Data reports contributed by: IEPN
The data reports listed here are those filed by the ISC's automated data e-mail capture system. The system was first implemented in October 1999, and many reports were filed manually during the first few months. The listing is nearly complete for reports e-mailed to the ISC since January 2000, but even then missing an occasional, manually filed report.
Columns
- REPORTER: The agency code for a data contributor.
- PRODUCT: A string from the data report that describes the type of data.
- REPORTER_ID: A string from the data report that describes each report.
- MIN_DATE: The date of the earliest reading or hypocentre in the data report. N.B. This will be NULL for reports recieved before November 1999.
- MAX_DATE: The date of the earliest reading or hypocentre in the data report. N.B. This may be NULL for reports recieved before November 1999.
- LDDATE: The date the description of this report was loaded into the ISC database; generally, the same as the date the e-mail was received at the ISC.
Links
Each Reporter_ID is a link to the file containing the data report. For some agencies, the ISC concatenates multiple reports for a calendar month into a single file. In these cases, a separate line will appear in this table for each report, but the links will all retrieve the same file, containing all of the reports for the month.
REPORTER PRODUCT REPORTER_ID MIN_DATE MAX_DATE LDDATE IEPN Phases 2017-12c 21/12/2017 31/12/2017 16/01/2019 IEPN Phases 2017-12b 11/12/2017 20/12/2017 16/01/2019 IEPN Phases 2017-12a 01/12/2017 10/12/2017 16/01/2019 IEPN Phases 2017-11c 21/11/2017 30/11/2017 16/01/2019 IEPN Phases 2017-11b 11/11/2017 21/11/2017 16/01/2019 IEPN Phases 2017-11a 01/11/2017 10/11/2017 16/01/2019 IEPN Phases 2017-10c 22/10/2017 31/10/2017 16/01/2019 IEPN Phases 2017-10b 11/10/2017 20/10/2017 16/01/2019 IEPN Phases 2017-10a 01/10/2017 10/10/2017 16/01/2019 IEPN Phases 2017-09c 21/09/2017 01/10/2017 16/01/2019 IEPN Phases 2017-09b 11/09/2017 20/09/2017 16/01/2019 IEPN Phases 2017-09a 01/09/2017 10/09/2017 16/01/2019 IEPN Phases 2017-08c 21/08/2017 31/08/2017 16/01/2019 IEPN Phases 2017-08b 11/08/2017 21/08/2017 16/01/2019 IEPN Phases 2017-08a 01/08/2017 10/08/2017 16/01/2019 IEPN Phases 2017-07c 21/07/2017 31/07/2017 16/01/2019 IEPN Phases 2017-07b 11/07/2017 20/07/2017 16/01/2019 IEPN Phases 2017-07a 01/07/2017 10/07/2017 16/01/2019 IEPN Phases 2017-06c 21/06/2017 30/06/2017 15/01/2019 IEPN Phases 2017-06b 15/06/2017 20/06/2017 15/01/2019 IEPN Phases 2017-05c 21/05/2017 22/05/2017 15/01/2019 IEPN Phases 2017-05b 11/05/2017 20/05/2017 15/01/2019 IEPN Phases 2017-05a 01/05/2017 11/05/2017 15/01/2019 IEPN Phases 2017-04c 21/04/2017 30/04/2017 15/01/2019 IEPN Phases 2017-04b 11/04/2017 20/04/2017 15/01/2019 IEPN Phases 2017-04a 01/04/2017 10/04/2017 15/01/2019 IEPN Phases 2017-03c 21/03/2017 31/03/2017 15/01/2019 IEPN Phases 2017-03b 11/03/2017 20/03/2017 15/01/2019 IEPN Phases 2017-03a 01/03/2017 10/03/2017 15/01/2019 IEPN Phases 2017-02c 21/02/2017 28/02/2017 15/01/2019 IEPN Phases 2017-02b 11/02/2017 20/02/2017 15/01/2019 IEPN Phases 2017-02a 01/02/2017 10/02/2017 15/01/2019 IEPN Phases 2017-01c 21/01/2017 31/01/2017 15/01/2019 IEPN Phases 2017-01b 11/01/2017 20/01/2017 15/01/2019 IEPN Phases 2017-01a 01/01/2017 10/01/2017 15/01/2019 IEPN Phases 2016-12c 21/12/2016 31/12/2016 15/01/2019 IEPN Phases 2016-12b 11/12/2016 20/12/2016 15/01/2019 IEPN Phases 2016-12a 01/12/2016 10/12/2016 15/01/2019 IEPN Phases 2016-11c 21/11/2016 30/11/2016 15/01/2019 IEPN Phases 2016-11b 11/11/2016 20/11/2016 15/01/2019 IEPN Phases 2016-11a 01/11/2016 10/11/2016 15/01/2019 IEPN Phases 2016-10c 21/10/2016 31/10/2016 14/01/2019 IEPN Phases 2016-10b 11/10/2016 20/10/2016 14/01/2019 IEPN Phases 2016-10a 01/10/2016 10/10/2016 14/01/2019 IEPN Phases 2016-09c 21/09/2016 30/09/2016 07/12/2018 IEPN Phases 2016-09b 11/09/2016 20/09/2016 07/12/2018 IEPN Phases 2016-09a 01/09/2016 10/09/2016 07/12/2018 IEPN Phases 2016-08c 21/08/2016 31/08/2016 07/12/2018 IEPN Phases 2016-08b 11/08/2016 20/08/2016 07/12/2018 IEPN Phases 2016-08a 01/08/2016 10/08/2016 07/12/2018 IEPN Phases 2016-07c 21/07/2016 01/08/2016 07/12/2018 IEPN Phases 2016-07b 11/07/2016 20/07/2016 07/12/2018 IEPN Phases 2016-07a 01/07/2016 10/07/2016 07/12/2018 IEPN Phases 2016-06c 21/06/2016 30/06/2016 16/10/2018 IEPN Phases 2016-06b 11/06/2016 20/06/2016 16/10/2018 IEPN Phases 2016-06a 04/06/2016 10/06/2016 16/10/2018 IEPN Phases 2016-05c 21/05/2016 31/05/2016 15/10/2018 IEPN Phases 2016-05b 11/05/2016 20/05/2016 15/10/2018 IEPN Phases 2016-05a 01/05/2016 10/05/2016 15/10/2018 IEPN Phases 2016-04c 21/04/2016 30/04/2016 17/09/2018 IEPN Phases 2016-04b 11/04/2016 20/04/2016 17/09/2018 IEPN Phases 2016-04a 01/04/2016 10/04/2016 17/09/2018 IEPN Phases 2016-03c 21/03/2016 31/03/2016 17/09/2018 IEPN Phases 2016-03b 11/03/2016 20/03/2016 17/09/2018 IEPN Phases 2016-03a 01/03/2016 10/03/2016 17/09/2018 IEPN Phases 2016-02c 21/02/2016 29/02/2016 31/08/2018 IEPN Phases 2016-02b 11/02/2016 20/02/2016 31/08/2018 IEPN Phases 2016-02a 01/02/2016 10/02/2016 31/08/2018 IEPN Phases 2016-01c 21/01/2016 31/01/2016 13/08/2018 IEPN Phases 2016-01b 11/01/2016 20/01/2016 13/08/2018 IEPN Phases 2016-01a 05/01/2016 10/01/2016 13/08/2018 IEPN Bulletin 2017-12 01/12/2017 31/12/2017 06/07/2018 IEPN Bulletin 2017-11 02/11/2017 30/11/2017 06/07/2018 IEPN Bulletin 2017-10 01/10/2017 31/10/2017 06/07/2018 IEPN Bulletin 2017-09 01/09/2017 30/09/2017 06/07/2018 IEPN Bulletin 2017-08 01/08/2017 31/08/2017 06/07/2018 IEPN Bulletin 2017-07 01/07/2017 31/07/2017 06/07/2018 IEPN Bulletin 2017-06 01/06/2017 30/06/2017 06/07/2018 IEPN Bulletin 2017-05 01/05/2017 31/05/2017 06/07/2018 IEPN Bulletin 2017-04 01/04/2017 28/04/2017 06/07/2018 IEPN Bulletin 2017-03 01/03/2017 31/03/2017 06/07/2018 IEPN Bulletin 2017-02 01/02/2017 27/02/2017 06/07/2018 IEPN Bulletin 2017-01 01/01/2017 31/01/2017 06/07/2018 IEPN Bulletin 2016-12 01/12/2016 31/12/2016 06/07/2018 IEPN Bulletin 2016-11 01/11/2016 29/11/2016 06/07/2018 IEPN Bulletin 2016-10 01/10/2016 31/10/2016 06/07/2018 IEPN Bulletin 2016-09 01/09/2016 30/09/2016 06/07/2018 IEPN Bulletin 2016-08 01/08/2016 31/08/2016 06/07/2018 IEPN Bulletin 2016-07 01/07/2016 30/07/2016 06/07/2018 IEPN Bulletin 2016-06 01/06/2016 30/06/2016 06/07/2018 IEPN Bulletin 2016-05 01/05/2016 31/05/2016 06/07/2018 IEPN Bulletin 2016-04 01/04/2016 30/04/2016 06/07/2018 IEPN Bulletin 2016-03 01/03/2016 30/03/2016 06/07/2018 IEPN Bulletin 2016-02 01/02/2016 29/02/2016 06/07/2018 IEPN Bulletin 2016-01 03/01/2016 29/01/2016 06/07/2018 IEPN Phases 1965-1992 11/11/1965 03/01/1992 14/02/2018 IEPN Phases 2015-12c 21/12/2015 31/12/2015 11/07/2017 IEPN Phases 2015-12b 11/12/2015 20/12/2015 11/07/2017 IEPN Phases 2015-12a 01/12/2015 10/12/2015 11/07/2017 IEPN Phases 2015-11c 21/11/2015 30/11/2015 10/07/2017 IEPN Phases 2015-11b 11/11/2015 20/11/2015 10/07/2017 IEPN Phases 2015-11a 07/11/2015 10/11/2015 10/07/2017 IEPN Phases 2015-10c 21/10/2015 23/10/2015 10/07/2017 IEPN Phases 2015-10b 11/10/2015 20/10/2015 10/07/2017 IEPN Phases 2015-10a 01/10/2015 10/10/2015 10/07/2017 IEPN Phases 2015-09c 21/09/2015 30/09/2015 10/07/2017 IEPN Phases 2015-09b 11/09/2015 20/09/2015 10/07/2017 IEPN Phases 2015-09a 01/09/2015 10/09/2015 10/07/2017 IEPN Phases 2015-08c 21/08/2015 31/08/2015 07/07/2017 IEPN Phases 2015-08b 11/08/2015 20/08/2015 07/07/2017 IEPN Phases 2015-08a 01/08/2015 10/08/2015 07/07/2017 IEPN Phases 2015-07c 21/07/2015 31/07/2015 07/07/2017 IEPN Phases 2015-07b 11/07/2015 20/07/2015 07/07/2017 IEPN Phases 2015-07a 01/07/2015 10/07/2015 07/07/2017 IEPN Phases 2015-06c 21/06/2015 30/06/2015 03/07/2017 IEPN Phases 2015-06b 11/06/2015 21/06/2015 03/07/2017 IEPN Phases 2015-06a 01/06/2015 10/06/2015 03/07/2017 IEPN Phases 2015-05c 21/05/2015 31/05/2015 30/06/2017 IEPN Phases 2015-05b 12/05/2015 20/05/2015 30/06/2017 IEPN Phases 2015-05a 01/05/2015 05/05/2015 30/06/2017 IEPN Phases 2015-04c 21/04/2015 30/04/2015 28/06/2017 IEPN Phases 2015-04b 11/04/2015 20/04/2015 28/06/2017 IEPN Phases 2015-04a 01/04/2015 10/04/2015 28/06/2017 IEPN Bulletin 2015-12 02/12/2015 31/12/2015 27/06/2017 IEPN Bulletin 2015-11 02/11/2015 28/11/2015 27/06/2017 IEPN Bulletin 2015-10 03/10/2015 30/10/2015 27/06/2017 IEPN Bulletin 2015-09 01/09/2015 18/09/2015 27/06/2017 IEPN Bulletin 2015-08 07/08/2015 31/08/2015 27/06/2017 IEPN Bulletin 2015-07 01/07/2015 30/07/2015 27/06/2017 IEPN Bulletin 2015-06 01/06/2015 30/06/2015 27/06/2017 IEPN Bulletin 2015-05 01/05/2015 30/05/2015 27/06/2017 IEPN Bulletin 2015-04 01/04/2015 30/04/2015 27/06/2017 IEPN Bulletin 2015-03 03/03/2015 31/03/2015 27/06/2017 IEPN Bulletin 2015-02 01/02/2015 27/02/2015 27/06/2017 IEPN Bulletin 2015-01 01/01/2015 31/01/2015 27/06/2017 IEPN Phases 2015-03c 21/03/2015 30/03/2015 27/06/2017 IEPN Phases 2015-03b 11/03/2015 20/03/2015 27/06/2017 IEPN Phases 2015-03a 01/03/2015 10/03/2015 27/06/2017 IEPN Phases 2015-02c 21/02/2015 28/02/2015 27/06/2017 IEPN Phases 2015-02b 11/02/2015 20/02/2015 27/06/2017 IEPN Phases 2015-02a 01/02/2015 10/02/2015 27/06/2017 IEPN Phases 2015-01c 21/01/2015 31/01/2015 27/06/2017 IEPN Phases 2015-01b 11/01/2015 20/01/2015 27/06/2017 IEPN Phases 2015-01a 01/01/2015 10/01/2015 27/06/2017 IEPN Phases 2014-12c 21/12/2014 31/12/2014 26/06/2017 IEPN Phases 2014-12b 11/12/2014 20/12/2014 26/06/2017 IEPN Phases 2014-12a 01/12/2014 10/12/2014 26/06/2017 IEPN Phases 2014-11c 21/11/2014 30/11/2014 28/04/2017 IEPN Phases 2014-11b 11/11/2014 20/11/2014 28/04/2017 IEPN Phases 2014-11a 01/11/2014 10/11/2014 28/04/2017 IEPN Phases 2014-10c 26/10/2014 31/10/2014 21/04/2017 IEPN Phases 2014-10b 11/10/2014 17/10/2014 21/04/2017 IEPN Phases 2014-10a 01/10/2014 10/10/2014 21/04/2017 IEPN Phases 2014-09c 21/09/2014 30/09/2014 07/04/2017 IEPN Phases 2014-09b 11/09/2014 20/09/2014 07/04/2017 IEPN Phases 2014-09a 01/09/2014 10/09/2014 07/04/2017 IEPN Phases 2014-08c 21/08/2014 31/08/2014 07/04/2017 IEPN Phases 2014-08b 11/08/2014 20/08/2014 07/04/2017 IEPN Phases 2014-08a 01/08/2014 10/08/2014 07/04/2017 IEPN Phases 2014-07c 21/07/2014 31/07/2014 06/04/2017 IEPN Phases 2014-07b 11/07/2014 20/07/2014 06/04/2017 IEPN Phases 2014-07a 01/07/2014 10/07/2014 06/04/2017 IEPN Phases 2014-06c 21/06/2014 30/06/2014 23/03/2017 IEPN Phases 2014-06b 11/06/2014 20/06/2014 23/03/2017 IEPN Phases 2014-06a 01/06/2014 10/06/2014 23/03/2017 IEPN Phases 2014-05c 21/05/2014 31/05/2014 06/02/2017 IEPN Phases 2014-05b 11/05/2014 20/05/2014 06/02/2017 IEPN Phases 2014-05a 01/05/2014 10/05/2014 06/02/2017 IEPN Phases 2014-04c 21/04/2014 30/04/2014 30/12/2016 IEPN Phases 2014-04b 11/04/2014 20/04/2014 30/12/2016 IEPN Phases 2014-04a 01/04/2014 11/04/2014 30/12/2016 IEPN Phases 2014-03c 21/03/2014 31/03/2014 30/12/2016 IEPN Phases 2014-03b 11/03/2014 20/03/2014 30/12/2016 IEPN Phases 2014-03a 01/03/2014 10/03/2014 30/12/2016 IEPN Phases 2014-02c 21/02/2014 28/02/2014 09/12/2016 IEPN Phases 2014-02b 11/02/2014 20/02/2014 09/12/2016 IEPN Phases 2014-02a 01/02/2014 10/02/2014 01/11/2016 IEPN Phases 2014-01a 21/01/2014 31/01/2014 05/10/2016 IEPN Bulletin 2014-12 02/12/2014 30/12/2014 16/06/2016 IEPN Bulletin 2014-11 01/11/2014 30/11/2014 16/06/2016 IEPN Bulletin 2014-10 02/10/2014 31/10/2014 16/06/2016 IEPN Bulletin 2014-09 01/09/2014 30/09/2014 16/06/2016 IEPN Bulletin 2014-08 01/08/2014 31/08/2014 16/06/2016 IEPN Bulletin 2014-07 01/07/2014 28/07/2014 16/06/2016 IEPN Bulletin 2014-06 01/06/2014 29/06/2014 16/06/2016 IEPN Bulletin 2014-05 01/05/2014 31/05/2014 16/06/2016 IEPN Bulletin 2014-04 01/04/2014 30/04/2014 16/06/2016 IEPN Bulletin 2014-03 02/03/2014 31/03/2014 16/06/2016 IEPN Bulletin 2014-02 01/02/2014 28/02/2014 16/06/2016 IEPN Bulletin 2014-01 01/01/2014 31/01/2014 16/06/2016 IEPN Phases 2013-11c 21/11/2013 28/11/2013 09/11/2015 IEPN Phases 2013-11b 11/11/2013 20/11/2013 09/11/2015 IEPN Phases 2013-11a 01/11/2013 10/11/2013 09/11/2015 IEPN Phases 2013-09b 11/09/2013 17/09/2013 09/11/2015 IEPN Phases 2013-09a 01/09/2013 10/09/2013 09/11/2015 IEPN Phases 2013-08c 21/08/2013 31/08/2013 04/11/2015 IEPN Phases 2013-08b 11/08/2013 20/08/2013 04/11/2015 IEPN Phases 2013-08a 01/08/2013 10/08/2013 04/11/2015 IEPN Phases 2013-06c 21/06/2013 27/06/2013 03/11/2015 IEPN Phases 2013-06b 11/06/2013 20/06/2013 03/11/2015 IEPN Phases 2013-04c 21/04/2013 30/04/2013 11/09/2015 IEPN Phases 2013-04b 11/04/2013 20/04/2013 11/09/2015 IEPN Phases 2013-04a 01/04/2013 10/04/2013 11/09/2015 IEPN Phases 2013-03c 21/03/2013 31/03/2013 19/03/2015 IEPN Phases 2013-03b 11/03/2013 20/03/2013 19/03/2015 IEPN Phases 2013-03a 01/03/2013 10/03/2013 19/03/2015 IEPN Phases 2013-02c 21/02/2013 28/02/2013 19/03/2015 IEPN Phases 2013-02b 11/02/2013 20/02/2013 19/03/2015 IEPN Phases 2013-02a 01/02/2013 10/02/2013 19/03/2015 IEPN Bulletin 2013-12 01/12/2013 31/12/2013 18/03/2015 IEPN Bulletin 2013-11 01/11/2013 30/11/2013 18/03/2015 IEPN Bulletin 2013-10 03/10/2013 31/10/2013 18/03/2015 IEPN Bulletin 2013-09 01/09/2013 29/09/2013 18/03/2015 IEPN Bulletin 2013-08 01/08/2013 26/08/2013 18/03/2015 IEPN Bulletin 2013-07 02/07/2013 31/07/2013 18/03/2015 IEPN Bulletin 2013-06 01/06/2013 30/06/2013 18/03/2015 IEPN Bulletin 2013-05 03/05/2013 30/05/2013 18/03/2015 IEPN Bulletin 2013-04 01/04/2013 30/04/2013 18/03/2015 IEPN Bulletin 2013-03 01/03/2013 31/03/2013 18/03/2015 IEPN Bulletin 2013-02 01/02/2013 28/02/2013 18/03/2015 IEPN Phases 2013-01c 21/01/2013 31/01/2013 13/03/2015 IEPN Phases 2013-01b 11/01/2013 20/01/2013 13/03/2015 IEPN Phases 2013-01a 01/01/2013 10/01/2013 12/03/2015 IEPN Bulletin 2013-01 01/01/2013 31/01/2013 12/03/2015 IEPN Phases 2012-12c 21/12/2012 31/12/2012 11/12/2014 IEPN Phases 2012-12b 11/12/2012 20/12/2012 11/12/2014 IEPN Phases 2012-12a 01/12/2012 10/12/2012 11/12/2014 IEPN Phases 2012-11c 21/11/2012 30/11/2012 11/12/2014 IEPN Phases 2012-11b 16/11/2012 20/11/2012 11/12/2014 IEPN Phases 2012-08c 21/08/2012 24/08/2012 11/12/2014 IEPN Phases 2012-08b 11/08/2012 20/08/2012 11/12/2014 IEPN Phases 2012-08a 01/08/2012 10/08/2012 11/12/2014 IEPN Phases 2012-07c 21/07/2012 31/07/2012 20/11/2014 IEPN Phases 2012-07b 11/07/2012 20/07/2012 20/11/2014 IEPN Phases 2012-07a 01/07/2012 10/07/2012 20/11/2014 IEPN Phases 2012-06c 21/06/2012 30/06/2012 29/09/2014 IEPN Phases 2012-06b 11/06/2012 20/06/2012 29/09/2014 IEPN Phases 2012-06a 01/06/2012 10/06/2012 29/09/2014 IEPN Phases 2012-05c 21/05/2012 31/05/2012 25/09/2014 IEPN Phases 2012-05b 11/05/2012 20/05/2012 25/09/2014 IEPN Phases 2012-05a 01/05/2012 10/05/2012 25/09/2014 IEPN Bulletin 2012-12 01/12/2012 31/12/2012 09/09/2014 IEPN Bulletin 2012-11 01/11/2012 29/11/2012 09/09/2014 IEPN Bulletin 2012-10 02/10/2012 31/10/2012 09/09/2014 IEPN Bulletin 2012-09 08/09/2012 18/09/2012 09/09/2014 IEPN Bulletin 2012-08 08/08/2012 16/08/2012 09/09/2014 IEPN Bulletin 2012-07 02/07/2012 28/07/2012 09/09/2014 IEPN Bulletin 2012-06 01/06/2012 30/06/2012 09/09/2014 IEPN Bulletin 2012-05 01/05/2012 31/05/2012 09/09/2014 IEPN Phases 2012-04c 21/04/2012 30/04/2012 31/07/2014 IEPN Phases 2012-04b 11/04/2012 20/04/2012 31/07/2014 IEPN Phases 2012-04a 01/04/2012 10/04/2012 31/07/2014 IEPN Phases 2012-03c 21/03/2012 31/03/2012 29/07/2014 IEPN Phases 2012-03b 11/03/2012 20/03/2012 29/07/2014 IEPN Phases 2012-03a 01/03/2012 10/03/2012 29/07/2014 IEPN Phases 2012-02c 21/02/2012 29/02/2012 29/07/2014 IEPN Phases 2012-02b 11/02/2012 20/02/2012 29/07/2014 IEPN Phases 2012-02a 01/02/2012 10/02/2012 29/07/2014 IEPN Bulletin 2012-02 01/02/2012 28/02/2012 28/07/2014 IEPN Bulletin 2012-04 02/04/2012 30/04/2012 28/07/2014 IEPN Bulletin 2012-03 02/03/2012 31/03/2012 28/07/2014 IEPN Phases 2012-01c 21/01/2012 31/01/2012 18/07/2014 IEPN Phases 2012-01b 11/01/2012 20/01/2012 18/07/2014 IEPN Phases 2012-01a 01/01/2012 10/01/2012 18/07/2014 IEPN Bulletin 2012-01 03/01/2012 30/01/2012 18/07/2014