31 23.0
Sm MP 31 38.0 7.0 0.4 1 0.6 4.6
OKH 961 eP SPZ 01 29 56.0
8.6 eP MPZ 29 56.0
eS MP 31 33.8
Sm MP 31 34.0 6.0 1 4.9
NKL 1076 eP SPZ 01 30 9.0
9.7 Pm SPZ 30 11.8 1.2 0.035 0.06 0.07 5.3
i SP 30 17.7
KLR 1650 eP SPZ 01 31 18.7
14.8 Pm SPZ 31 22.1 1.0 0.036 0.04
BMKR1867 eP SPZ 01 31 40.8
16.8 Pm SPZ 31 42.0 0.90 0.046
YASR1903 eP SPZ 01 31 43.8
17.1 Pm SPZ 31 48.6 0.50 0.003 0.026 0.058
ZEA 1953 eP SPZ 01 31 49.2
17.6 Pm SPZ 31 52.6 1.3 0.07 0.078
e MP 35 25.0
M MP 02 01 0.0 21 0.5
KROS1982 eP SPZ 01 31 51.5
17.8 Pm SPZ 31 56.0 1.0 0.016 0.043 0.051
04 April 2003
46.8 + 0.13 N 152.7 + 0.19 E 0:06 31 46.3 + 6.6
H = 51 + 17 mbv(a) = 5.1/2 K = 10.4 + 0.4
KUR 410 +iP SPZ 06 32 42.6 0.40 0.163
3.7 Pm SPZ 32 43.0 0.40 0.082 0.147
eS SP 33 24.8
Sm MP 33 28.0 2.0 1.5
Sm MP 33 31.5 0.50 0.274 0.152
SKR 495 eP SPZ 06 32 52.8
4.5 Pm SPZ 32 54.1 0.40 0.05 4.7
eS SP 33 41.8
Sm SP 33 46.5 0.20 0.21 0.26 10.7
Sm SP 33 46.5 0.50 0.06
YUK 614 eP SPZ 06 33 6.0
5.5 Pm SPZ 33 6.4 0.30 0.18 5.5
eS SP 34 15.5
Sm SP 34 26.8 0.50 0.19 0.21 10.1
YSS 753 eP SPZ 06 33 24.0
6.8
04 April 2003
47.1 + 0.09 N 153.8 + 0.14 E 0:12 50 10.7 + 0.7
H = 49 + 12 K = 10.5
KUR 505 -iP SPZ 12 51 18.6 0.60 -0.06
4.5 Pm SPZ 51 19.8 0.60 0.061 0.16
eS SP 52 9.0
Sm MP 52 14.0 2.0 3.5 2.5
Sm SP 52 15.6 0.60 0.745 0.258 10.5
YUK 709 eP SPZ 12 51 42.0
6.4 Pm SPZ 51 42.9 0.20 0.19
iS SP 52 52.6
Sm SP 52 57.9 0.60 0.7 0.58
Sm MP 53 10.2 1.0 1.5 2
YSS 839 +iP SPZ 12 51 59.5
7.5 PM SPZ 52 1.2 1.0 0.16
UGL 899 +iP SPZ 12 52 7.2 1.0 0.067
8.1 PM SPZ 52 8.2 0.80 0.3
TYV 913 eP SPZ 12 52 8.1
8.2 Pm SPZ 52 9.1 1.0 0.046
07 April 2003
47.9 + 0.07 N 148.3 + 0.12 E 0:03 28 57.5 + 7.5
H = 413 + 6 mbv = 5.6/5, mbh = 6.4/1, msh = 5.6/4, mbv(a) = 5.4/6
, msh(a) = 6.3/5
KUR 294 eP SPZ 03 30 1.2
2.6 Pm SPZ 30 1.5 0.70 0.155
eS SP 30 49.0
Sm SP 30 51.0 1.2 0.953 1905 8.7
YSS 429 -iP MPZ 03 30 10.4
3.9 -iP SPZ 30 10.4 0.60 0.04 0.14 -0.18
PM SPZ 30 11.1 0.80 0.18 0.25
PM SPZ 30 11.1 0.80 0.36
iS SP 31 6.0
SM SP 31 8.8 1.0 0.34 0.64
SM MP 31 12.0 8.0 2.9 2
M MP 31 56.0 9.0 1
YUK 465 eP MPZ 03 30 13.0
4.2 iP SPZ 30 13.0
Pm SPZ 30 13.4 0.50 0.14 0.16 0.52 5.4
Pm MPZ 30 17.7 0.60 0.7 1.5 6.4
Pm MPZ 30 17.7 1.0 1.8 5.9
iS SP 31 9.0
Sm MP 31 15.5 1.8 5 6.3
Sm MP 31 15.5 0.90 10
Sm SP 31 16.0 0.70 1.55 3.42 6.6
UGL 479 +iP SPZ 03 30 13.5 0.60 0.063
4.3 +iP MPZ 30 13.5 0.80 1
PM SPZ 30 14.5 0.60 0.16
PM MPZ 30 15.0 1.0 0.5
iS MP 31 12.5
eS SP 31 12.5
SM MP 31 15.0 3.0 2.1 2.7
SM SP 31 15.5 0.80 0.33
SM SP 31 15.5 0.70 0.14 0.1
TYV 528 +iP SPZ 03 30 18.2 0.70 -0.22 0.216
4.7 Pm SPZ 30 19.2 0.70 0.398
eS SP 31 19.5
Sm SP 31 23.0 1.2 0.256 0.721
SKR 643 eP SPZ 03 30 30.0
5.8 Pm MPZ 30 31.0 2.0 3 5.8
Pm SPZ 30 31.5 0.50 0.19 0.22 0.99 5.9
Pm MPZ 30 31.5 0.40 0.02
eS SP 31 40.5
Sm SP 31 54.4 1.4 0.64
Sm SP 31 54.4 0.60 0.1 0.16 5.3
PAU 732 iP SPZ 03 30 39.1
6.6
OKH 741 iP MPZ 03 30 38.4
6.7 iP SPZ 30 39.0
Pm SPZ 30 39.2 0.90 0.6 5.4
Pm MPZ 30 39.6 3.0 1.4 5.4
iS MP 31 58.0
Sm MP 32 0.0 7.0 1.6
Sm MP 32 0.0 4.0 2.6 5.5
NKL 797 iP MPZ 03 30 43.2 2.0 0.5
7.2 iP SPZ 30 43.2 0.70 0.07 0.04 0.07
Pm SPZ 30 43.9 0.80 0.065 0.05 0.09 4.8
Pm MPZ 30 44.5 2.0 0.5 5.2
eS MP 32 8.0
Sm SP 32 10.0 1.1 0.16 5.0
Sm MP 32 13.0 2.5 1
Sm MP 32 13.0 5.0 1 5.3
GRNR 918 eP SPZ 03 30 57.0
8.3 Pm SPZ 30 58.2 1.0 0.085 0.084 4.9
eS SP 32 31.8
PET 929 iP MPZ 03 30 58.0
8.4 iP SPZ 30 58.0
Pm SPZ 31 0.0 0.60 0.158 0.375 5.8
Pm SPZ 31 0.0 1.0 0.224
Pm MPZ 31 0.0 0.70 0.33 5.7
eS SP 32 34.0
Sm SP 32 35.0 1.1 0.121 0.124 5.7
TEY 948 eP SPZ 03 31 0.0
8.5 Pm SPZ 31 3.0 1.9 1.3 2
eS MP 32 40.0
Sm MP 32 44.0 2.5 0.5 1
KLR 1225 iP SPZ 03 31 29.8
11.0 iP MPZ 31 29.8
Pm SPZ 31 31.6 0.80 0.04 0.056
eS MP 33 32.0
Sm MP 33 39.5 7.5 1.4 0.4 5.2
EKMR1228 eP SPZ 03 31 29.0
11.1 Pm SPZ 31 32.7 0.70 0.028
BMKR1544 eP SPZ 03 32 0.5
13.9 Pm SPZ 32 1.5 0.50 0.013
YASR1549 eP SPZ 03 31 59.8
13.9 Pm SPZ 32 1.6 0.50 0.003 0.013 0.019
ZEA 1606 eP SPZ 03 32 5.8 - - -
14.5 PM SPZ 32 7.6 0.90 0.016
KROS1648 iP SPZ 03 32 10.0 0.80 0.008 0.011 0.02
14.8 Pm SPZ 32 10.6 0.50 0.015 0.022
09 April 2003
42.6 + 0.02 N 144.7 + 0.10 E 0:13 35 34.5 + 3.0
H = 40.0 + -1 mbv(a) = 5.3/1 K = 9.6 + 1.1
YUK 187 eP SPZ 13 36 0.5
1.7 Pm SPZ 36 1.5 0.20 0.46 0.34 0.62 5.3
iS SP 36 19.5
Sm SP 36 21.7 0.40 1.52 2.2 10.3
Sm MP 36 23.7 0.60 3.7 2.5
Sm MP 36 25.0 0.10 0.1
Sm MP 36 25.8 0.26 0.1
Sm MP 36 26.6 0.26 0.1
KUR 389 -iP SPZ 13 36 27.8 0.60 -0.09
3.5 Pm SPZ 36 29.5 0.60 0.046 0.053 0.084
eS SP 37 7.5
Sm SP 37 16.8 0.80 0.161 0.183 8.8
YSS 510 eP SPZ 13 36 42.8
4.6
10 April 2003
44.3 + 0.12 N 148.0 + 0.17 E 0:17 17 31.8 + 0.2
H = 45 + 2 mbv(a) = 6.1/1 K = 10.6 + 0.2
KUR 101 -iP SPZ 17 17 47.4 0.40 -0.44 -0.16 -17278
0.9 Pm MPZ 17 47.6 0.04 0.15
Pm MPZ 17 48.0 0.40 1.34 1.29 3.19
Pm MPZ 17 48.0 1.0 4.5
eS SP 17 59.0
Sm MP 17 59.9 0.13 0.05
Sm MP 17 59.9 0.08 0.06
Sm MP 17 59.9 0.21 0.25
Sm SP 18 1.2 0.40 4.84 7.97 10.5
Sm MP 18 2.4 1.0 12.5
YUK 170 iP SPZ 17 17 56.0 0.15 0.57
1.5 Pm MPZ 17 57.0 0.30 2.6
Pm MPZ 17 57.4 0.08 0.28 0.21
Pm SPZ 17 57.7 0.20 1.37 1 3.61 6.1
Pm MPZ 17 58.3 0.08 0.24
e SP 18 7.6
isP SPZ 18 12.6
iS SP 18 14.3
Sm MP 18 18.6 0.15 0.2
Sm MP 18 19.3 0.13 0.31
Sm MP 18 19.5 0.80 7.2
Sm MP 18 19.5 0.40 5.1
Sm SP 18 19.7 0.50 4.7 4.24 10.7
Sm MP 18 20.2 0.12 0.37
YSS 498 -iP SPZ 17 18 37.0
4.5 PM SPZ 18 37.7 0.40 0.05 0.03 0.06
pP SPZ 18 50.7
sP SPZ 18 55.2
eS SP 19 26.0
SM SP 19 33.7 0.80 0.03 0.03
e SP 19 39.5
UGL 692 eP SPZ 17 19 0.5 -
6.2
TYV 827 e SP 17 19 10.2
7.4
NKL 1115 eP SPZ 17 19 52.5
10.0 Pm SPZ 19 54.0 1.3 0.017
EKMR1463 eP SPZ 17 20 37.8
13.2 Pm SPZ 20 40.3 0.70 0.006
YASR1759 eP SPZ 17 21 12.2
15.8 Pm SPZ 21 13.4 0.80 0.005
BMKR1787 eP SPZ 17 21 15.7
16.1 Pm SPZ 21 17.3 1.0 0.016
KROS1876 eP SPZ 17 21 24.6
16.9 Pm SPZ 21 26.0 0.60 0.002
11 April 2003
46.2 + 0.12 N 153.4 + 0.19 E 0:04 41 52.8 + 7.1
H = 40 + 30 mbv(a) = 6.0/1 K = 10.5 + 0.3
KUR 440 eP SPZ 04 42 53.5
4.0 eS SP 43 39.0
Sm SP 43 59.0 0.40 0.49 0.33 10.4
YUK 636 eP SPZ 04 43 18.0
5.7 Pm SPZ 43 19.0 0.20 0.39 6.0
Pm SPZ 43 19.0 0.40 0.09
eS MP 44 22.3
Sm MP 44 39.2 1.0 1.2 1
Sm SP 44 52.0 0.50 0.51 0.23 10.7
PAU 639 eP SPZ 04 43 18.4
5.7
YSS 814 eP SPZ 04 43 37.2
7.3 e SP 43 45.5
14 April 2003
45.7 + 0.07 N 150.2 + 0.11 E 0:01 47 24.5 + 3.6
H = 140.0 + 0 mbv(a) = 4.8/1 K = 10.7 + 0.4
KUR 187 -iP SPZ 01 47 55.9 0.30 0.144 0 -0.54
1.7 Pm MPZ 47 56.9 0.09 0.05
Pm SPZ 47 57.0 0.50 0.3 0.32 0.68
eS SP 48 18.8
Sm MP 48 20.0 0.40 0.05 0.1 0.03
Sm MP 48 20.8 1.0 5 6.25
Sm SP 48 23.0 0.60 2.81 0.84 10.4
YUK 388 eP SPZ 01 48 17.4
3.5 Pm SPZ 48 17.9 0.25 0.76
eS SP 48 56.7
Sm SP 49 2.5 0.50 1.1 1.3 11.0
Sm MP 49 2.5 0.60 2 2.5
YSS 583 eP SPZ 01 48 42.0
5.2 eS SP 49 43.0
SM SP 49 46.0 1.0 0.03
SKR 700 eP SPZ 01 48 54.4
6.3 Pm SPZ 48 58.9 0.50 0.04 4.8
e SP 49 5.5
e SP 49 19.0
TYV 793 e SP 01 49 7.8
7.1
14 April 2003
42.3 + 0.03 N 143.0 + 0.03 E 0:03 46 00.4 + 4.7
H = 48 + 5 mbv(a) = 5.0/3 K = 10.7 + 0.7
YUK 300 eP SPZ 03 46 41.2
2.7 Pm MPZ 46 43.0 0.40 2
Pm SPZ 46 43.0 0.30 0.38 0.35 1 5.7
iS SP 47 11.0
Sm SP 47 19.3 0.50 3.4 1.9 11.2
Sm MP 47 22.2 0.13 0.15
Sm MP 47 23.0 0.11 0.15
Sm MP 47 23.5 0.15 0.15
Sm MP 47 24.0 0.90 5 5
KUR 507 eP SPZ 03 47 8.8
4.6 Pm SPZ 47 11.0 1.0 0.19 0.15
eS SP 48 1.5
Sm SP 48 8.0 1.0 0.75 0.57 10.2
YSS 518 eP SPZ 03 47 9.0
4.7 Pm SPZ 47 13.0 1.0 0.04 0.05 4.3
Sm SP 47 57.9 0.60 0.03
TYV 952 eP SPZ 03 48 3.5
8.6
NKL 1218 eP SPZ 03 48 36.0
11.0 Pm SPZ 48 38.0 1.0 0.01 0.022
15 April 2003
44.6 + 0.02 N 148.9 + 0.03 E 0:08 42 26.7 + 1.9
H = 36.5 + 1 K = 9.9 + 1.0
KUR 106 -iP SPZ 08 42 43.0 0.40 -0.26
1.0 Pm SPZ 42 43.6 0.40 0.188 0.204 0.611
eS SP 42 55.2
Sm MP 42 55.3 0.15 0.05
Sm MP 42 55.3 0.20 0.06 0.04
Sm SP 42 58.0 0.40 1.81 1.34 9.2
YUK 251 eP SPZ 08 43 2.0
2.3 Pm SPZ 43 3.0 0.20 0.22
eS SP 43 26.5
Sm SP 43 30.0 0.30 1.14 1.13 10.6
Sm MP 43 31.0 1.0 1.4 1.8
16 April 2003
44.6 + 0.17 N 149.1 + 0.16 E 0:07 48 13.3 + 2.5
H = 40 + 10 K = 10.2 + 0.4
KUR 119 -iP SPZ 07 48 31.0 0.40 -0.28
1.1 Pm SPZ 48 31.4 0.40 0.261 0.163 0.53
Pm MPZ 48 32.3 0.12 0.02
eS SP 48 44.3
Sm SP 48 44.5 0.40 3.91 6.23
Sm MP 48 44.6 0.17 0.27 0.2 0.04
YUK 264 eP SPZ 07 48 51.2
2.4 Pm SPZ 48 52.7 0.35 0.14
iS MP 49 19.7
Sm MP 49 24.2 0.50 1.5
Sm MP 49 24.2 0.80 1.5
Sm SP 49 27.5 0.40 0.85 0.36
17 April 2003
42.5 + 0.01 N 143.4 + 0.04 E 0:00 03 12.8 + 4.1
H = 87.0 + -1 mbv(a) = 5.1/1, msh(a) = 5.7/1 K = 9.9
YUK 264 eP SPZ 00 03 50.0
2.4 Pm SPZ 03 50.5 0.30 0.2 5.1
eS SP 04 21.5
Sm MP 04 24.9 0.60 1
Sm SP 04 29.0 0.40 0.71 0.38 5.7 9.9
17 April 2003
42.5 + 0.01 N 143.5 + 0.04 E 0:15 40 55.0 + 4.1
H = 79 + 23 K = 11.0 + 1.0
YUK 250 +iP SPZ 15 41 29.8 0.50 0.17
2.3 Pm SPZ 41 31.8 0.35 0.39
Pm SPZ 41 31.8 0.50 1.16
Pm SPZ 41 31.8 0.30 0.22
Pm MPZ 41 35.7 0.80 3.3
Pm MPZ 41 35.7 0.60 1.6
Pm MPZ 41 35.7 0.70 2
iS SP 41 55.9
Sm MP 41 56.7 0.80 0 12
Sm MP 41 56.7 1.0 10
Sm SP 41 57.5 0.50 6.56 7 11.7
Sm MP 41 58.1 0.13 0.2
Sm MP 41 58.5 0.14 0.11
Sm MP 41 58.7 0.14 0.2
KUR 458 eP SPZ 15 41 56.0
4.1 Pm SPZ 41 59.0 0.40 0.08 0.06 0.24
eS SP 42 45.0
Sm SP 42 49.0 0.80 0.86 0.64 10.4
YSS 494 eP SPZ 15 42 1.0
4.4 iS SP 42 49.0
SM SP 42 50.3 0.80 0.1 0.07
21 April 3003
48.9 + 0.06 N 156.8 + 0.06 E 0:06 25 53.3 + 3.3
H = 26 + 2 ms = 4.4/4, mbh = 5.0/1, msh = 4.8/1, mbv(a) = 5.0/2
K = 10.2
SKR 201 eP SPZ 06 26 21.0
1.8 Pm SPZ 26 24.6 0.50 0.15 0.14 0.37 4.7
Pm MPZ 26 26.0 4.0 1.4 1.4 5.0
Pm MPZ 26 26.0 2.0 1.8
i SP 26 26.1
iS SP 26 41.8
eS MP 26 42.1
Sm MP 26 45.6 0.20 0.04 0.04
Sm MP 26 45.6 0.10 0.03
Sm MP 26 50.0 2.0 4 3.5 4.8
Sm MP 26 50.0 2.0 4 3.8 2 4.9
Sm SP 26 50.0 0.40 1.38 1.54 0.75 10.2
M MP 27 33.0 10 2.1
M MP 27 33.0 8.0 3 3.9
M MP 27 33.0 10 2
M MP 27 33.0 8.0 3 4
PAU 285 iP SPZ 06 26 33.7
2.6 i SP 27 22.6
PET 473 eP SPZ 06 26 58.0
4.3 e SP 27 54.0
Sm SP 28 2.0 0.70 0.323
M MP 28 36.0 3.8 0.745
M MP 28 36.0 4.7 1.058
M MP 28 44.0 19 0.491
KUR 791 eP SPZ 06 27 38.0
7.1 Pm SPZ 27 44.5 1.0 0.23 5.4
e SP 29 1.2
Sm SP 29 14.0 0.60 0.34 0.3
TYV 1034 eP SPZ 06 28 8.0
9.3 Pm SPZ 28 9.1 1.0 0.014
M MP 32 33.0 16 0.6 1 1.4 4.3
YSS 1068 eP SPZ 06 28 12.3
9.6 Pm SPZ 28 14.1 1.0 0.02 0.02
e SP 28 23.0
eLQ SP 30 35.0
M SP 31 53.0 16 0.5 0.4
UGL 1073 eP SPZ 06 28 13.5
9.7 e SP 28 23.0
eL MP 30 48.0
M MP 32 29.0 16 0.4 1.5 1 4.4
NKL 1217 eP SPZ 06 28 29.8
11.0 Pm SPZ 28 31.2 1.2 0.022 0.028
eL MP 31 45.0
M MP 33 39.0 15 0.9 0.9 4.3
21 April 2003
46.5 + 0.13 N 153.0 + 0.17 E 0:07 14 32.5 + 6.8
H = 30 + 5 mbv(a) = 4.9/3 K = 9.9 + 0.6
KUR 421 eP SPZ 07 15 30.5
3.8 Pm SPZ 15 32.6 0.50 0.08 4.5
eS SP 16 14.0
Sm SP 16 30.3 0.60 0.3 0.34 9.8
SKR 513 eP SPZ 07 15 40.1
4.6 Pm SPZ 15 40.9 0.50 0.06 4.7
Sm SP 16 33.0 0.40 0.11 0.09 0.06 9.4
PAU 618 eP SPZ 07 15 56.4
5.6 e SP 16 50.8
YUK 622 eP SPZ 07 15 54.8
5.6 Pm SPZ 15 56.9 0.35 0.18 5.4
eS SP 16 58.0
Sm MP 17 19.0 0.90 1.4 0.8
Sm SP 17 22.0 0.50 0.23 0.39 10.5
YSS 779 eP SPZ 07 16 14.5
7.0
21 April 2003
43.1 + 0.01 N 145.7 + 0.05 E 0:14 21 02.9 + 2.0
H = 22.3 + 1 K = 9.2 + 0.5
YUK 107 +iP SPZ 14 21 19.6 0.50 0.17
1.0 +iP SPZ 21 19.6 0.50 0.17
Pm SPZ 21 21.8 0.20 0.26
Pm SPZ 21 21.8 0.20 0.26
Pm SPZ 21 21.8 0.25 0.29 1.46
Pm SPZ 21 21.8 0.25 0.29 1.46
ipP SPZ 21 26.4
ipP SPZ 21 26.4
isP SPZ 21 30.0
isP SPZ 21 30.0
iS SP 21 32.1
iS SP 21 32.1
Sm MP 21 32.6 0.60 3.2 7
Sm MP 21 32.6 0.60 3.2 7
Sm MP 21 34.6 0.12 0.18
Sm MP 21 34.6 0.12 0.18
Sm SP 21 35.0 0.50 4.05 9.6
Sm SP 21 35.0 0.30 2.46
Sm SP 21 35.0 0.30 2.46
Sm SP 21 35.0 0.50 4.05
Sm MP 21 36.8 0.17 0.28
Sm MP 21 36.8 0.17 0.28
Sm MP 21 37.0 0.13 0.3
Sm MP 21 37.0 0.13 0.3
KUR 298 eP SPZ 14 21 45.0
2.7 eS SP 22 15.8 0.50 0.137 0.228
Sm SP 22 23.5 0.50 0.137 0.228 8.8
YSS 487 eP SPZ 14 22 9.3
4.4 e SP 22 29.5
21 April 2003
44.1 + 0.04 N 147.2 + 0.05 E 0:19 22 16.2 + 1.1
H = 109 + 5 msh(a) = 4.3/1 K = 9.4 + 1.5
YUK 107 -iP SPZ 19 22 37.5 0.35 -0.86
1.0 Pm MPZ 22 37.8 0.50 6.1
Pm SPZ 22 38.0 0.20 0.57 0.82 6.44
Pm MPZ 22 39.9 0.14 0.1
Pm MPZ 22 41.1 0.17 0.1 0.175
iS SP 22 53.0
Sm MP 22 54.2 0.50 5.1 6.6
Sm MP 22 54.3 0.16 0.2 0.2
Sm SP 22 54.7 0.40 3.34 3.58 10.5
Sm MP 22 54.8 0.14 0.11
KUR 134 eP SPZ 19 22 39.0
1.2 eS SP 22 57.0
Sm SP 22 57.5 0.50 0.304 0.304 8.4
YSS 466 eP SPZ 19 23 18.5
4.2 eS SP 24 2.5
Sm SP 24 8.0 1.0 0.02 4.3 6.8
EKMR1439 eP SPZ 19 25 15.5
12.9 Pm SPZ 25 17.4 0.60 0.004
KROS1848 eP SPZ 19 26 2.5
16.6 Pm SPZ 26 4.3 0.60 0.001
23 April 2003
42.5 + 0.01 N 145.1 + 0.03 E 0:00 53 31.7 + 2.9
H = 58 + 14 K = 10.3 + 0.6
YUK 180 +iP SPZ 00 53 56.8 0.35 0.21
1.6 Pm SPZ 53 58.7 0.40 0.31 0.35
Pm SPZ 53 58.7 0.25 0.81
e SP 54 7.6
e SP 54 12.5
iS SP 54 15.6
Sm SP 54 18.6 0.50 3.9 5.28 10.8
Sm MP 54 18.7 0.80 5.5 10
Sm MP 54 19.1 0.20 0.11
Sm MP 54 19.7 0.20 0.26
Sm MP 54 21.5 0.33 0.15
KUR 374 eP SPZ 00 54 20.0
3.4 Pm SPZ 54 34.0 1.0 0.15 0.15 0.38
eS SP 55 4.0
Sm SP 55 11.5 0.40 0.41 0.24 9.9
24 April 2003
48.8 + 0.03 N 155.1 + 0.07 E 0:10 56 25.2 + 3.5
H = 56 + 3 ms = 5.9/5, mbv = 6.3/6, mbh = 6.2/5, msh = 6.2/6
, mbv(a) = 5.9/4
SKR 215 iP MPZ 10 56 54.8 4.0 12 - 8
1.9 iP MPZ 56 54.8 4.0 8 - 6.4
iP MPZ 56 54.8 2.0 2.4
iP SPZ 56 54.8 1.0 0.45 0.63
Pm SPZ 56 56.5 1.0 1.03 0.63 2.33 5.6
Pm MPZ 56 58.0 4.0 16 10 14 6.2 6.1
Pm MPZ 56 58.0 4.0 15 11.2 13.2 6.2 6.1
Pm MPZ 56 58.1 1.8 0.09 0.13
iS MP 57 17.0
eS MP 57 19.2
Sm MP 57 27.2 1.5 0.51 0.43 0.17
Sm MP 57 28.0 9.0 110.6 200.4 122.7 6.0
M MP 57 56.0 14 177.5 151.7 144.1 5.5
PAU 320 eP SPZ 10 57 8.7
2.9 e SP 57 48.1
KUR 677 -iP MPZ 10 57 53.5 2.0 12.5
6.1 -iP SPZ 57 53.5 0.70 -0.19 -0.29 1032
Pm SPZ 57 59.0 0.90 2059 2272 6958
Pm MPZ 57 59.7 1.3 0.05 0.1
iS SP 59 4.0
Sm MP 59 10.0 4.0 236.3 225
Sm MP 59 10.2 1.5 0.5 0.8
YUK 884 +iP SPZ 10 58 16.5 0.90 0.97
8.0 +iP MPZ 58 16.7 1.0 -4 -6 7
Pm MPZ 58 21.0 1.0 5 10
Pm MPZ 58 21.0 0.70 2.7
Pm MPZ 58 21.3 0.87 0.125
Pm SPZ 58 21.6 0.50 2.84 2.39 2.67
Pm MPZ 58 24.2 0.43 0.11
Pm MPZ 58 25.0 0.40 0.11
iS MP 59 45.0
TYV 917 eP SPZ 10 58 23.2
8.3 Pm SPZ 58 29.0 1.2 0.689 5.9
Pm MPZ 58 36.0 9.0 3.8 9.2 8.4 6.3 6.2
e MP 11 00 3.0
Sm MP 00 10.0 17 14.2 6.1
Sm MP 00 10.0 10 15
M MP 02 27.0 15 84
YSS 941 -iP MPZ 10 58 26.4
8.5 -iP MPZ 58 26.4 4.0 1.4 4.1 -2.7
-iP SPZ 58 26.4 1.0 0.12 0.26 -0.22
PM SPZ 58 27.9 0.80 0.22 0.36 0.31
PM MPZ 58 31.8 5.0 5.3
PM MPZ 58 31.8 5.0 2.5 6.6
i MP 59 45.0
UGL 949 -iP MPZ 10 58 28.0 5.0 5.3 -3.2
8.5 -iP SPZ 58 28.0 0.80 -0.05
PM MPZ 58 32.0 4.0 1.6 8.1 8
PM SPZ 58 32.5 0.90 0.35 0.33 1.25 6.2
sP MPZ 58 49.0
OKH 995 iP MPZ 10 58 34.2
9.0 Pm MPZ 58 36.6 6.0 5 10.5 12.1 6.6 6.5
Pm SPZ 58 38.8 1.0 0.6 5.9
e SP 11 00 23.6
Sm MP 00 26.4 6.0 8.5
Sm MP 00 26.4 10 13.1 6.2
eL MP 01 3.8
M MP 02 32.0 16 37.7 54.5 31 6.0
NKL 1113 iP MPZ 10 58 48.0
10.0 Pm MPZ 58 50.0 8.0 2.4 7.5 6 6.2 6.2
Pm SPZ 58 52.5 1.1 0.055 0.023
i MP 11 00 48.0
Sm MP 00 55.0 11 6 8 6.0
eL MP 01 12.0
M MP 02 35.0 19 15 36 55 5.7
GRNR1352 iP SPZ 10 59 19.2
12.2 Pm SPZ 59 20.6 1.0 0.088 0.21 0.18
TEY 1460 eP SPZ 10 59 32.0
13.1 PM MPZ 59 37.0 3.0 2 5 5.1
EKMR1612 eP SPZ 10 59 50.5
14.5 Pm SPZ 59 57.5 1.2 0.12 0.71 1.02
sP SPZ 11 00 12.5
KLR 1694 iP SPZ 11 00 0.0
15.2 iP MPZ 00 0.0
Pm MPZ 00 26.5 12 12 10.5 6.4 6.3
e MP 02 53.0
Sm MP 03 11.5 9.0 16.2 9.7 6.7
e MP 03 52.5
M MP 07 2.0 13 20.9 48.7 6.0
BMKR1904 eP SPZ 11 00 22.4
17.1 Pm SPZ 00 28.3 0.60 0.059
YASR1943 eP SPZ 11 00 26.4
17.5 Pm SPZ 00 45.9 0.80 0.015 0.077 0.11
ZEA 1992 eP SPZ 11 00 30.9
17.9 Pm MPZ 00 37.0 9.0 2.7
Pm MPZ 00 37.0 6.0 4.5 6.4
Pm SPZ 00 38.4 1.2 0.12 0.17 0.18
e MP 03 48.0
Sm MP 04 15.5 11 6.5 4.4 6.0
M MP 07 41.0 19 7.5 36 6.1
KROS2020 eP SPZ 11 00 34.4
18.2 Pm SPZ 00 40.3 1.1 0.043 0.13 0.15
25 April 2003
51.1 + 0.06 N 155.4 + 0.14 E 0:00 02 29.2 + 1.5
H = 84 + 3 mbv(a) = 5.5/4, msh(a) = 5.2/1
SKR 67 iP MPZ 00 02 42.0 2.0 0.16
0.6 iP SPZ 02 42.0 0.50 0.15 0.49 3.08
Pm MPZ 02 42.6 1.0 10
Pm MPZ 02 42.6 0.20 0.06 0.19
Pm MPZ 02 42.6 0.50 0.05
Pm MPZ 02 42.6 1.0 2.8 3 10.8
Pm SPZ 02 42.6 0.50 2.31 7.44 5.9
Pm SPZ 02 42.6 0.25 1.73
i SP 02 45.8
iS SP 02 51.6
eS MP 02 52.4
Sm MP 02 53.9 0.70 0.11
Sm MP 02 53.9 0.60 0.51 0.49
Sm MP 02 54.0 1.5 50 50 12
Sm MP 02 54.0 1.5 49.8 41 12
PAU 106 eP SPZ 00 02 47.2
1.0 eS SP 03 2.9
PET 307 iP SPZ 00 03 10.0
2.8 Pm SPZ 03 17.0 0.40 0.096 4.7
eS SP 03 43.0
Sm SP 03 47.0 1.2 0.727 5.2
M MP 04 33.0 14 0.255
TYV 891 eP SPZ 00 04 31.0
8.0 Pm SPZ 04 32.8 1.2 0.041
YSS 1029 eP SPZ 00 04 45.3
9.3 Pm SPZ 04 47.0 0.90 0.02 4.8
e SP 05 55.3
YUK 1061 eP SPZ 00 04 44.2
9.6 Pm SPZ 04 45.0 0.40 0.39 6.5
EKMR1543 eP SPZ 00 05 49.3
13.9 Pm SPZ 05 54.8 0.60 0.008 0.004 0.033
27 April 2003
44.1 + 0.07 N 147.7 + 0.09 E 0:04 27 18.8 + 2.2
H = 67 + 13 mbv(a) = 5.0/1 K = 10.8 + 1.2
KUR 124 -iP SPZ 04 27 38.0 0.40 -0.1 -0.16
1.1 Pm SPZ 27 38.4 0.40 0.122 0.114 0.244
Pm MPZ 27 40.0 0.80 2.5
iS SP 27 52.0
Sm MP 27 53.0 0.60 11.25 7.5
Sm SP 27 56.5 0.50 3.8 3648 9.9
YUK 148 -iP SPZ 04 27 40.0 0.25 -0.39
1.3 Pm MPZ 27 41.3 0.40 5
Pm SPZ 27 42.1 0.20 0.52 1 5
Pm MPZ 27 42.2 0.17 0.13
Pm MPZ 27 42.3 0.14 0.12
Pm MPZ 27 42.9 0.14 0.19
iS SP 27 52.5
Sm SP 27 58.1 0.40 15.7 8.3 11.7
Sm MP 27 58.8 0.10 0.3
Sm MP 27 58.9 0.24 0.54
Sm MP 27 59.0 0.14 0.6
Sm MP 27 59.5 0.50 15.2 15.7
YSS 498 -iP SPZ 04 28 24.0 0.80 -0.04 0.04 -0.04
4.5 PM SPZ 28 25.0 0.60 0.09
e SP 28 39.5
iS SP 29 12.5
SM SP 29 15.9 0.70 0.06 0.06
M SP 30 6.0 19 0.3 0.4
UGL 699 eP SPZ 04 28 49.5
6.3 M MP 31 10.0 17 0.2
TYV 839 eP SPZ 04 29 9.0
7.6
SKR 960 eP SPZ 04 29 21.9
8.6 Pm SPZ 29 22.4 0.80 0.05 0.04 0.06 5.0
eS SP 30 53.5
Sm SP 30 56.5 1.0 0.1 0.1 0.1
PAU 1062 eP SPZ 04 29 33.5
9.6
NKL 1127 iP SPZ 04 29 42.2 1.2 0.06
10.1 Pm SPZ 29 43.5 1.2 0.04
PET 1271 e MP 04 29 44.0
11.4 e MP 31 49.0
M MP 33 37.0 20 0.135
KLR 1339 eP SPZ 04 30 11.8
12.1
EKMR1467 eP SPZ 04 30 24.9
13.2 Pm SPZ 30 27.9 1.0 0.011
YASR1759 eP SPZ 04 30 59.0
15.8 Pm SPZ 31 0.8 0.70 0.009
BMKR1790 eP SPZ 04 31 3.5
16.1 Pm SPZ 31 4.7 0.70 0.006
ZEA 1824 eP SPZ 04 31 6.4
16.4 Pm SPZ 31 7.3 1.0 0.012
KROS1878 eP SPZ 04 31 13.0
16.9 Pm SPZ 31 15.4 0.80 0.004
29 April 2003
48.9 + 0.06 N 155.5 + 0.23 E 0:01 38 56.6 + 3.3
H = 64 + 32 ms = 4.2/2, mbv(a) = 5.5/5 K = 11.2 + 0.2
SKR 206 iP SPZ 01 39 25.5 0.80 0.24
1.9 Pm MPZ 39 29.0 0.18 0.04
Pm MPZ 39 29.0 0.10 0.03 0.05
Pm MPZ 39 29.4 1.0 1.8 1.8 3
Pm SPZ 39 29.4 0.50 1.08 0.77 1.93 5.4
eS MP 39 46.2
iS SP 39 46.6
Sm MP 39 49.5 0.18 0.19 0.1
Sm MP 39 49.5 0.12 0.21
Sm MP 39 53.2 1.0 10 11.9
Sm MP 39 53.2 1.0 7.2 11 4
Sm SP 39 53.2 0.50 4.19 8.07 2.54 11.4
PAU 308 iP SPZ 01 39 38.5
2.8 iS SP 40 12.5
PET 513 iP SPZ 01 40 4.0
4.6 Pm MPZ 40 4.0 0.50 0.173
Pm SPZ 40 4.0 0.50 0.116 0.208 5.2
iP MPZ 40 4.0
eS SP 40 56.0
Sm MP 40 57.0 0.60 0.686
Sm SP 41 10.0 0.60 1.015 1.234 11.1
M MP 41 29.0 17 0.52
KUR 705 eP SPZ 01 40 31.4
6.3 Pm SPZ 40 32.5 0.50 0.05 0.14 5.3
e SP 41 2.2
Sm SP 41 4.4 0.60 0.15 0.17
YUK 912 eP SPZ 01 40 53.7
8.2 Pm SPZ 40 56.5 0.25 0.18 0.26 0.42 6.3
Pm MPZ 41 6.7 1.2 1.2
eS SP 42 23.0
Sm MP 42 41.0 1.2 1.1
Sm SP 42 47.7 0.50 0.14 0.24
TYV 947 eP SPZ 01 40 57.8
8.5 M MP 44 34.0 19 1.1
UGL 980 eP SPZ 01 41 3.9
8.8 Pm SPZ 41 5.0 0.50 0.052 5.1
eL SP 43 6.0
M MP 44 35.0 16 0.4 0.8 0.5 4.2
NKL 1139 eP SPZ 01 41 21.8 1.2 0.009
10.3
GRNR1382 eP SPZ 01 41 53.8
12.4
TEY 1492 eP SPZ 01 42 9.0
13.4
EKMR1641 eP SPZ 01 42 23.4
14.8 Pm SPZ 42 30.5 0.80 0.019 0.047 0.084
KLR 1725 eP SPZ 01 42 34.8
15.5 M MP 49 14.5 14 0.5 0.6 4.3
BMKR1931 eP SPZ 01 42 56.7
17.4 Pm SPZ 42 59.7 0.60 0.01
YASR1971 eP SPZ 01 43 0.0
17.7 Pm SPZ 43 2.2 0.70 0.003 0.009 0.016
ZEA 2020 eP SPZ 01 43 6.4
18.2
KROS2047 eP SPZ 01 43 8.5
18.4 Pm SPZ 43 10.4 0.50 0.005
29 April 2003
43.0 + 0.03 N 143.8 + 0.04 E 0:11 43 20.4 + 3.2
H = 57 + 2 msh = 4.9/1 K = 10.0 + 1.5
YUK 197 -iP MPZ 11 43 48.2 1.0 -2.7
1.8 -iP SPZ 43 48.5 0.40 -0.18
Pm MPZ 43 48.8 1.2 3 3 5
Pm SPZ 43 49.5 0.20 1.07 1.15 5.39
Pm MPZ 43 50.0 0.14 0.3
Pm MPZ 43 50.4 0.11 0.2
Pm MPZ 43 50.8 0.15 0.18
iS MP 44 9.0
Sm SP 44 10.1 0.50 19.3 15
Sm MP 44 10.3 0.80 20 35.2
Sm MP 44 10.9 0.18 0.37
Sm MP 44 11.2 0.20 0.81
Sm MP 44 13.2 0.16 0.5
KUR 403 eP SPZ 11 44 15.0
3.6 Pm SPZ 44 17.5 0.50 0.099
eS SP 44 58.2
Sm SP 45 1.8 0.50 0.456 0.319
YSS 443 +iP SPZ 11 44 21.2
4.0 PM SPZ 44 22.0 1.0 0.09
PM SPZ 44 22.0 0.70 0.07
sP SPZ 44 42.5
eS SP 45 7.0
SM SP 45 9.9 1.0 0.29
SM MP 45 10.0 1.6 0.5
TEY 619 eP SPZ 11 44 47.0
5.6
UGL 684 eP SPZ 11 44 51.0
6.2 PM SPZ 44 54.0 0.80 0.072
e SP 45 1.5
eS SP 46 0.5
Sm SP 46 3.5 0.90 0.056 0.1
Sm MP 46 5.5 2.0 0.4
TYV 874 eP SPZ 11 45 14.1
7.9 sP SPZ 45 35.9
KLR 1155 eP SPZ 11 45 51.8
10.4
YASR1629 eP SPZ 11 46 48.4
14.7 Pm SPZ 46 52.1 0.60 0.004
BMKR1690 Pm SPZ 11 46 55.7 0.60 0.005
15.2
ZEA 1697 eP SPZ 11 46 55.5
15.3 Pm SPZ 46 58.2 0.70 0.01
KROS1760 eP SPZ 11 47 0.5
15.8 Pm SPZ 47 3.4 0.50 0.003
29 April 2003
43.7 + 0.06 N 147.8 + 0.17 E 0:13 53 17.7 + 0.0
H = 29 + 4 ms = 5.7/8, mbv = 6.5/5, mbh = 6.3/4, mbv(a) = 6.3/2
YUK 158 -iP SPZ 13 53 41.3 0.20 -1.15 3.66 -9.74
1.4 Pm MPZ 53 43.2 0.20 3.9
Pm MPZ 53 43.3 0.22 3
Pm MPZ 53 45.0 0.20 3
eS MP 53 58.3
Sm MP 53 59.7 0.66 6.6
Sm MP 54 1.3 0.20 4.5
Sm MP 54 4.9 1.6 13
KUR 173 -iP MPZ 13 53 44.0 1.0 -55 -27 -55
1.6 -iP SPZ 53 44.0 0.50 -0.97 -0.21 -1.98
Pm MPZ 53 48.8 1.0 60 55 47.5
Pm MPZ 53 56.7 0.32 0.27 0.27 0.5
iS MP 54 2.0
Sm MP 54 4.5 0.20 0.6
Sm MP 54 4.5 0.30 1.5 2.95
Sm MP 54 6.0 3.0 255.5 501
YSS 535 -iP SPZ 13 54 29.0 1.0 -1.23 1.69 -1.86
4.8 -iP MPZ 54 29.0 4.0 -10.1 14.1 -10.1
-iP MPZ 54 29.0 4.0 -9.9 14.9 -12.9
eS MP 55 20.0
eLQ MP 55 39.0
eLR MP 55 53.0
M MP 56 24.0 19 57.3 48.4 67.3 5.7
M MP 56 24.0 18 40 44 54 5.6
UGL 743 -iP MPZ 13 54 54.5 4.0 -4.2 3 -4.9
6.7 -iP SPZ 54 54.5
PM MPZ 54 56.0 4.0 7.1
PM MPZ 54 56.0 4.0 5.7 4.8 7.1
PM SPZ 54 57.0 0.60 0.3 0.28 0.7
e SP 56 42.0
Sm MP 56 54.0 6.0 9.8
Sm MP 56 54.0 10 15.6
M MP 58 20.0 19 24.4 29.2 41 5.6
TYV 887 eP SPZ 13 55 12.0
8.0 Pm MPZ 55 16.0 4.0 5.7 5.2 6.5 6.5
Pm SPZ 55 19.2 0.80 0.132 6.5 6.5
eS SP 56 42.0
Sm MP 56 54.0 10 15.6
M MP 58 20.0 18 41 24.4 29.2 5.8
TEY 900 eP SPZ 13 55 16.0
8.1 Pm MPZ 56 20.0 6.0 5.2 5.6 6.3 6.1
eS MP 56 48.0
Sm MP 56 50.0 6.0 5.6 6.1
M MP 58 28.0 13 46.7
M MP 58 28.0 10 12.4
M MP 58 28.0 19 41.5 5.8
SKR 997 iP MPZ 13 55 22.5 4.0 5.6 4.4
9.0 iP SPZ 55 22.5 1.2 0.79 0.79
Pm MPZ 55 26.2 0.40 0.03 0.05
Pm SPZ 55 26.2 0.60 0.62 0.35 1.42 6.5
Pm MPZ 55 28.0 4.0 4.8 5 6.5 6.3
Pm MPZ 55 28.0 8.0 5.3 6.0
Pm MPZ 55 28.0 4.0 5 6 6.5
Pm MPZ 55 28.0 8.0 6 6.4
sP MPZ 55 35.0
eS SP 56 58.6
Sm SP 57 12.0 0.60 0.48 0.69 0.29
Sm MP 57 16.0 10 12.1 10
Sm MP 57 16.0 10 3.3 13.3 7.4
M MP 14 00 6.0 14 10.1 10.4 8.1 5.4
M MP 00 6.0 14 7.3 10.9 8.3 5.4
OKH 1158 iP SPZ 13 55 45.9
10.4 iP MPZ 55 45.9
Pm MPZ 55 47.0 4.4 6.4
Pm MPZ 55 47.0 6.0 13.5 6.7
Pm SPZ 55 48.0 0.50 0.7
eS MP 57 41.2
eS SP 57 41.2
Sm MP 57 49.8 9.0 12.2
eLQ MP 58 32.0
M MP 14 01 25.0 14 21.6 25.5 5.7
GRNR1162 iP SPZ 13 55 47.2
10.5 Pm SPZ 55 49.0 1.0 0.55 0.31 0.36
sP SPZ 56 0.0
KLR 1370 iP SPZ 13 56 13.0
12.3 iP MPZ 56 13.0 2.5 0.5 1.1 1
Pm SPZ 56 15.0 2.2 0.13 0.42 0.31
Pm MPZ 56 32.5 7.5 3.4 6.5 10.1 6.7 6.3
e MP 58 28.5
M MP 14 02 24.5 13 10.9 25.4 5.3 5.9
EKMR1508 eP SPZ 13 56 28.3
13.6 Pm SPZ 56 44.5 1.0 0.23 0.21 0.51
YASR1797 eP SPZ 13 57 0.7
16.2 sP SPZ 57 12.0
sP SPZ 57 14.0
Pm SPZ 57 21.2 1.2 0.26 0.53 1.204
BMKR1831 eP SPZ 13 57 5.7
16.5 Pm SPZ 57 9.5 0.70 0.186
ZEA 1862 eP SPZ 13 57 8.5
16.8 iP MPZ 57 8.5 4.0 3 4.2 5.2
Pm SPZ 57 10.8 1.4 0.57 0.57 0.96
Pm MPZ 57 17.0 4.0 1.6 1.7 3.4
sP MPZ 57 22.0
e MP 14 00 11.0